X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20156"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20156
 
| Well ID: 37-131-20156
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.640783, -75.811002 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.640783, -75.811003 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Wyoming County, Pennsylvania|Wyoming]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Nicholson Township, Wyoming County, Pennsylvania|Nicholson Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Wyoming_County,_Pennsylvania|Wyoming]]
 +
|-
 +
| Municipality: [[Nicholson Township,_Wyoming_County,_Pennsylvania|Nicholson Township]]
 
|-
 
|-
 
| Operator Name: [[CHIEF OIL & GAS LLC]]
 
| Operator Name: [[CHIEF OIL & GAS LLC]]
 
|-
 
|-
| Well Pad ID: [[149079|149079]]
+
| Well Pad ID: [[149079]]
 
|-
 
|-
 
| Farm/Lease Name: POLOVITCH UNIT 1H
 
| Farm/Lease Name: POLOVITCH UNIT 1H
 
|-
 
|-
| First Permit Date: 2011-03-22
+
| License Status: Plugged OG Well
|-
 
| Last Permit Date: 2011-03-22
 
|-
 
| Spud Date: 2011-03-28
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 03/28/2011
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 3/22/2011
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 1
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 41.640783
 
| Latitude: 41.640783
 
|-
 
|-
| Longitude: -75.811002
+
| Longitude: -75.811003
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 101,239.00
 +
| style="text-align: right;" | 63
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2012
| style="text-align:right;" | 101239.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 63.0
+
| style="text-align: right;" | 399,032.47
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 343,569.00
 +
| style="text-align: right;" | 230
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2014
| style="text-align:right;" | 201386.47
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 116,171.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 202
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2016
| style="text-align:right;" | 197646.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2017
| 2013-1
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 94381.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 50.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2013-2
 
| style="text-align:right;" | 249188.0
 
| style="text-align:right;" | 180.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 115671.0
 
| style="text-align:right;" | 151.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 500.0
 
| style="text-align:right;" | 51.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-1
+
| 2011-S01
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,143.30 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
| WAYNE TOWNSHIP LANDFILL
 
| MC ELHATTAN
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S01
| 2011-1
+
| Drill Cuttings (in Tons)
| DRILL CUTTINGS
+
| style="text-align: right;" | 659.38 Tons
| style="text-align:right;" | 659.38
 
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301626
 
| 301626
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
|-
 
 
|-
 
|-
| 2011-1
+
| 2011-S01
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 357.0
+
| style="text-align: right;" | 357.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0008451
 
| PA0008451
| SUNBURY GENERATION WASTE WATER TRMT FAC
 
| SHAMOKIN DAM
 
| PA
 
|-
 
 
|-
 
|-
| 2011-2
+
| 2011-S02
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,272.61 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301626
 
| 301626
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
|-
 
 
|-
 
|-
| 2011-2
+
| 2011-S02
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 3,130.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| FRAC WATER REUSE
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2012-S01
| 2012-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 1,722.00 Bbl
| style="text-align:right;" | 1.0
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|
 
|-
 
 
|-
 
|-
| 2012-2
+
| 2012-S02
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 656.3
+
| style="text-align: right;" | 656.30 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|
 
|-
 
 
|-
 
|-
| 2013-1
+
| 2013-S01
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 639.4
+
| style="text-align: right;" | 639.40 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|
 
|-
 
 
|-
 
|-
| 2013-2
+
| 2013-S02
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 110.0
+
| style="text-align: right;" | 110.00 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC018
 
| WMGR123NC018
| EUREKA RESOURCES STANDING STONE TWP FACILITY
+
|-
 +
| 2013-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 455.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2014-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 429.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW018
 
|-
 
|-
| 2013-2
+
| 2014-S01
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 455.0
+
| style="text-align: right;" | 292.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|  
+
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 202.50 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
|-
+
| 2015-S01
| 2014-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 46.47 Bbl
| style="text-align:right;" | 292.0
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2016-S01
| 2014-1
+
| Fracturing Fluid Waste (in Barrels) RWC 805
| PRODUCED FLUID
+
| style="text-align: right;" | 40.00 Bbl
| style="text-align:right;" | 429.0
 
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123D001X
+
| WMGR123
| TERRAQUA RESOURCE MANAGEMENT
 
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
|-
+
| 2018-M06
| 2014-2
+
| Spent Lubricant Waste (in Barrels) RWC 809
| PRODUCED FLUID
+
| style="text-align: right;" | 12.81 Bbl
| style="text-align:right;" | 202.5
+
| LANDFILL
| Bbl
+
| 301358
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|  
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1960667
 
| 1960667
| 2011-03-28
+
| Primary Facility
 +
| 03/28/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| big rig- probably Thurs,  still laying plastic, etc,getting ready to spud,  have permit on site
 
| big rig- probably Thurs,  still laying plastic, etc,getting ready to spud,  have permit on site
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1965039
 
| 1965039
| 2011-04-11
+
| Primary Facility
 +
| 04/11/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| AT 1823'  drilling to 1825' then set csg and cement- probably tonight, using Universal
 
| AT 1823'  drilling to 1825' then set csg and cement- probably tonight, using Universal
UDI Rig 58
 
