If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-27300 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.947414,"lon":-80.223389,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Washington Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: | |
Farm/Lease Name: ROUGH HOLLOW 593860 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-02-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.947414 | |
Longitude: -80.223389 |
Date | Event |
---|---|
2017-02-14 | New Permit Application |
2017-12-28 | Permit Renewal Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2635715 | Primary Facility | 2017-09-08 | Routine/Complete Inspection | No Violations Noted | On Friday, September 8, 2017, I conducted a routine-complete inspection at the Rough Hollow Well Site located in Washington Township, Greene County.
The Act 9 sign and a sign displaying gas well API numbers were in place and clearly legible at the site entrance. All required documentation was available on-site. The access road and the well pad were in good condition and overall, the site is well vegetated with uniform perennial vegetation except for a few spotty areas of growth on the soil stockpile behind the AST pad. At the time of inspection, Cellar Tech was on-site advancing mouse holes next to each conductor in preparation for moving a triple rig on-site within the next week or so. Other contractors were on-site building the GPUs and preparing the production tanks and the associated secondary containment. No violations were identified during the inspection. |
For data sources see[5]