X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20219"

m
m
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20219
 
| Well ID: 37-131-20219
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.597786, -75.985941 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.597786, -75.985942 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Wyoming County, Pennsylvania|Wyoming]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Wyoming_County,_Pennsylvania|Wyoming]]
 +
|-
 +
| Municipality: [[Washington Township,_Wyoming_County,_Pennsylvania|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
|-
 
|-
| Well Pad ID: [[145304|145304]]
+
| Well Pad ID: [[145304]]
 
|-
 
|-
 
| Farm/Lease Name: YARASAVAGE SOLANICK 3H
 
| Farm/Lease Name: YARASAVAGE SOLANICK 3H
 
|-
 
|-
| First Permit Date: 2011-10-05
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2011-10-05
+
| Spud Date: 2011-10-13
 
|-
 
|-
| Spud Date: 2011-10-13
+
| Permit Date: 2011-10-05
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Well Status: ACTIVE
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 3
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.597786
 
| Latitude: 41.597786
 
|-
 
|-
| Longitude: -75.985941
+
| Longitude: -75.985942
|-
 
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2011-2
+
| 2011-10-05
| style="text-align:right;" | 0.0
+
| New Permit Application
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-10-13
 +
| Performed Spud Operation
 
|-
 
|-
| 2012-1
+
| 2012-01-08
| style="text-align:right;" | 0.0
+
| Drilling Completion
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012-08-15
 +
| DEVIATED
 
|-
 
|-
| 2012-2
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
| style="text-align:right;" | 0.0
+
| date = 2020-02-27
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2020-02-27 }}</ref>
| style="text-align:right;" | 0.0
+
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2013-1
+
|}-->
| style="text-align:right;" | 19632.0
+
 
| style="text-align:right;" | 5.0
+
<!--== Stimulation Data ==
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Stimulation Date
| style="text-align:right;" | 0.0
+
!scope="col" | Phase Number
| style="text-align:right;" | 0.0
+
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2013-2
+
| 2011
| style="text-align:right;" | 350438.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 109.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
| 2013
| style="text-align:right;" | 804261.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 162.0
+
| style="text-align: right;" | 370,070.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 114
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 1,748,508.20
 +
| style="text-align: right;" | 341
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| 2015
| style="text-align:right;" | 952096.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 179.0
+
| style="text-align: right;" | 1,124,258.20
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 261
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 492,698.07
 +
| style="text-align: right;" | 94
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
| 2017
| style="text-align:right;" | 136514.68
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 1,099,498.64
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 290
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 798,080.19
 +
| style="text-align: right;" | 356
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
| 2019
| style="text-align:right;" | 147405.98
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 479,293.67
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 358
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2015-03
 
| style="text-align:right;" | 111474.82
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
| 2011
| DRILL CUTTINGS
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 607.08
+
| Drill Cuttings
| Tons
+
| style="text-align: right;" | 607.08 Tons
 
| LANDFILL
 
| LANDFILL
 
| THR029
 
| THR029
| TUNNELL HILL RECLAMATION LANDFILL
 
| NEWLEXINGTON
 
| OH
 
|-
 
 
|-
 
|-
| 2012-1
+
| 2012
| DRILL CUTTINGS
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 842.0
+
| Drill Cuttings
| Tons
+
| style="text-align: right;" | 842.00 Tons
 
| LANDFILL
 
| LANDFILL
 
| THR029
 
| THR029
| TUNNELL HILL RECLAMATION LANDFILL
 
| NEWLEXINGTON
 
| OH
 
 
|-
 
|-
 +
| 2013
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5,110.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
| 2013-1
+
| 2013
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 5.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 5,402.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
|  
+
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 57.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 +
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 212.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 +
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,025.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 +
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,025.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 194.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2015
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 17.84 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 
|-
 
|-
| 2013-2
+
| 2015
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 5.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 105.16 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE003
 
| WMGR123NE003
| SHASKAS SOUTH PAD
 
| MONTROSE
 
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Basic Sediment
 +
| style="text-align: right;" | 50.00 Bbl
 +
| LANDFILL
 +
| THR029
 
|-
 
|-
| 2014-1
+
| 2015
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 57.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 131.05 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NE003
+
| WMGR123
| SHASKAS SOUTH PAD
 
| MONTROSE
 
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 273.67 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2015
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 212.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 26.18 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123NC010
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
+
|-
| WILLIAMSPORT
+
| 2016
| PA
+
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 9.29 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 +
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 14.58 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6.87 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 
|-
 