Drillers log - good
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1965671
 
| 1965671
| 2011-04-14
+
| Primary Facility
 +
| 04/14/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| UDI Rig 58
 
| UDI Rig 58
got copy of cement and csg report
 
BOP tested 4/14/2011  1500/2500lbs for 5 min
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1968964
 
| 1968964
| 2011-04-28
+
| Primary Facility
 +
| 04/28/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| UDI 58
 
| UDI 58
TD @ 6:45 AM 4/28/2011
 
discussed containment, BOP testing - put in drillers log
 
checked drillers log
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1969661
 
| 1969661
| 2011-05-02
+
| Primary Facility
 +
| 05/02/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 5 1/2" csg set @ 10026' with 1180 sx    cement report attached
 
| 5 1/2" csg set @ 10026' with 1180 sx    cement report attached
Well is done.  Cleaning up rig and site.  Will skid rig and drill another well at site.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1990412
 
| 1990412
| 2011-07-25
+
| Primary Facility
 +
| 07/25/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| All 3 annuli have a vent pipe running to a frac tank.
 
| All 3 annuli have a vent pipe running to a frac tank.
No containment under pipes.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1996398
 
| 1996398
| 2011-08-17
+
| Primary Facility
 +
| 08/17/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Comp. Man - Max Lee,  Fracing, hoping to get started this afternoon.  Planning 5 stages - BJ.  Need to get permits on site.
 
| Comp. Man - Max Lee,  Fracing, hoping to get started this afternoon.  Planning 5 stages - BJ.  Need to get permits on site.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1997192
 
| 1997192
| 2011-08-19
+
| Primary Facility
 +
| 08/19/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| fracing, on stage 1 of 5 - just finished as I got here.
 
| fracing, on stage 1 of 5 - just finished as I got here.
1530 - shut down job because of lightning( didn't start second stage )
 
Have permits.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2026320
 
| 2026320
| 2011-12-09
+
| Primary Facility
 +
| 12/09/2011
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well is in production - 1076 psi.
 
| Well is in production - 1076 psi.
36 annular vents - cellar is filled in.
 
Black Beauty Abrasive on ground - empty bags on site.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2029279
 
| 2029279
| 2011-12-15
+
| Primary Facility
 +
| 12/15/2011
 +
| Complaint Inspection
 
| Pending
 
| Pending
 
| On site with Eric Rooney to gather isotopic samples from annuli.  Chief O&G reps on site -Rich Adams, Ralph Larson, and Jon Hafer.  There are 3 annular vents, but cellar is filled in.  Cellar will be dug out to confirm which annulus the vents go to.
 
| On site with Eric Rooney to gather isotopic samples from annuli.  Chief O&G reps on site -Rich Adams, Ralph Larson, and Jon Hafer.  There are 3 annular vents, but cellar is filled in.  Cellar will be dug out to confirm which annulus the vents go to.
blue - 5 1/2" X 9 5/8"  - 169 psi , 100% comb. gas
 
A = ? 9 5/8 X 13 3/8" ?  68 psi, 100% comb. gas
 
B= ? 13 3/8 X 20" ?      35 psi, 100% comb. gas
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2029283
 
| 2029283
| 2011-12-19
+
| Primary Facility
 +
| 12/19/2011
 +
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| On site with Kevin Costello. Met Rich Adams and Jon Hafer, Chief reps.  Cellar has been dug up to determine which annuli the vents go to.
 
| On site with Kevin Costello. Met Rich Adams and Jon Hafer, Chief reps.  Cellar has been dug up to determine which annuli the vents go to.
blue    9 5/8" X 5 1/2"                      This is what we
 
A        13 3/8 X 9 5/8"                      thought before they
 
B        20 X 13 3/8"                          were dug up.
 
| 627760
 
| 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
|
 
|-
 
 
|-
 
|-
 
| 2029309
 
| 2029309
| 2011-12-22
+
| Primary Facility
 +
| 12/22/2011
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Onsite to take flow readings on csg annuli.  Met w/ Ralph Larsen and Jon Hafer / Cheif Reps.  Used the 1/4" plate on our oriface meter.
 
| Onsite to take flow readings on csg annuli.  Met w/ Ralph Larsen and Jon Hafer / Cheif Reps.  Used the 1/4" plate on our oriface meter.
    13 3/8" X 9 5/8" annulus - 0" of water = 0 cf/day of gas
 
      20 X 13 3/8" annulus - 0" of water = 0 cf/day of gas
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2029315
 
| 2029315
| 2011-12-15
+
| Primary Facility
 +
| 12/15/2011
 +
| Complaint Inspection
 
| Pending
 
| Pending
 
| On site w/ Eric Rooney to gather isotopic samples from annuli.  Also on site are Rich Adams, Ralph Larson, And Jon Hafer representing Chief Oil.  There are 3 annular vents, but cellar is filled in.  Will be dug out to confirm annuli.
 
| On site w/ Eric Rooney to gather isotopic samples from annuli.  Also on site are Rich Adams, Ralph Larson, And Jon Hafer representing Chief Oil.  There are 3 annular vents, but cellar is filled in.  Will be dug out to confirm annuli.
blue  5 1/2" X 9 5/8"  169 psi, 100% comb. gas
 
A    ? 9 5/8 X 13 3/8" ? 68 psi, 100% comb. gas
 
B    ? 132 3/8 X 20" ?  35 psi, 100% comb. gas
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2051382
 
| 2051382
| 2012-03-15
+
| Primary Facility
 +
| 03/15/2012
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Cellar dug out, small amount of water, no bubbles.
 
| Cellar dug out, small amount of water, no bubbles.
Need to put up orange fence( on ground) or barrier.
 
