X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-25371"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-25371
 
| Well ID: 37-031-25371
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.147958, -79.493753 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.147958, -79.493753 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/22/2010
+
| Spud Date: 2010-09-22
 
|-
 
|-
| Permit Date: 4/23/2010
+
| Permit Date: 2010-04-23
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 94: Line 119:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 112: Line 137:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 121: Line 146:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 151: Line 176:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 182:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[ABARTA OIL & GAS CO INC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 381.00 Bbl
 
| style="text-align: right;" | 381.00 Bbl
Line 162: Line 189:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-0
+
| 2011
| Drilling Fluid Waste (in Barrels)
+
| [[ABARTA OIL & GAS CO INC]]
| style="text-align: right;" | 200.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 190.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-0
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[ABARTA OIL & GAS CO INC]]
| style="text-align: right;" | 190.00 Bbl
+
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 200.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[ABARTA OIL & GAS CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 141.00 Bbl
 
| style="text-align: right;" | 141.00 Bbl
Line 180: Line 210:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[ABARTA OIL & GAS CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
Line 186: Line 217:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[ABARTA OIL & GAS CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 10.00 Bbl
 
| style="text-align: right;" | 10.00 Bbl
Line 192: Line 224:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-0
+
| 2016
 +
| [[ABARTA OIL & GAS CO INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 17.00 Bbl
 
| style="text-align: right;" | 17.00 Bbl
Line 217: Line 250:
 
| 1916398
 
| 1916398
 
| Primary Facility
 
| Primary Facility
| 09/24/2010
+
| 2010-09-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 224: Line 257:
 
| 1916569
 
| 1916569
 
| Primary Facility
 
| Primary Facility
| 09/28/2010
+
| 2010-09-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 231: Line 264:
 
| 1919820
 
| 1919820
 
| Primary Facility
 
| Primary Facility
| 10/14/2010
+
| 2010-10-14
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 238: Line 271:
 
| 1994291
 
| 1994291
 
| Primary Facility
 
| Primary Facility
| 07/25/2011
+
| 2011-07-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 245: Line 278:
 
| 2013743
 
| 2013743
 
| Primary Facility
 
| Primary Facility
| 10/26/2011
+
| 2011-10-26
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 252: Line 285:
 
| 2022566
 
| 2022566
 
| Primary Facility
 
| Primary Facility
| 11/28/2011
+
| 2011-11-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 259: Line 292:
 
| 2050862
 
| 2050862
 
| Primary Facility
 
| Primary Facility
| 03/14/2012
+
| 2012-03-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 266: Line 299:
 
| 2293574
 
| 2293574
 
| Primary Facility
 
| Primary Facility
| 08/08/2014
+
| 2014-08-08
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 292: Line 325:
 
| 596224
 
| 596224
 
| 09/28/2010
 
| 09/28/2010
| 10/14/2010
+
| 2010-09-28
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| Administrative
 
| Administrative
Line 300: Line 333:
 
| 596225
 
| 596225
 
| 09/28/2010
 
| 09/28/2010
| 10/14/2010
+
| 2010-09-28
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 308: Line 341:
 
| 596226
 
| 596226
 
| 09/28/2010
 
| 09/28/2010
| 10/14/2010
+
| 2010-09-28
 
| 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102.
 
| 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102.
 
| Administrative
 
| Administrative
Line 316: Line 349:
 
| 617295
 
| 617295
 
| 07/25/2011
 
| 07/25/2011
| 10/26/2011
+
| 2011-07-25
 
| 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production.
 
| 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production.
 
| Administrative
 
| Administrative
Line 338: Line 371:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 346: Line 379:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/05/2013
+
| 2013-12-05
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
Line 356: Line 389:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 364: Line 397:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/05/2013
+
| 2013-12-05
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
Line 374: Line 407:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 382: Line 415:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/05/2013
+
| 2013-12-05
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
Line 392: Line 425:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 400: Line 433:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/05/2013
+
| 2013-12-05
| 12/05/2013
+
| 2013-12-05
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
 
| style="text-align: right;" | $20,000.00
Line 412: Line 445:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 20:48, 21 August 2019

