X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25379

Well Details

Well ID: 37-059-25379
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 149437
Farm/Lease Name: THOMPSON 590199
License Status: Active
Spud Date: 2010-03-10
Permit Date: 2009-12-14
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.953304
Longitude: -80.101770

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-04-30 2011-04-30 8005.00 4,326,840.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SP Breaker Halliburton Energy Services Oxidizing Breaker Sodium persulfate 7775-27-1 100.00 0.00050000
Hydrochloric Acid Halliburton Energy Services 15 HCl Acid
LGC-36 Halliburton Energy Services Gelling Agent Naphtha, petroleum, hydrotreated heavy 64742-48-9 30.00 0.01
Guar gum 9000-30-0 30.00 0.01
GBW-30 BREAKER Halliburton Energy Services Enzyme Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00005000
Hydrochloric Acid Halliburton Energy Services Corrosion Inhibitor Methanol 67-56-1 60.00 0.00121000
Propargyl alcohol 107-19-7 10.00 0.00020000
Hydrochloric acid 7647-01-0 28.00 0.12
BA-40L Halliburton Energy Services Buffer Carbonic acid, dipotassium salt 584-08-7 60.00 0.01
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00255000
BE-9 Biocide Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00428000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0 0.00 0 0.00 0
2010 EQT PROD CO 0.00 0 0.00 0 0.00 0
2011 EQT PROD CO 618,681.00 195 0.00 11 0.00 11
2012 EQT PROD CO 570,002.00 366 0.00 0 0.00 0
2013 EQT PROD CO 377,423.00 365 0.00 0 0.00 0
2014 EQT PROD CO 220,014.00 365 0.00 0 0.00 0
2015 EQT PROD CO 226,324.00 363 0.00 0 0.00 0
2016 EQT PROD CO 200,996.00 366 0.00 0 0.00 0
2017 EQT PROD CO 180,807.00 365 0.00 0 0.00 0
2018 EQT PROD CO 131,461.00 365 0.00 0 0.00 0
2019 EQT PROD CO 28,636.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A01 Drilling Fluid Waste (in Barrels) 0.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Drilling Fluid Waste (in Barrels) 0.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S02 Drilling Fluid Waste (in Barrels) 1,210.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-S01 Drilling Fluid Waste (in Barrels) 7,478.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-S01 Fracing Fluid Waste (in Barrels) 14,751.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S01 Produced Fluid (in Barrels) 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011-S01 Produced Fluid (in Barrels) 605.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-S01 Produced Fluid (in Barrels) 231.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2011-S01 Produced Fluid (in Barrels) 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2011-S01 Produced Fluid (in Barrels) 705.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011-S01 Produced Fluid (in Barrels) 428.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S02 Produced Fluid (in Barrels) 219.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-23390
2011-S02 Produced Fluid (in Barrels) 1,019.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011-S02 Produced Fluid (in Barrels) 1,600.00 Bbl INJECTION DISPOSAL WELL 34-009-22704
2011-S02 Produced Fluid (in Barrels) 2,955.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011-S02 Produced Fluid (in Barrels) 110.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2011-S02 Produced Fluid (in Barrels) 173.00 Bbl INJECTION DISPOSAL WELL 34-115-21896
2011-S02 Produced Fluid (in Barrels) 154.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2011-S02 Produced Fluid (in Barrels) 220.00 Bbl INJECTION DISPOSAL WELL 34-127-26595
2011-S02 Produced Fluid (in Barrels) 698.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2011-S02 Produced Fluid (in Barrels) 112.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2012-S01 Produced Fluid (in Barrels) 1,863.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012-S01 Produced Fluid (in Barrels) 114.00 Bbl INJECTION DISPOSAL WELL 34-167-28466
2012-S01 Produced Fluid (in Barrels) 1,010.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Fracing Fluid Waste (in Barrels) 100.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012-S02 Produced Fluid (in Barrels) 105.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012-S02 Produced Fluid (in Barrels) 990.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 1,334.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 832.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 1,905.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Fracturing Fluid Waste (in Tons) 24.00 Tons LANDFILL SWF 1032-WV0109
2014-S02 Produced Fluid (in Barrels) 932.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 55.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-S01 Produced Fluid (in Barrels) 927.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 605.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 275.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 110.00 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2017-M06 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M08 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 220.00 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 32.00 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 33.70 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 32.65 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 29.10 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 7.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M02 Produced Fluid (in Barrels) RWC 802 3.86 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 8.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M03 Produced Fluid (in Barrels) RWC 802 12.52 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 4.05 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M04 Produced Fluid (in Barrels) RWC 802 7.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M04 Produced Fluid (in Barrels) RWC 802 4.20 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 4.69 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 5.47 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 5.96 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 6.14 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 12.20 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 5.92 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 12.38 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M11 Produced Fluid (in Barrels) RWC 802 5.40 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 6.75 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 83.60 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M02 Produced Fluid (in Barrels) RWC 802 10.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M02 Produced Fluid (in Barrels) RWC 802 21.09 Bbl REUSE (AT WELL PAD)
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 15.71 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 5.69 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1901638 Primary Facility 2010-07-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2057327 Primary Facility 2012-04-05 Routine/Complete Inspection No Violations Noted SITE LOOKED GOOD AT TIME OF INSPECTION.
2164814 Primary Facility 2011-06-28 Incident- Response to Accident or Event In Compliance with Policy Spilled 40-50 Barrels of Brine. Red Oak was contracted to excavate contaminated soil and dispose at the landfill. The Operator is In Compliance with policy.
2514633 Primary Facility 2016-07-07 Routine/Complete Inspection No Violations Noted

On 07/07/16 at approximately 1400 hours I met with EQT staff to discuss site vegetation at the Thompson well pad. The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated, but there were some locations of sparse vegetation (see photographs). Once the sparse locations reach 70% vegetative cover EQT is going to submit for an NOT for the site. There were no violations observed at the time of inspection.

2531504 Primary Facility 2016-10-13 Routine/Complete Inspection No Violations Noted

On 10/13/16 at approximately 1300 hours I conducted a site restoration inspection in response to an NOT submittal by EQT. The Act 9 sign was in place and all required documents were present in the mail box. There were no signs of erosion observed at the time of inspection. The site was well vegetated and meets the requirement of uniform 70% vegetative cover. The NOT is approved.

For data sources see[7]

References