Prod.  - 1150psi
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2062407
 
| 2062407
| 2012-04-12
+
| Primary Facility
 +
| 04/12/2012
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Producing well.  Cellar is dug out, small amount of water present, no bubbles.
 
| Producing well.  Cellar is dug out, small amount of water present, no bubbles.
3 annular vents piped to tanks.
 
No change since last inspection.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2062431
 
| 2062431
| 2012-03-27
+
| Primary Facility
 +
| 03/27/2012
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Producing.  Cellar dug out, some water, no bubbles, 3 vents from csg annuli.
 
| Producing.  Cellar dug out, some water, no bubbles, 3 vents from csg annuli.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2064974
 
| 2064974
| 2012-04-27
+
| Primary Facility
 +
| 04/27/2012
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Pressure recording devices have been installed on each of 3 annulus vents.  Vents are shut in:  1150psi  prod
 
| Pressure recording devices have been installed on each of 3 annulus vents.  Vents are shut in:  1150psi  prod
          8 psi  20 X 13 3/8" annulus
 
          18 psi  13 3/8 X 9 5/8"
 
        100 psi  9 5/8" X 5 1/2"  blue
 
Otherwise no change.  Cellar dug out - no water.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2067568
 
| 2067568
| 2012-05-14
+
| Primary Facility
 +
| 05/14/2012
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Producing well.  3 annular vents - shut in with pressure and temp. recording device installed and press guages.  Pressures are:  5 1/2" X 9 5/8"  = 60 psi
 
| Producing well.  3 annular vents - shut in with pressure and temp. recording device installed and press guages.  Pressures are:  5 1/2" X 9 5/8"  = 60 psi
                                                                  9 5/8 x 13 3/8" = 15.5 psi
 
                                                                13 3/8 x 20"      =  2 psi
 
Celar is dug out w/ small amount of water.
 
1125 psi on prod.
 
Drop in pressures on annular vents since last inspection.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2078711
 
| 2078711
| 2012-06-18
+
| Primary Facility
 +
| 06/18/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Concrete barriers have been placed around well heads.  The cellar is dug out w/ water - no bubbles.
 
| Concrete barriers have been placed around well heads.  The cellar is dug out w/ water - no bubbles.
There are 3 annular vents - all open.
 
Well is producing - 1093 psi on prod.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2084516
 
| 2084516
| 2012-07-18
+
| Primary Facility
 +
| 07/18/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Cellars are dug out.  No water to 1/2" present.  No changes since last inspection on 7/9/2012.
 
| Cellars are dug out.  No water to 1/2" present.  No changes since last inspection on 7/9/2012.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2086703
 
| 2086703
| 2012-07-24
+
| Primary Facility
 +
| 07/24/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
| No change since last insp.  Some water in cellar - no bubbles.  3 annular vents - all open, vented.  
+
| No change since last insp.  Some water in cellar - no bubbles.  3 annular vents - all open, vented.
Prod has 1150 psi.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2087775
 
| 2087775
| 2012-07-30
+
| Primary Facility
 +
| 07/30/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Producing well.  Has 3 annular vents, open.  Clean water in cellar, no bubbles.
 
| Producing well.  Has 3 annular vents, open.  Clean water in cellar, no bubbles.
1205 psi on prod.  No change since last insp.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2097253
 
| 2097253
| 2012-08-30
+
| Primary Facility
 +
| 08/30/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| On site w/ Kevin Costello(DEP), Ralph Larsen (Chief) & Jon Hafer(Chief consult.) to witness flow tests and pressure tests on annuli.  Shut in all 3 annuli(20 x 13 3/8",  13 3/8 x 9 5/8", and 9 5/8 x 5 1/2") for 20 min.  All pressures are 0 psi.  Did not install orifice meter,  flow is zero.
 
| On site w/ Kevin Costello(DEP), Ralph Larsen (Chief) & Jon Hafer(Chief consult.) to witness flow tests and pressure tests on annuli.  Shut in all 3 annuli(20 x 13 3/8",  13 3/8 x 9 5/8", and 9 5/8 x 5 1/2") for 20 min.  All pressures are 0 psi.  Did not install orifice meter,  flow is zero.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2102755
 
| 2102755
| 2012-09-14
+
| Primary Facility
 +
| 09/14/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Cellar is dug out.  Very small amount of water - no bubbles, 3 annular vents.  Pressure guage on 9 5/8 x 5 1/2" annulus but all annuli are open, venting to tank.  Producing well.
 
| Cellar is dug out.  Very small amount of water - no bubbles, 3 annular vents.  Pressure guage on 9 5/8 x 5 1/2" annulus but all annuli are open, venting to tank.  Producing well.
1201 psi on production.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2133525
 
| 2133525
| 2013-01-15
+
| Primary Facility
 +
| 01/15/2013
 +
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Company Man is Max Lee. IPS (was Warrior) coil tbg unit on site.  Moved in yesterdeay.  Had a problem with a valve when rigging up, held them up.  Encountered an obstruction at 15'.  Will try to push, or drill out if need, clean out hole before setting CIBP @ 7200'.  Plastic containment is down, good.  Will prob. finish cleaning out hole and setting plug and filling on Thurs.
 
