X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-23353"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-23353
 
| Well ID: 37-033-23353
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.889121, -78.641681 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.889121, -78.641681 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: SOLLEY UNIT 1
 
| Farm/Lease Name: SOLLEY UNIT 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1991-08-01
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 1991-06-13
 
| Permit Date: 1991-06-13
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.889121
 
| Latitude: 40.889121
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1991-06-13
 +
| New Permit Application
 +
|-
 +
| 1991-08-01
 +
| Performed Spud Operation
 +
|-
 +
| 1991-08-20
 +
| Drilling Completion
 +
|-
 +
| 1992-03-18
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 84: Line 122:
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
!scope="col" | Water Production Days
 +
|-
 +
| 1994
 +
| [[VICTORY DEV CO]]
 +
| style="text-align: right;" | 32351.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 23,150.00
+
| style="text-align: right;" | 23150
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 143:
 
| 1997
 
| 1997
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 21,133.00
+
| style="text-align: right;" | 21133
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 152:
 
| 1998
 
| 1998
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 17,788.00
+
| style="text-align: right;" | 17788
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 161:
 
| 1999
 
| 1999
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 15,233.00
+
| style="text-align: right;" | 15233
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 123: Line 170:
 
| 2001
 
| 2001
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 13,355.00
+
| style="text-align: right;" | 13355
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 132: Line 179:
 
| 2002
 
| 2002
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 10,262.55
+
| style="text-align: right;" | 10262.55
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 141: Line 188:
 
| 2003
 
| 2003
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 11,290.08
+
| style="text-align: right;" | 11290.08
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 150: Line 197:
 
| 2004
 
| 2004
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 10,630.83
+
| style="text-align: right;" | 10630.83
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 159: Line 206:
 
| 2005
 
| 2005
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 13,682.58
+
| style="text-align: right;" | 13682.58
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 168: Line 215:
 
| 2006
 
| 2006
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 9,290.00
+
| style="text-align: right;" | 9290.00
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 177: Line 224:
 
| 2007
 
| 2007
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 8,458.00
+
| style="text-align: right;" | 8458.35
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 186: Line 233:
 
| 2008
 
| 2008
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 7,098.30
+
| style="text-align: right;" | 7098.30
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 195: Line 242:
 
| 2009
 
| 2009
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 8,657.53
+
| style="text-align: right;" | 8657.53
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 329: Line 376:
 
| 2010
 
| 2010
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
 
| Road Spreading
 
| Road Spreading
Line 336: Line 383:
 
| 2011
 
| 2011
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
 
| Road Spreading
 
| Road Spreading

Latest revision as of 01:21, 23 May 2020

Well Details

Well ID: 37-033-23353
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Greenwood Township
Operator Name: VEC ENERGY LLC
Well Pad ID:
Farm/Lease Name: SOLLEY UNIT 1
License Status: ACTIVE
Spud Date:
Permit Date: 1991-06-13
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.889121
Longitude: -78.641681

For data sources see[1][2][3]

Well History

Date Event
1991-06-13 New Permit Application
1991-08-01 Performed Spud Operation
1991-08-20 Drilling Completion
1992-03-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1994 VICTORY DEV CO 32351.00 363 0.00 0 0.00 0
1996 VICTORY ENERGY CORP 23150 357 0.00 0 0.00 0
1997 VICTORY ENERGY CORP 21133 362 0.00 0 0.00 0
1998 VICTORY ENERGY CORP 17788 354 0.00 0 0.00 0
1999 VICTORY ENERGY CORP 15233 365 0.00 0 0.00 0
2001 VICTORY ENERGY CORP 13355 365 0.00 0 0.00 0
2002 VICTORY ENERGY CORP 10262.55 365 0.00 0 0.00 0
2003 VICTORY ENERGY CORP 11290.08 365 0.00 0 0.00 0
2004 VICTORY ENERGY CORP 10630.83 365 0.00 0 0.00 0
2005 VICTORY ENERGY CORP 13682.58 364 0.00 0 0.00 0
2006 VICTORY ENERGY CORP 9290.00 361 0.00 0 0.00 0
2007 VICTORY ENERGY CORP 8458.35 353 0.00 0 0.00 0
2008 VICTORY ENERGY CORP 7098.30 355 0.00 0 0.00 0
2009 VICTORY ENERGY CORP 8657.53 358 0.00 0 0.00 0
2010 VICTORY ENERGY CORP 8,611.49 355 0.00 0 0.00 0
2011 VICTORY ENERGY CORP 7,260.56 363 0.00 0 0.00 0
2012 SNYDER BROS INC 7,233.00 362 0.00 0 0.00 0
2013 SNYDER BROS INC 7,001.30 364 0.00 0 0.00 0
2014 SNYDER BROS INC 6,102.67 361 0.00 0 0.00 0
2015 SNYDER BROS INC 5,026.27 322 0.00 0 0.00 0
2016 SNYDER BROS INC 4,224.40 344 0.00 0 0.00 0
2017 SNYDER BROS INC 3,781.86 365 0.00 0 0.00 0
2018 VEC ENERGY LLC 4,110.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2002 VICTORY ENERGY CORP Brine 20.00 Bbl Other
2003 VICTORY ENERGY CORP Brine 55.00 Bbl Road Spreading
2006 VICTORY ENERGY CORP Brine 55.00 Bbl Reuse other than road spreading 033-25927
2008 VICTORY ENERGY CORP Brine 60.00 Bbl Road Spreading
2010 VICTORY ENERGY CORP Produced Fluid 20.00 Bbl Road Spreading
2011 VICTORY ENERGY CORP Produced Fluid 70.00 Bbl Road Spreading

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
370973 Primary Facility 1992-04-29 Site Restoration No Violations Noted SITE RESTORED; TANK

For data sources see[7]

References