If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20193 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.597747,"lon":-75.985942,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: CARRIZO (MARCELLUS) LLC | |
Well Pad ID: 145304 | |
Farm/Lease Name: YARASAVAGE 4H | |
License Status: Active | |
Spud Date: 08/05/2011 | |
Permit Date: 7/13/2011 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.597747 | |
Longitude: -75.985942 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 303,537.00 | 128 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 1,570,717.19 | 309 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 174,628.86 | 52 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 467,127.56 | 103 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 924,415.07 | 261 | 0.00 | 0 | 0.00 | 0 |
2018 | CARRIZO (MARCELLUS) LLC | 795,602.16 | 359 | 0.00 | 0 | 0.00 | 0 |
2019 | CARRIZO (MARCELLUS) LLC | 135,849.63 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2011-S02 | Drill Cuttings (in Tons) | 160.92 Tons | LANDFILL | THR029 |
2012-S01 | Drill Cuttings (in Tons) | 898.00 Tons | LANDFILL | THR029 |
2013-S01 | Produced Fluid (in Barrels) | 6,421.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 2,893.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014-S01 | Produced Fluid (in Barrels) | 57.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014-S02 | Produced Fluid (in Barrels) | 212.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014-S02 | Produced Fluid (in Barrels) | 6,025.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014-S02 | Produced Fluid (in Barrels) | 6,025.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014-S02 | Produced Fluid (in Barrels) | 194.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M01 | Produced Fluid (in Barrels) | 1.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015-M03 | Produced Fluid (in Barrels) | 0.48 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015-M03 | Produced Fluid (in Barrels) | 2.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M05 | Basic Sediment (in Barrels) | 50.00 Bbl | LANDFILL | THR029 |
2015-M11 | Produced Fluid (in Barrels) | 11.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015-M12 | Produced Fluid (in Barrels) | 21.53 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016-M06 | Produced Fluid (in Barrels) RWC 802 | 13.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016-M07 | Produced Fluid (in Barrels) RWC 802 | 32.55 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016-M08 | Produced Fluid (in Barrels) RWC 802 | 15.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016-M11 | Produced Fluid (in Barrels) RWC 802 | 34.87 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016-M11 | Produced Fluid (in Barrels) RWC 802 | 17.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016-M12 | Produced Fluid (in Barrels) RWC 802 | 17.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 89.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 34.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 33.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 34.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 49.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 20.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 20.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 48.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 12.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 48.94 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 46.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 15.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 17.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1994088 | Primary Facility | 08/08/2011 | Drilling/Alteration | Violation(s) Noted | Pete Martin Drilling doing conductor - one hole a day, 3 are done, on the 4th of 6. |
1997642 | Primary Facility | 08/22/2011 | Drilling/Alteration | No Violations Noted | Joe from JP Reilly, on site constructing cellars |
2002325 | Primary Facility | 08/04/2011 | Routine/Complete Inspection | No Violations Noted | |
2036976 | Primary Facility | 01/25/2012 | Routine/Complete Inspection | No Violations Noted | |
2049616 | Primary Facility | 03/06/2012 | Drilling/Alteration | No Violations Noted | NE Energy Rig 10, Comp. Man - Bruce Despelder, checked drillers log - at 5117' |
2067068 | Primary Facility | 05/07/2012 | Drilling/Alteration | No Violations Noted | Nabors M 61, Comp. Man - John Savage, checked drillers log - @ 8218' |
2155795 | Primary Facility | 04/08/2013 | Follow-up Inspection | No Violations Noted | Rigged up wellheads to frac. Started 1st stage @ 7 PM, Sat., 4/6/2013. Very tight, worked till 23:30 PmM and shut down. Decision was made to use different wellhead. On Sun, 4/7/2013, set 2 BPs, @ 6000+' and 5000+'. |
2248496 | Primary Facility | 05/10/2013 | Follow-up Inspection | Violation(s) Noted | |
2382843 | Primary Facility | 06/24/2015 | Routine/Partial Inspection | No Violations Noted | |
2490763 | Primary Facility | 2016-06-01 | Routine/Complete Inspection | No Violations Noted | |
2545124 | Primary Facility | 2016-12-15 | Site Restoration | No Violations Noted | |
2545125 | Primary Facility | 2016-12-15 | Site Restoration | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2248496 | 689532 | 05/10/2013 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative |
For data sources see[6]