| Company Man is Max Lee. IPS (was Warrior) coil tbg unit on site.  Moved in yesterdeay.  Had a problem with a valve when rigging up, held them up.  Encountered an obstruction at 15'.  Will try to push, or drill out if need, clean out hole before setting CIBP @ 7200'.  Plastic containment is down, good.  Will prob. finish cleaning out hole and setting plug and filling on Thurs.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2137296
 
| 2137296
| 2013-01-25
+
| Primary Facility
 +
| 01/25/2013
 +
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| CDK Wireline is rigging down and moving out.  On the 23 rd, log was run w/ the 4H open, producing.  Noise increased as logged up the hole.  Shut in the 4H and ran noise again from about 4200' to surf w/ same results.  Gary from GWB consulting (not on site) suspended logs.  The annuli on 1H were shut in prior to logging, he wants them shut in for about 1 month so everything equalizes.  Need to call Rich Adams Monday.
 
| CDK Wireline is rigging down and moving out.  On the 23 rd, log was run w/ the 4H open, producing.  Noise increased as logged up the hole.  Shut in the 4H and ran noise again from about 4200' to surf w/ same results.  Gary from GWB consulting (not on site) suspended logs.  The annuli on 1H were shut in prior to logging, he wants them shut in for about 1 month so everything equalizes.  Need to call Rich Adams Monday.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2137302
 
| 2137302
| 2013-01-23
+
| Primary Facility
 +
| 01/23/2013
 +
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Here for noise and temp logging.  CDK logging.  5 1/2" has 0 psi and is full of fluid.
 
| Here for noise and temp logging.  CDK logging.  5 1/2" has 0 psi and is full of fluid.
Running temp log, almost to bottom.  Will run noide coming back up hole.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2141567
 
| 2141567
| 2013-01-18
+
| Primary Facility
 +
| 01/18/2013
 +
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Coil tbg rig has moved off site.  No comp man present.
 
| Coil tbg rig has moved off site.  No comp man present.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143342
 
| 2143342
| 2013-02-25
+
| Primary Facility
 +
| 02/25/2013
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Pressure guages and recorders on 5 1/2 and 9 5/8"  annuli.
 
| Pressure guages and recorders on 5 1/2 and 9 5/8"  annuli.
All 3  annular  vents closed.
 
5 1/2 x9 5/8" annulus has 13 psi.
 
9 5/8 x 13 3/8" annulus has 10 psi.
 
Plastic is still on site from logging.  Also 5 frac tanks.
 
Annular vents shut on the other wells on site.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2147002
 
| 2147002
| 2013-03-11
+
| Primary Facility
 +
| 03/11/2013
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| 3 vents are all shut in.
 
| 3 vents are all shut in.
Pressure guages and recorders on 5 1/2 x 9 5/8" and 9 5/8 x 13 3/8" annuli
 
  5 1/2 x 9 5/8"  =  22 psi
 
  9 5/8 x 13 3/8"  = 9 psi
 
Some water and ice in cellar.
 
3 other wells on site and all their annuli vents are closed.
 
The 1(V) and 4H are producing and both have 882 psi on production (?)
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2151160
 
| 2151160
| 2013-03-21
+
| Primary Facility
 +
| 03/21/2013
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Conditions on pad same as last inspection.
 
| Conditions on pad same as last inspection.
5 1/2 X 9 5/8" press. is 29 psi and  9 5/8 x 13 3/8" is 10 psi.
 
Talked to Jon Hafer of Chief.  hE IS GOING TO DOWNLOAD DATA FROM RECORDERS, AND WILL SEND THE INFO TO ME AS GUAGES AREN'T THAT ACCURATE.  cHIEF IS WAITING FOR ANNULAR PRESSURE TO STABILIZE BEFORE PROCEDING WITH ANY LOGGING, BUT WILL RE-EVALUATE HOW LONG TO WAIT.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2155760
 
| 2155760
| 2013-04-08
+
| Primary Facility
 +
| 04/08/2013
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Water in cellar.  3 annuli are still shut w/ pressure recorders & guages on 5 1/2 x 9 5/8" and 9 5/8 x 13 3/8".
 
| Water in cellar.  3 annuli are still shut w/ pressure recorders & guages on 5 1/2 x 9 5/8" and 9 5/8 x 13 3/8".
Pressure on 5 1/2 x 9 5/8" = 32 psi  and  9 5/8 x 13 3/8" = 9 1/2 psi.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2156005
 
| 2156005
| 2013-04-08
+
| Primary Facility
 +
| 04/08/2013
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| 3 annuli are still shut in w/ pressure recorders and guages.  5X 9 = 32 psi and 9 x 13 = 9.5 psi
 
| 3 annuli are still shut in w/ pressure recorders and guages.  5X 9 = 32 psi and 9 x 13 = 9.5 psi
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2160652
 
| 2160652
| 2013-04-16
+
| Primary Facility
 +
| 04/16/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| rigging to log
 
| rigging to log
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2161808
 
| 2161808
| 2013-04-22
+
| Primary Facility
 +
| 04/22/2013
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Annular vents are all open.  Other wells on pad also have vents open.
 