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 53.57 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
| 2014-2
+
| 2016
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 6.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 42.31 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
| HYDRO RECOVERY LP ANTRIM FACILITY
 
| WELLSBORO
 
| PA
 
 
|-
 
|-
|-
+
| 2016
| 2014-2
+
| [[CARRIZO (MARCELLUS) LLC]]
| PRODUCED FLUID
+
| Other Oil & Gas Wastes
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 9.29 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR0123
+
| WMGR123NE003
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
 
|-
 
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.11 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 
|-
 
|-
| 2014-2
+
| 2017
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 194.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 92.74 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE PROCESSING FACILITY
|
+
| WMGR123NC010
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|  
 
|
 
 
|-
 
|-
 +
| 2017
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 163.71 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 15FEBU
+
| 2017
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 28.42
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 51.17 Bbl
| STORAGE PENDING DISPOSAL OR REUSE
+
| REUSE (AT WELL PAD)
|
 
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2017
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.08 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 
|-
 
|-
| 15-Jan
+
| 2018
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 43.12
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 17.14 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR0123
+
| WMGR123NE003
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
 
|-
 
|-
 +
| 2018
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 256.46 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 15FEBU
+
| 2018
| PRODUCED FLUID
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 28.42
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 30.00 Bbl
| STORAGE PENDING DISPOSAL OR REUSE
+
| REUSE (AT WELL PAD)
 
|  
 
|  
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
+
|-
|  
+
| 2019
| PA
+
| [[CARRIZO (MARCELLUS) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 328.58 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
|-
 
| 2019246
 
| 2011-11-14
 
| Violation(s) Noted
 
| Northeast Energy rig 10,    Comp Man - James Letsinger
 
Discussed need to put well tags on before you move off site, get drillers log book and fill out, clean up mud and oil on containment and patch holes, and pump down tank.
 
No drillers log.
 
Doesn't have 2' freeboard.
 
| 624726
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
|
 
|-
 
 
|-
 
|-
 
| 2019246
 
| 2019246
 +
| Primary Facility
 
| 2011-11-14
 
| 2011-11-14
 +
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| Northeast Energy rig 10,    Comp Man - James Letsinger
 
| Northeast Energy rig 10,    Comp Man - James Letsinger
Discussed need to put well tags on before you move off site, get drillers log book and fill out, clean up mud and oil on containment and patch holes, and pump down tank.
 
No drillers log.
 
Doesn't have 2' freeboard.
 
| 624727
 
| 78.122 - Drillers Log not on site
 
|
 
|-
 
 
|-
 
|-
 
| 2021718
 
| 2021718
 +
| Primary Facility
 
| 2011-11-21
 
| 2011-11-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Need permit # on sign.
 
| Need permit # on sign.
Tophole rig has moved out, H&P 320 is moving in.
 
Freeboard VIO & Drillers Log VIO have been corrected.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2027370
 
| 2027370
 +
| Primary Facility
 
| 2011-12-09
 
| 2011-12-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| H&P Flex 320  Comp. Man - Tim Peay
 
| H&P Flex 320  Comp. Man - Tim Peay
Just getting started drilling.  Skidded from Yarasavage 7H.  Lots of holes in plastic containment - need to fix.  Notify me when you are skidding & running csg, cementing.  Check that BOP is > 50'.
 
Pick-up garbage around site.
 
