37-113-20020

Well Details

Well ID: 37-113-20020
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Forks Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 147822
Farm/Lease Name: BLACK CREEK 6H
License Status:
Spud Date: 2011-05-12
Permit Date: 2010-08-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.545717
Longitude: -76.493050

For data sources see[1][2][3]

Well History

Date Event
2010-08-09 New Permit Application
2011-04-28 Performed Spud Operation
2011-06-09 Drilling Completion
2011-09-22 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-12-07 2011-12-07 4,724,622

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh Sand Proppant Quartz 14808-60-7 100.00 1.37
Ottawa Sand Proppant Quartz 14808-60-7 100.00 12.40
Recycled Produced Water Carrier/Base Fluid 10.51
Feriplex 40 - Acid - Additives Pumpco Services Iron Control Agent Sodium hydroxide 1310-73-2 1.00 0.00001000
Sodium sulfate 7757-82-6 2.00 0.00001000
Nitrilotriacetic acid trisodium monohydrate 18662-53-8 40.00 0.00024000
Water 7732-18-5 60.00 0.00036000
Fresh Water Carrier/Base Fluid 75.33
Acid HCL Pumpco Services Acid Hydrochloric acid 7647-01-0 15.00 0.04
Water 7732-18-5 85.00 0.24
Plexhib 256 Pumpco Services Corrosion Inhibitor Propargyl alcohol 107-19-7 10.00 0.00003000
Methanol 67-56-1 60.00 0.00018000
Thiourea polymer 68527-49-1 30.00 0.00009000
Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00001000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00009000
B-84 X-Chem Antibacterial Agent Glutaraldehyde 111-30-8 27.00 0.00869000
Ethanol 64-17-5 4.00 0.00129000
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.50 0.00177000
Didecyl dimethyl ammonium chloride 7173-51-5 8.00 0.00257000
Plexslick 921 Pumpco Services Friction Reducer Water 7732-18-5 40.00 0.01
2-Propenoic acid, polymer with 2-propenamide 9003-06-9 28.00 0.00989000
Distillates, petroleum, hydrotreated light 64742-47-8 35.00 0.01
TS-15 X-Chem Scale Inhibitor Sodium polycarboxylate 100.00 0.00951000
Plexbreak 145 Pumpco Services Non-Emulsifier Water 7732-18-5 65.00 0.00048000
Diethanolamine 111-42-2 3.00 0.00002000
2-Butoxyethanol 111-76-2 15.00 0.00011000
Coconut oil acid/Diethanolamine condensate (2:1) 68603-42-9 7.00 0.00005000
Methanol 67-56-1 15.00 0.00011000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 66,478.00 9 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 2,100,029.00 364 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 971,797.00 361 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 571,096.00 323 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 630,003.00 298 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 635,377.00 365 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 433,436.00 350 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 530,391.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 4,073.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,598.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 101.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 5,924.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,458.14 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 567.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 522.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 55.00 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 222.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 103.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 228.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 222.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1972443 Primary Facility 2011-05-12 Drilling/Alteration No Violations Noted
1976841 Primary Facility 2011-05-26 Drilling/Alteration No Violations Noted 13 3/8 0-370 370sks 15.6
1977721 Primary Facility 2011-06-02 Drilling/Alteration No Violations Noted Patterson UTI Rig 154 Comp. man Ricky Carroll
1979206 Primary Facility 2011-06-09 Drilling/Alteration No Violations Noted Patterson UTI Rig 154 Drillers log ok, need to mark BOP tests in book
1981107 Primary Facility 2011-06-16 Drilling/Alteration No Violations Noted rig moving off site - going to Abel
1987847 Primary Facility 2011-07-14 Routine/Complete Inspection No Violations Noted site looks good, rig recently moved off
2003141 Primary Facility 2011-09-14 Routine/Complete Inspection No Violations Noted After region flooding checked to see if wetland encroachment -- no encroachment
2025996 Primary Facility 2011-12-08 Routine/Complete Inspection No Violations Noted
2028373 Primary Facility 2011-12-20 Routine/Complete Inspection No Violations Noted
2031137 Primary Facility 2012-01-03 Follow-up Inspection No Violations Noted
2057638 Primary Facility 2012-04-04 Routine/Complete Inspection No Violations Noted
2137244 Primary Facility 2012-10-01 Follow-up Inspection No Violations Noted
2235655 Primary Facility 2014-01-09 Routine/Complete Inspection No Violations Noted
2352747 Primary Facility 2015-03-17 Routine/Complete Inspection No Violations Noted
2490847 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted Vegetative cover on site consists of perennial vegetation with a density greater than 70%. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion and sedimentation was observed.

A 2-year extension of time to restore the site was granted by the Department on March 1, 2016. This extension extends the deadline to restore the site under Title 58 Pa. C.S. § 3216 (2012 Oil and Gas Act)(relating to site restoration) until March 1, 2018. A condition of the restoration extension requires that post-construction stormwater management (PCSM) BMPs be installed by June 1, 2016, unless additional time is requested, and approved, in writing by the Department. At the time of inspection, no PCSM BMPs were in place, and no evidence such as staking or flagging were present that would indicate the imminent construction of such BMPs. Further, the Departmen't s records do not indicate that a request to extend the deadline to implement PCSM BMPs was received or approved.

In order to r

2496670 Primary Facility 2016-06-20 Routine/Complete Inspection No Violations Noted Arrived @ 12:40. Weather warm and sunny. Chesapeake E&S staff were at the bottom of the fill slope. There was one producing well and a total of six slots on the pad. The slots were covered with metal plates.

Black Creek 6H, in production. Water-filled cellar, no bubbling. 2 annular vents. 13-3/8” x 9-5/8” plumbed to the dump line, -0.53 psi. 9-5/8” x 5-1/2”: shut in to gauge: -2 psi 5-1/2” casing: 18.70 psi 2-3/8” tubing: 1204 psi. Left @ 13:15

2540623 Primary Facility 2016-12-01 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.

Vegetative cover on site consists of perennial vegetation with a density greater than 70%. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion and sedimentation was observed.

The post-construction stormwater management (PCSM) BMPs required by the extension of time for site restoration approved by the Department on March 1, 2016 have been installed. Erosion and sediment control BMPs were in place around the PCSM features and the areas were well vegetated.

No violationis were cited during this inspection.

2596765 Primary Facility 2017-05-23 Routine/Complete Inspection No Violations Noted One well in production phase. One each sand and water separator. No leaks detected from production equipment. A separate pipeline is run to the well pad that is not connected to the well. Site stable. No violations.
2628876 Primary Facility 2017-08-23 Routine/Complete Inspection No Violations Noted Arrived @ 12:15. 6 cellars, 1 well in prod. No personnel on site. Left @ 12:35
2813421 Primary Facility 2018-12-10 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 13:47; the weather was ~30°F and calm.

There was 1 well onsite and a total of 6 cellars. All well cellars were covered. There was also 1 GPU, 1 sand separator, and 2 produced water tanks in secondary containment. There was a large amount of material and equipment being stored on the pad. If the equipment belongs to Chesapeake it should be removed unless land owner consent was obtained prior to storage. However, most of the material appears to be farming related (a tractor and a large number of straw bales).

The site was well vegetated with the exception of some steep rock lined slopes. No E&S issues were observed. Overall, the site appeared stable.

No violation were noted during the inspection.

For data sources see[8]