| Annular vents are all open.  Other wells on pad also have vents open.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2175531
 
| 2175531
| 2013-06-11
+
| Primary Facility
 +
| 06/11/2013
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Prod well.  814 psi    3 annular vents  - open.
 
| Prod well.  814 psi    3 annular vents  - open.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2199477
 
| 2199477
| 2013-08-14
+
| Primary Facility
 +
| 08/14/2013
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Producing well.
 
| Producing well.
Cellar is full of water - no bubbles.\3 annular vents - open and vented to tanks
 
772 psi on prod.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2213501
 
| 2213501
| 2013-10-01
+
| Primary Facility
 +
| 10/01/2013
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| On sitew w/ Eric Rooney, DEP and Jon Hafer, Chief, to collect isotopic samples from various annuli.  Shut in for 17+ hours, since about 4:30PM yesterday.
 
| On sitew w/ Eric Rooney, DEP and Jon Hafer, Chief, to collect isotopic samples from various annuli.  Shut in for 17+ hours, since about 4:30PM yesterday.
13 x 20" annulus = 1 psi
 
  9 x 13"        = 1.4 psi
 
  5 x 9"          =  -0.3 psi
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2244214
 +
| Primary Facility
 +
| 02/07/2013
 +
| Routine/Complete Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| No activity.
 +
|-
 +
| 2262545
 +
| Primary Facility
 +
| 04/08/2014
 +
| Drilling/Alteration
 +
| Outstanding Violations - No Viols Req'd
 +
| Team rig 211, Comp Man - Chris Roberts, Floyd Roberts
 
|-
 
|-
| 2244214
+
| 2262564
| 2013-02-07
+
| Primary Facility
 +
| 04/11/2014
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| No activity.
 
| No activity.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2262576
 +
| Primary Facility
 +
| 04/09/2014
 +
| Drilling/Alteration
 +
| Outstanding Violations - No Viols Req'd
 +
| Comp Man - Floyd Roberts
 
|-
 
|-
 
| 2321162
 
| 2321162
| 2014-11-04
+
| Primary Facility
 +
| 11/04/2014
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Related to 12/19/2011 Inspection ID # 2029283.
 
| Related to 12/19/2011 Inspection ID # 2029283.
 +
|-
 +
| 2397825
 +
| Primary Facility
 +
| 08/10/2015
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 
|  
 
|  
|  
+
|-
|  
+
| 2415326
 +
| Primary Facility
 +
| 10/13/2015
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| At time of inspection, arrived on site at 12:30 p.m., met with company man Floyd Roberts, Team Services LLC rig was running 2" drill pipe. The 9 casing was perforated from 1020'-1030', they attempted to inject into the perforations but pressured up to 1000psi and held for fifteen minutes. They will run a balanced plug from 900'-1130' pull out of the hole and put 500psi on the 9 casing until tomorrow morning, then they will tag cement. Universal is on site to run the cement plug, they will run 80sks of Class A Type 1 cement at 15.4lbs.  I took a walk around the location, everything looked OK.
 +
|-
 +
| 2670034
 +
| Primary Facility
 +
| 2017-12-11
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| There was no activity occurring at the site at the time of the inspection. I was accompanied by Jon Sassi (EPS) and consulted with Ken Kennedy (OGI). There were no violations notes pertaining to this well. If you have any questions, please contact me.
 +
|-
 +
| 2701538
 +
| Primary Facility
 +
| 2018-02-22
 +
| Compliance Evaluation
 +
| In Compliance with Schedule
 +
| Arrived onsite at 15:15. Onsite to check on progress of re plumbing of all (4) wells annular vents to surface in preparation for long term venting phase as discussed and agreed to in the Depts. meeting with Chief O&G of 2/14/18. All (4) wells, the Polovitch 1H, 1V, 4H and 5H, have had their (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) annular vents plumbed to surface via 2" vents. Vents had been fitted with ball valves and Tees w/ needle valves to access vents for sampling and eventual PBUTs. The Dept. will be meeting Chief O&G Rep., Jon Hafer back at pad tomorrow morning at 09:30 to obtain gas samples off all annuli, where gas is present, for Isotopic analysis. Chief O&G has had all annular spaces and vents purged of fluid and were shut in earlier today in preparation for tomorrows sampling event. (See attached, "As Plugged" Well Bore Schematics for individual wells for plugging details as of 2/14/18). All previous, deteriorated pad liner and debris have been removed from location. Location was fou
 +
|-
 +
| 2701763
 +
| Primary Facility
 +
| 2018-02-23
 +
| Compliance Evaluation
 +
| In Compliance with Schedule
 +
| Arrived onsite at 09:00. Upon arrival met up with Chief O&G Rep., Jonathan Hafer and D.E.P. Geologist, Eric Rooney. Onsite to initiate the 1st long term, approx. 90 day, venting period as agreed to in meeting of 2/14/18 with Chief O&G. All (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) were re-plumbed to surface and shut-in yesterday in preparation for todays sampling. Mr. Hafer explained that he would be taking gas samples off all the wells annular vents to send off for analysis. Following Mr. Hafers collection of annuli samples, I performed gas screenings at all (4) wells annuli using a ALTAIR 5X gas meter calibrated on 2/5/18. Gas was detected at the following wells annuli:
 +
1H: (13 x 9) = 100% LEL, 100% CH4,
 +
4H: (13 x 9) = 100 % LEL, 30 % CH4,
 +
5H: (13 x 9) = 100 % LEL, 8 % CH4,
 +
Following sample collection and gas screenings, all (4) wells annuli were opened to vent to atmosphere. This long term venting period will extend for ~ 90 days. Operator will then be performing
 +
|-
 +
| 2775957
 +
| Primary Facility
 +
| 2018-08-31
 +
| Compliance Evaluation
 +
| In Compliance with Schedule
 +
| Arrived onsite at 11:00. Upon arrival met with Chief O&G Rep., Jonathan Hafer to conclude the 7 day PBUTs being performed on all (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB). This is the 2nd PBUT being performed after (2) full 90 day, long term venting periods. Pre-shut in test gas screenings were performed at all wells annular vents on 8/24/18 by Mr. Hafer using a Rae Systems Multi-Rae gas meter, calibrated that morning. The only annuli where gas was detected are listed below:
 +
1H: (13x9) = 3.1% CH4, 51% LEL
 +
1V: (9/WB) = 1.6% CH4, 36% LEL
 +
4H: (13x9) = 1.9% CH4, 70% LEL
 +
5H: (13x9) = 6.6% CH4, 100% LEL
 +
 
