X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28594"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[PENNECO OIL CO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 167: Line 167:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 172: Line 173:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-A00
+
| 2011
| Drilling Fluid Waste (in Barrels)
+
| [[PENNECO OIL CO INC]]
| style="text-align: right;" | 4,010.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 160.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0101508
 
|-
 
|-
| 2011-A00
+
| 2011
 +
| [[PENNECO OIL CO INC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
Line 184: Line 187:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-A00
+
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 4,010.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,385.71 Bbl
 
| style="text-align: right;" | 2,385.71 Bbl
Line 190: Line 201:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-A00
+
| 2012
| Produced Fluid (in Barrels)
+
| [[PENNECO OIL CO INC]]
| style="text-align: right;" | 160.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
|-
 
| 2012-A00
 
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 320.00 Bbl
 
| style="text-align: right;" | 320.00 Bbl
Line 202: Line 208:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2012-A00
+
| 2012
| Drilling Fluid Waste (in Barrels)
+
| [[PENNECO OIL CO INC]]
| style="text-align: right;" | 1,070.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 240.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-A00
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[PENNECO OIL CO INC]]
| style="text-align: right;" | 240.00 Bbl
+
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,070.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-A00
+
| 2012
 +
| [[PENNECO OIL CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,003.00 Bbl
 
| style="text-align: right;" | 1,003.00 Bbl
Line 220: Line 229:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2013-A00
+
| 2013
 +
| [[PENNECO OIL CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 250.50 Bbl
 
| style="text-align: right;" | 250.50 Bbl
Line 226: Line 236:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2014-A00
+
| 2014
 +
| [[PENNECO OIL CO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 109.00 Bbl
 
| style="text-align: right;" | 109.00 Bbl
Line 232: Line 243:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2016-A00
+
| 2016
 +
| [[PENNECO OIL CO INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 238: Line 250:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2017-A00
+
| 2017
 +
| [[PENNECO OIL CO INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| style="text-align: right;" | 102.00 Bbl

Revision as of 05:36, 21 August 2019

Well Details

Well ID: 37-129-28594
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Upper Burrell Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: MCCRADY UNIT 4H
License Status: Active
Spud Date: 2011-07-18
Permit Date: 2011-05-18
Unconventional Well: N
Configuration: Deviated Well
Latitude: 40.525842
Longitude: -79.674981

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2012 PENNECO OIL CO INC 3,882.00 274 7,148.03 274 0.00 0
2013 PENNECO OIL CO INC 9,298.00 335 1,994.03 335 0.00 0
2014 PENNECO OIL CO INC 13,189.00 365 1,271.99 365 0.00 0
2015 PENNECO OIL CO INC 11,461.89 365 460.84 184 0.00 0
2016 PENNECO OIL CO INC 10,020.03 366 428.21 119 0.00 0
2017 PENNECO OIL CO INC 8,967.00 365 397.42 365 0.00 0
2018 PENNECO OIL CO INC 8,441.28 365 386.16 153 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Produced Fluid (in Barrels) 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste (in Barrels) 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste (in Barrels) 4,010.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Fracing Fluid Waste (in Barrels) 2,385.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PENNECO OIL CO INC Drilling Fluid Waste (in Barrels) 320.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 PENNECO OIL CO INC Fracing Fluid Waste (in Barrels) 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PENNECO OIL CO INC Drilling Fluid Waste (in Barrels) 1,070.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PENNECO OIL CO INC Produced Fluid (in Barrels) 1,003.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid (in Barrels) 250.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid (in Barrels) 109.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2017 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 102.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1989944 Primary Facility 2011-07-20 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 circulating hole (hose repair required) at time of inspection. 24" hole at 355'. Well spud in 19:00 07-18-11.
1991920 Primary Facility 2011-07-28 Routine/Complete Inspection No Violations Noted Rig is on-site. Drilling in progress. Site ID sign and E&S plan located along the access road. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
1993376 Primary Facility 2011-08-03 Complaint Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Drill pits located onsite. Pits contained drill cuttings and fluids. Pits had more than the required two feet of lined freeboard. E&S controls had been implemented as outlined in the E&S plan. Operator should continue to monitor the erosion controls to insure their continued functionality until well development activities are completed.
1996855 Primary Facility 2011-07-27 Drilling/Alteration No Violations Noted US Energy Rig#4 RD20 drilling 12 3/8" hole at 1524' at time of inspection. Pit lined and freeboard maintained.
1996860 Primary Facility 2011-08-02 Drilling/Alteration No Violations Noted US Energy Rig#4 RD20 tripping out of hole at time of inspection. Pit lined and freeboard maintained.
1996871 Primary Facility 2011-08-04 Drilling/Alteration No Violations Noted US Energy Rig#4 RD20 tripping out of 7 7/8" hole at time of inspection. 7 7/8" hole at 3365' TVD. Pit lined and freeboard maintained.
1996886 Primary Facility 2011-08-08 Drilling/Alteration No Violations Noted Well shut in on 9 5/8" x 2" swage. Pit lined and freeboard maintained.
2000226 Primary Facility 2011-08-24 Drilling/Alteration No Violations Noted US Energy Rig#8 Speedstar building curve (7 7/8" hole) at 3061' at time of inspection. Pit lined and freeboard maintained.
2001428 Primary Facility 2011-09-06 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Two below grade pits located onsite and both have more than the required two feet of lined freeboard. There was no accelerated erosion or sedimentation observed in relation to the access road or well-site.
2013315 Primary Facility 2011-10-18 Drilling/Alteration No Violations Noted Multi Production Systems service rig swabbing oil well (post frac) at time of inspection. Pits lined and freeboard maintained.
2038105 Primary Facility 2012-01-25 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Above ground tanks located onsite and they appeared to be in sound condition. The diked area around the tanks contained no fluids. A second drill pit had been constructed onsite. The second pit had been properly lined and the contents of the first drill pit had been moved to the second pit. Second pit had more than the required two feet of lined freeboard. Phone conversation with Penneco confirmed that this was so that the first pit may be relined and reused when drilling the McCrady 5H well. All access road and site erosion controls were functioning properly and there was no observed accelerated erosion or sedimenation in relation to either the access road or well-site.
2044963 Primary Facility 2012-02-23 Routine/Complete Inspection No Violations Noted
2069611 Primary Facility 2012-05-21 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to drilled and equipped for production. The brine tank, pump jack, and well apparatus appear to be in sound condition. No accelerated erosion observed in relation to the access road or well pad area at the time of inspection.
2380334 Primary Facility 2015-06-18 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The brine tank, pump jack and well apparatus appear to be in sound condition. The site appeared to be restored. No observation of accelerated erosion or sedimentation in relation to the well site or access road.

For data sources see[6]

References