X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20193

Well Details

Well ID: 37-131-20193
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145304
Farm/Lease Name: YARASAVAGE 4H
First Permit Date: 2011-07-13
Last Permit Date: 2011-07-13
Spud Date: 2011-08-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 2
Latitude: 41.597747
Longitude: -75.985941

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 15227.0 5.0 0.0 0.0 0.0 0.0
2013-2 288310.0 123.0 0.0 0.0 0.0 0.0
2014-1 700803.0 142.0 0.0 0.0 0.0 0.0
2014-2 869827.0 167.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 5119.13 3.0 0.0 0.0 0.0 0.0
2015-03 6906.84 5.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 DRILL CUTTINGS 160.92 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2012-1 DRILL CUTTINGS 898.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2013-1 PRODUCED FLUID 6.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 PRODUCED FLUID 2.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003 SHASKAS SOUTH PAD MONTROSE PA
2014-1 PRODUCED FLUID 57.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003 SHASKAS SOUTH PAD MONTROSE PA
2014-2 PRODUCED FLUID 212.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA
2014-2 PRODUCED FLUID 6.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010 HYDRO RECOVERY LP ANTRIM FACILITY WELLSBORO PA
2014-2 PRODUCED FLUID 6.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2014-2 PRODUCED FLUID 194.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
15-Jan PRODUCED FLUID 0.77 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1994088 2011-08-08 Violation(s) Noted Pete Martin Drilling doing conductor - one hole a day, 3 are done, on the 4th of 6.

Have permits. No drillers logs, showed me the paperwork they have and said they would note on it the formations and water. Still working on site and E&S. No site ID sign. Talked to Tom Weller on 8/9/2011 - problems will be taken care of.

617180 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
1997642 2011-08-22 No Violations Noted Joe from JP Reilly, on site constructing cellars
2002325 2011-08-04 No Violations Noted
2036976 2012-01-25 No Violations Noted
2049616 2012-03-06 No Violations Noted NE Energy Rig 10, Comp. Man - Bruce Despelder, checked drillers log - at 5117'

28"? at 30' 8/8/2011 13 3/8" @ 805' W/ 770 sx 10/30/2011 9 5/8" @ 1662' w/ 580 sx 11/1/2011 Just got back to drilling, down for a generator problem. Started @ 1682', try to get to 700' before stopping. BOP test 2/29/2012 - good. Discussed need to correct permit number on site sign, and pump water out of containment in back corner - it has a sheen on it.

2067068 2012-05-07 No Violations Noted Nabors M 61, Comp. Man - John Savage, checked drillers log - @ 8218'

Tully top 6080' MD Hamilton 6230' U. Marcellus 7996' 45 - 65 units gas Started 5/3/12 @ 6240'. Top curve @ 7762', still on curve. BOP test 5/2/2012 Discussed need to keep patching plastic, empty drip pans, general housekeeping.

2155795 2013-04-08 No Violations Noted Rigged up wellheads to frac. Started 1st stage @ 7 PM, Sat., 4/6/2013. Very tight, worked till 23:30 PmM and shut down. Decision was made to use different wellhead. On Sun, 4/7/2013, set 2 BPs, @ 6000+' and 5000+'.
2248496 2013-05-10 Violation(s) Noted 689532 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days

For data sources see[3]

References