 +
Today, the ending 7 day PBUT results were:
 +
1H: (20x13)= 0.40 psi, (13x9)= 12.95 psi, (9/WB)= 0.44 psi.
 +
1V: (20x13)= -0.10 psi, (13x9)= -2.0 psi, (9/WB)= 0.45 psi.
 +
4H: (20x13)= 0.10 psi, (13x9)= 11.10 psi, (9/WB)= 0.70 psi.
 +
5H: (20x13)= 0.65 psi, (13x9)= 5.2 psi, (9/WB)= 0.75psi.
 +
- Mr. Hafer explained that he would be collecting samples off all the wells annular vents to sen
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 02:21, 18 July 2019

Well Details

Well ID: 37-131-20156
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Nicholson Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149079
Farm/Lease Name: POLOVITCH UNIT 1H
License Status: Plugged OG Well
Spud Date: 03/28/2011
Permit Date: 3/22/2011
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.640783
Longitude: -75.811003

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 101,239.00 63 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 399,032.47 366 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 343,569.00 230 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 116,171.00 202 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S01 Drill Cuttings (in Tons) 1,143.30 Tons LANDFILL 100955
2011-S01 Drill Cuttings (in Tons) 659.38 Tons LANDFILL 301626
2011-S01 Fracing Fluid Waste (in Barrels) 357.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011-S02 Drill Cuttings (in Tons) 1,272.61 Tons LANDFILL 301626
2011-S02 Fracing Fluid Waste (in Barrels) 3,130.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 1,722.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 656.30 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 639.40 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2013-S02 Produced Fluid (in Barrels) 455.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 429.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014-S01 Produced Fluid (in Barrels) 292.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 202.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 46.47 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Fracturing Fluid Waste (in Barrels) RWC 805 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2018-M06 Spent Lubricant Waste (in Barrels) RWC 809 12.81 Bbl LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1960667 Primary Facility 03/28/2011 Drilling/Alteration No Violations Noted big rig- probably Thurs, still laying plastic, etc,getting ready to spud, have permit on site
1965039 Primary Facility 04/11/2011 Drilling/Alteration No Violations Noted AT 1823' drilling to 1825' then set csg and cement- probably tonight, using Universal
1965671 Primary Facility 04/14/2011 Drilling/Alteration No Violations Noted UDI Rig 58
1968964 Primary Facility 04/28/2011 Routine/Complete Inspection No Violations Noted UDI 58
1969661 Primary Facility 05/02/2011 Drilling/Alteration No Violations Noted 5 1/2" csg set @ 10026' with 1180 sx cement report attached
1990412 Primary Facility 07/25/2011 Routine/Complete Inspection No Violations Noted All 3 annuli have a vent pipe running to a frac tank.
1996398 Primary Facility 08/17/2011 Drilling/Alteration No Violations Noted Comp. Man - Max Lee, Fracing, hoping to get started this afternoon. Planning 5 stages - BJ. Need to get permits on site.
1997192 Primary Facility 08/19/2011 Drilling/Alteration No Violations Noted fracing, on stage 1 of 5 - just finished as I got here.
2026320 Primary Facility 12/09/2011 Complaint Inspection No Violations Noted Well is in production - 1076 psi.
2029279 Primary Facility 12/15/2011 Complaint Inspection Pending On site with Eric Rooney to gather isotopic samples from annuli. Chief O&G reps on site -Rich Adams, Ralph Larson, and Jon Hafer. There are 3 annular vents, but cellar is filled in. Cellar will be dug out to confirm which annulus the vents go to.
2029283 Primary Facility 12/19/2011 Follow-up Inspection Violation(s) Noted On site with Kevin Costello. Met Rich Adams and Jon Hafer, Chief reps. Cellar has been dug up to determine which annuli the vents go to.
2029309 Primary Facility 12/22/2011 Follow-up Inspection Outstanding Violations - No Viols Req'd Onsite to take flow readings on csg annuli. Met w/ Ralph Larsen and Jon Hafer / Cheif Reps. Used the 1/4" plate on our oriface meter.
2029315 Primary Facility 12/15/2011 Complaint Inspection Pending On site w/ Eric Rooney to gather isotopic samples from annuli. Also on site are Rich Adams, Ralph Larson, And Jon Hafer representing Chief Oil. There are 3 annular vents, but cellar is filled in. Will be dug out to confirm annuli.
2051382 Primary Facility 03/15/2012 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Cellar dug out, small amount of water, no bubbles.
2062407 Primary Facility 04/12/2012 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well. Cellar is dug out, small amount of water present, no bubbles.
2062431 Primary Facility 03/27/2012 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing. Cellar dug out, some water, no bubbles, 3 vents from csg annuli.
2064974 Primary Facility 04/27/2012 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Pressure recording devices have been installed on each of 3 annulus vents. Vents are shut in: 1150psi prod
2067568 Primary Facility 05/14/2012 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well. 3 annular vents - shut in with pressure and temp. recording device installed and press guages. Pressures are: 5 1/2" X 9 5/8" = 60 psi
2078711 Primary Facility 06/18/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd Concrete barriers have been placed around well heads. The cellar is dug out w/ water - no bubbles.
2084516 Primary Facility 07/18/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd Cellars are dug out. No water to 1/2" present. No changes since last inspection on 7/9/2012.
2086703 Primary Facility 07/24/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd No change since last insp. Some water in cellar - no bubbles. 3 annular vents - all open, vented.
2087775 Primary Facility 07/30/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd Producing well. Has 3 annular vents, open. Clean water in cellar, no bubbles.
2097253 Primary Facility 08/30/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd On site w/ Kevin Costello(DEP), Ralph Larsen (Chief) & Jon Hafer(Chief consult.) to witness flow tests and pressure tests on annuli. Shut in all 3 annuli(20 x 13 3/8", 13 3/8 x 9 5/8", and 9 5/8 x 5 1/2") for 20 min. All pressures are 0 psi. Did not install orifice meter, flow is zero.
