X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-27654"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-27654
 
| Well ID: 37-063-27654
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.602646, -79.221217 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.602646, -79.221217 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HAROLD JONES 4
 
| Farm/Lease Name: HAROLD JONES 4
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
 
| Spud Date: 1983-09-23
 
| Spud Date: 1983-09-23
 
|-
 
|-
 
| Permit Date: 1983-09-20
 
| Permit Date: 1983-09-20
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.602646
 
| Latitude: 40.602646
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1983-09-20
 +
| New Permit Application
 +
|-
 +
| 1983-09-23
 +
| Performed Spud Operation
 +
|-
 +
| 1983-10-06
 +
| Perforation
 +
|-
 +
| 1983-10-07
 +
| Drilling Completion
 +
|-
 +
| 1984-01-12
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 1991
 
| 1991
 
| [[FAIRMAN OIL & GAS CO INC]]
 
| [[FAIRMAN OIL & GAS CO INC]]
| style="text-align: right;" | 10,460.00
+
| style="text-align: right;" | 10460.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992
 +
| [[FAIRMAN DRILLING CO]]
 +
| style="text-align: right;" | 9562.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993
 +
| [[FAIRMAN DRILLING CO]]
 +
| style="text-align: right;" | 8393.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 155:
 
| 1994
 
| 1994
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 7,577.00
+
| style="text-align: right;" | 7577.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 164:
 
| 1996
 
| 1996
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 5,654.00
+
| style="text-align: right;" | 5654
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 173:
 
| 1997
 
| 1997
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 4,647.00
+
| style="text-align: right;" | 4647
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 123: Line 182:
 
| 1998
 
| 1998
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 6,275.00
+
| style="text-align: right;" | 6275
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 132: Line 191:
 
| 1999
 
| 1999
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 7,735.00
+
| style="text-align: right;" | 7735
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 141: Line 200:
 
| 2000
 
| 2000
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 5,407.00
+
| style="text-align: right;" | 5407
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 150: Line 209:
 
| 2001
 
| 2001
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 4,664.00
+
| style="text-align: right;" | 4664
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 159: Line 218:
 
| 2002
 
| 2002
 
| [[FAIRMAN DRILLING CO]]
 
| [[FAIRMAN DRILLING CO]]
| style="text-align: right;" | 4,312.00
+
| style="text-align: right;" | 4312
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 168: Line 227:
 
| 2003
 
| 2003
 
| [[FAIRMAN CORP]]
 
| [[FAIRMAN CORP]]
| style="text-align: right;" | 3,393.00
+
| style="text-align: right;" | 3393
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00

Latest revision as of 15:58, 15 May 2020

Well Details

Well ID: 37-063-27654
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: FAIRMAN CORP
Well Pad ID:
Farm/Lease Name: HAROLD JONES 4
License Status: ACTIVE
Spud Date: 1983-09-23
Permit Date: 1983-09-20
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.602646
Longitude: -79.221217

For data sources see[1][2][3]

Well History

Date Event
1983-09-20 New Permit Application
1983-09-23 Performed Spud Operation
1983-10-06 Perforation
1983-10-07 Drilling Completion
1984-01-12 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 FAIRMAN OIL & GAS CO INC 10460.00 365 0.00 0 0.00 0
1992 FAIRMAN DRILLING CO 9562.00 365 0.00 0 0.00 0
1993 FAIRMAN DRILLING CO 8393.00 365 0.00 0 0.00 0
1994 FAIRMAN DRILLING CO 7577.00 365 0.00 0 0.00 0
1996 FAIRMAN DRILLING CO 5654 365 0.00 0 0.00 0
1997 FAIRMAN DRILLING CO 4647 365 0.00 0 0.00 0
1998 FAIRMAN DRILLING CO 6275 365 0.00 0 0.00 0
1999 FAIRMAN DRILLING CO 7735 365 0.00 0 0.00 0
2000 FAIRMAN DRILLING CO 5407 365 0.00 0 0.00 0
2001 FAIRMAN DRILLING CO 4664 365 0.00 0 0.00 0
2002 FAIRMAN DRILLING CO 4312 365 0.00 0 0.00 0
2003 FAIRMAN CORP 3393 365 0.00 0 0.00 0
2010 FAIRMAN CORP 3,165.00 365 0.00 0 0.00 0
2011 FAIRMAN CORP 2,950.67 365 0.00 0 0.00 0
2012 FAIRMAN CORP 3,173.87 365 0.00 0 0.00 0
2013 FAIRMAN CORP 2,871.64 365 0.00 0 0.00 0
2014 FAIRMAN CORP 2,754.00 365 0.00 0 0.00 0
2015 FAIRMAN CORP 1,296.67 214 0.00 0 0.00 0
2016 FAIRMAN CORP 2,031.67 305 0.00 0 0.00 0
2017 FAIRMAN CORP 1,557.00 365 0.00 0 0.00 0
2018 FAIRMAN CORP 2,071.85 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1991 FAIRMAN OIL & GAS CO INC Brine 10.00 Bbl
1994 FAIRMAN DRILLING CO Brine 10.00 Bbl
1996 FAIRMAN DRILLING CO Brine 10.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
1997 FAIRMAN DRILLING CO Brine 10.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
1998 FAIRMAN DRILLING CO Brine 10.00 Bbl Brine or Industrial Waste Treatment Plt 0026310

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2500271 Primary Facility 2016-07-11 Routine/Complete Inspection No Violations Noted At time of inspection no E&S issues observed on shared access road. No E&S issues on site, located in Ag field.

Well appears equipped for production. Well tag present. Brine tank appears structurally sound.

For data sources see[7]

References