Well Details

Well ID: 37-031-25371
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Piney Township
Operator Name: ABARTA OIL & GAS CO INC
Well Pad ID:
Farm/Lease Name: PINE RUN 11
License Status: Active
Spud Date: 2010-09-22
Permit Date: 2010-04-23
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.147958
Longitude: -79.493753

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ABARTA OIL & GAS CO INC 112.00 31 0.00 0 0.00 0
2011 ABARTA OIL & GAS CO INC 3,357.00 365 0.00 0 0.00 0
2012 ABARTA OIL & GAS CO INC 3,304.00 365 93.00 365 0.00 0
2013 ABARTA OIL & GAS CO INC 2,461.00 365 87.00 365 0.00 0
2014 ABARTA OIL & GAS CO INC 1,994.00 365 21.00 365 0.00 0
2015 ABARTA OIL & GAS CO INC 1,504.00 365 12.00 365 0.00 0
2016 ABARTA OIL & GAS CO INC 1,603.00 365 54.00 365 0.00 0
2017 ABARTA OIL & GAS CO INC 1,521.00 365 0.00 0 0.00 0
2018 ABARTA OIL & GAS CO INC 1,300.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ABARTA OIL & GAS CO INC Drilling Fluid Waste (in Barrels) 381.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 ABARTA OIL & GAS CO INC Fracing Fluid Waste (in Barrels) 190.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 ABARTA OIL & GAS CO INC Drilling Fluid Waste (in Barrels) 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 ABARTA OIL & GAS CO INC Produced Fluid (in Barrels) 141.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 ABARTA OIL & GAS CO INC Produced Fluid (in Barrels) 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 ABARTA OIL & GAS CO INC Produced Fluid (in Barrels) 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 ABARTA OIL & GAS CO INC Produced Fluid (in Barrels) RWC 802 17.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1916398 Primary Facility 2010-09-24 Drilling/Alteration No Violations Noted
1916569 Primary Facility 2010-09-28 Routine/Complete Inspection Violation(s) Noted
1919820 Primary Facility 2010-10-14 Compliance Evaluation No Violations Noted
1994291 Primary Facility 2011-07-25 Routine/Complete Inspection Violation(s) Noted
2013743 Primary Facility 2011-10-26 Compliance Evaluation No Violations Noted
2022566 Primary Facility 2011-11-28 Routine/Complete Inspection No Violations Noted
2050862 Primary Facility 2012-03-14 Routine/Complete Inspection No Violations Noted
2293574 Primary Facility 2014-08-08 Administrative/File Review No Violations Noted
2671184 Primary Facility 2017-12-14 Routine/Partial Inspection No Violations Noted Well is connected to sales line producing on a 30 day chart. Plunger lift system connected to well. Separator and 100 barrel tank connected to the well.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1916569 596224 09/28/2010 2010-09-28 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative
1916569 596225 09/28/2010 2010-09-28 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1916569 596226 09/28/2010 2010-09-28 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative
1994291 617295 07/25/2011 2011-07-25 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
596224 269741 NOV - Notice of Violation Comply/Closed 2013-12-05
596224 305495 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-12-05 2013-12-05 $20,000.00 $20,000.00
596225 269741 NOV - Notice of Violation Comply/Closed 2013-12-05
596225 305495 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-12-05 2013-12-05 $20,000.00 $20,000.00
596226 269741 NOV - Notice of Violation Comply/Closed 2013-12-05
596226 305495 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-12-05 2013-12-05 $20,000.00 $20,000.00
617295 275235 NOV - Notice of Violation Comply/Closed 2013-12-05
617295 305495 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-12-05 2013-12-05 $20,000.00 $20,000.00

For data sources see[6]

References