2102755 Primary Facility 09/14/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd Cellar is dug out. Very small amount of water - no bubbles, 3 annular vents. Pressure guage on 9 5/8 x 5 1/2" annulus but all annuli are open, venting to tank. Producing well.
2133525 Primary Facility 01/15/2013 Drilling/Alteration Outstanding Violations - No Viols Req'd Company Man is Max Lee. IPS (was Warrior) coil tbg unit on site. Moved in yesterdeay. Had a problem with a valve when rigging up, held them up. Encountered an obstruction at 15'. Will try to push, or drill out if need, clean out hole before setting CIBP @ 7200'. Plastic containment is down, good. Will prob. finish cleaning out hole and setting plug and filling on Thurs.
2137296 Primary Facility 01/25/2013 Drilling/Alteration Outstanding Violations - No Viols Req'd CDK Wireline is rigging down and moving out. On the 23 rd, log was run w/ the 4H open, producing. Noise increased as logged up the hole. Shut in the 4H and ran noise again from about 4200' to surf w/ same results. Gary from GWB consulting (not on site) suspended logs. The annuli on 1H were shut in prior to logging, he wants them shut in for about 1 month so everything equalizes. Need to call Rich Adams Monday.
2137302 Primary Facility 01/23/2013 Drilling/Alteration Outstanding Violations - No Viols Req'd Here for noise and temp logging. CDK logging. 5 1/2" has 0 psi and is full of fluid.
2141567 Primary Facility 01/18/2013 Drilling/Alteration Outstanding Violations - No Viols Req'd Coil tbg rig has moved off site. No comp man present.
2143342 Primary Facility 02/25/2013 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Pressure guages and recorders on 5 1/2 and 9 5/8" annuli.
2147002 Primary Facility 03/11/2013 Routine/Complete Inspection Outstanding Violations - No Viols Req'd 3 vents are all shut in.
2151160 Primary Facility 03/21/2013 Follow-up Inspection Outstanding Violations - No Viols Req'd Conditions on pad same as last inspection.
2155760 Primary Facility 04/08/2013 Follow-up Inspection Outstanding Violations - No Viols Req'd Water in cellar. 3 annuli are still shut w/ pressure recorders & guages on 5 1/2 x 9 5/8" and 9 5/8 x 13 3/8".
2156005 Primary Facility 04/08/2013 Follow-up Inspection Outstanding Violations - No Viols Req'd 3 annuli are still shut in w/ pressure recorders and guages. 5X 9 = 32 psi and 9 x 13 = 9.5 psi
2160652 Primary Facility 04/16/2013 Drilling/Alteration No Violations Noted rigging to log
2161808 Primary Facility 04/22/2013 Follow-up Inspection Outstanding Violations - No Viols Req'd Annular vents are all open. Other wells on pad also have vents open.
2175531 Primary Facility 06/11/2013 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Prod well. 814 psi 3 annular vents - open.
2199477 Primary Facility 08/14/2013 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well.
2213501 Primary Facility 10/01/2013 Follow-up Inspection Outstanding Violations - No Viols Req'd On sitew w/ Eric Rooney, DEP and Jon Hafer, Chief, to collect isotopic samples from various annuli. Shut in for 17+ hours, since about 4:30PM yesterday.
2244214 Primary Facility 02/07/2013 Routine/Complete Inspection Outstanding Violations - No Viols Req'd No activity.
2262545 Primary Facility 04/08/2014 Drilling/Alteration Outstanding Violations - No Viols Req'd Team rig 211, Comp Man - Chris Roberts, Floyd Roberts
2262564 Primary Facility 04/11/2014 Routine/Complete Inspection Outstanding Violations - No Viols Req'd No activity.
2262576 Primary Facility 04/09/2014 Drilling/Alteration Outstanding Violations - No Viols Req'd Comp Man - Floyd Roberts
2321162 Primary Facility 11/04/2014 Follow-up Inspection Outstanding Violations - No Viols Req'd Related to 12/19/2011 Inspection ID # 2029283.
2397825 Primary Facility 08/10/2015 Plugging(Includes Plugged/Mined Through) No Violations Noted
2415326 Primary Facility 10/13/2015 Plugging(Includes Plugged/Mined Through) No Violations Noted At time of inspection, arrived on site at 12:30 p.m., met with company man Floyd Roberts, Team Services LLC rig was running 2" drill pipe. The 9 casing was perforated from 1020'-1030', they attempted to inject into the perforations but pressured up to 1000psi and held for fifteen minutes. They will run a balanced plug from 900'-1130' pull out of the hole and put 500psi on the 9 casing until tomorrow morning, then they will tag cement. Universal is on site to run the cement plug, they will run 80sks of Class A Type 1 cement at 15.4lbs. I took a walk around the location, everything looked OK.
2670034 Primary Facility 2017-12-11 Follow-up Inspection No Violations Noted There was no activity occurring at the site at the time of the inspection. I was accompanied by Jon Sassi (EPS) and consulted with Ken Kennedy (OGI). There were no violations notes pertaining to this well. If you have any questions, please contact me.
2701538 Primary Facility 2018-02-22 Compliance Evaluation In Compliance with Schedule Arrived onsite at 15:15. Onsite to check on progress of re plumbing of all (4) wells annular vents to surface in preparation for long term venting phase as discussed and agreed to in the Depts. meeting with Chief O&G of 2/14/18. All (4) wells, the Polovitch 1H, 1V, 4H and 5H, have had their (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) annular vents plumbed to surface via 2" vents. Vents had been fitted with ball valves and Tees w/ needle valves to access vents for sampling and eventual PBUTs. The Dept. will be meeting Chief O&G Rep., Jon Hafer back at pad tomorrow morning at 09:30 to obtain gas samples off all annuli, where gas is present, for Isotopic analysis. Chief O&G has had all annular spaces and vents purged of fluid and were shut in earlier today in preparation for tomorrows sampling event. (See attached, "As Plugged" Well Bore Schematics for individual wells for plugging details as of 2/14/18). All previous, deteriorated pad liner and debris have been removed from location. Location was fou
2701763 Primary Facility 2018-02-23 Compliance Evaluation In Compliance with Schedule Arrived onsite at 09:00. Upon arrival met up with Chief O&G Rep., Jonathan Hafer and D.E.P. Geologist, Eric Rooney. Onsite to initiate the 1st long term, approx. 90 day, venting period as agreed to in meeting of 2/14/18 with Chief O&G. All (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) were re-plumbed to surface and shut-in yesterday in preparation for todays sampling. Mr. Hafer explained that he would be taking gas samples off all the wells annular vents to send off for analysis. Following Mr. Hafers collection of annuli samples, I performed gas screenings at all (4) wells annuli using a ALTAIR 5X gas meter calibrated on 2/5/18. Gas was detected at the following wells annuli:

1H: (13 x 9) = 100% LEL, 100% CH4, 4H: (13 x 9) = 100 % LEL, 30 % CH4, 5H: (13 x 9) = 100 % LEL, 8 % CH4, Following sample collection and gas screenings, all (4) wells annuli were opened to vent to atmosphere. This long term venting period will extend for ~ 90 days. Operator will then be performing

2775957 Primary Facility 2018-08-31 Compliance Evaluation In Compliance with Schedule Arrived onsite at 11:00. Upon arrival met with Chief O&G Rep., Jonathan Hafer to conclude the 7 day PBUTs being performed on all (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB). This is the 2nd PBUT being performed after (2) full 90 day, long term venting periods. Pre-shut in test gas screenings were performed at all wells annular vents on 8/24/18 by Mr. Hafer using a Rae Systems Multi-Rae gas meter, calibrated that morning. The only annuli where gas was detected are listed below:

1H: (13x9) = 3.1% CH4, 51% LEL 1V: (9/WB) = 1.6% CH4, 36% LEL 4H: (13x9) = 1.9% CH4, 70% LEL 5H: (13x9) = 6.6% CH4, 100% LEL

Today, the ending 7 day PBUT results were: 1H: (20x13)= 0.40 psi, (13x9)= 12.95 psi, (9/WB)= 0.44 psi. 1V: (20x13)= -0.10 psi, (13x9)= -2.0 psi, (9/WB)= 0.45 psi. 4H: (20x13)= 0.10 psi, (13x9)= 11.10 psi, (9/WB)= 0.70 psi. 5H: (20x13)= 0.65 psi, (13x9)= 5.2 psi, (9/WB)= 0.75psi. - Mr. Hafer explained that he would be collecting samples off all the wells annular vents to sen

For data sources see[6]

References