Check that well is on site sign.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2031998
 
| 2031998
 +
| Primary Facility
 
| 2011-12-20
 
| 2011-12-20
 +
| Drilling/Alteration
 
| Pending
 
| Pending
 
| H & :P Flex 320  Comp. Man - Tim Peay    checked drillers log, at 4771'
 
| H & :P Flex 320  Comp. Man - Tim Peay    checked drillers log, at 4771'
switching to OBM
 
BOP test - 12/12/11 good
 
cellar checked - no bubbles
 
Small area of diesel off containment, by diesel tank, about 2' x 2'.  Clean up  and add this well to site sign.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2154550
 
| 2154550
 +
| Primary Facility
 
| 2013-04-04
 
| 2013-04-04
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2155761
 
| 2155761
 +
| Primary Facility
 
| 2013-04-09
 
| 2013-04-09
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On site to gather information on new wellheads.  Took photos of installed wellhead & got a diagram (schematic) of wellhead - GE Oil & Gas 9 5/8 x 5 1/2 W2BP CSGHD with MTH-2-EBS-F TBG HEAD
 
| On site to gather information on new wellheads.  Took photos of installed wellhead & got a diagram (schematic) of wellhead - GE Oil & Gas 9 5/8 x 5 1/2 W2BP CSGHD with MTH-2-EBS-F TBG HEAD
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2155775
 
| 2155775
 +
| Primary Facility
 
| 2013-04-08
 
| 2013-04-08
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Rigged up wellhead on Sat in prep for fracing.  Did first stage on Sat. Set solid plug  Decided to change wellhead so set 2 more plugs, around 5000+ and 6000+ feet.
 
| Rigged up wellhead on Sat in prep for fracing.  Did first stage on Sat. Set solid plug  Decided to change wellhead so set 2 more plugs, around 5000+ and 6000+ feet.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2155806
 
| 2155806
 +
| Primary Facility
 
| 2013-04-11
 
| 2013-04-11
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Colby Weinstock, Carrizo mRep on site.
 
| Colby Weinstock, Carrizo mRep on site.
Working on new wellhead installation.
+
|-
GE on site, Cactus wellhead, and Seaboard also.Probably start up fracing on Sat, 4//.
+
| 2248502
Unsure if they will use resin on bolts.
+
| Primary Facility
Going to keep with wellhead inspection as laid out earlier, in response to NOV on 1H.
+
| 2013-05-10
 
+
| Follow-up Inspection
 
+
| Violation(s) Noted
 
 
 
|  
 
|  
 +
|-
 +
| 2382844
 +
| Primary Facility
 +
| 2015-06-24
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2490762
 +
| Primary Facility
 +
| 2016-06-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 2019246
 +
| 624726
 +
| 11/14/2011
 +
| 2011-11-14
 +
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 +
| Administrative
 +
|
 +
|-
 +
| 2019246
 +
| 624727
 +
| 11/14/2011
 +
| 2011-11-14
 +
| 78.122 - Drillers Log not on site
 +
| Administrative
 +
|
 
|-
 
|-
 
| 2248502
 
| 2248502
 +
| 689533
 +
| 05/10/2013
 
| 2013-05-10
 
| 2013-05-10
| Violation(s) Noted
+
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
|
+
| Administrative
| 689533
 
| 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 17:33, 2 June 2020

Well Details

Well ID: 37-131-20219
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145304
Farm/Lease Name: YARASAVAGE SOLANICK 3H
License Status:
Spud Date: 2011-10-13
Permit Date: 2011-10-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.597786
Longitude: -75.985942

For data sources see[1][2][3]

Well History

Date Event
2011-10-05 New Permit Application
2011-10-13 Performed Spud Operation
2012-01-08 Drilling Completion
2012-08-15 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 370,070.00 114 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 1,748,508.20 341 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 1,124,258.20 261 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 492,698.07 94 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 1,099,498.64 290 0.00 0 0.00 0
2018 CARRIZO (MARCELLUS) LLC 798,080.19 356 0.00 0 0.00 0
2019 CARRIZO (MARCELLUS) LLC 479,293.67 358 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CARRIZO (MARCELLUS) LLC Drill Cuttings 607.08 Tons LANDFILL THR029
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 842.00 Tons LANDFILL THR029
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 5,110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 5,402.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 57.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 212.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 6,025.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 6,025.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 194.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 17.84 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 105.16 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Basic Sediment 50.00 Bbl LANDFILL THR029
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 131.05 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 273.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 26.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 9.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 14.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 6.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 53.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 42.31 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 9.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 20.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 92.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 163.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 51.17 Bbl REUSE (AT WELL PAD)
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 100.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 17.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 256.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 30.00 Bbl REUSE (AT WELL PAD)
2019 CARRIZO (MARCELLUS) LLC Produced Fluid 328.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2019246 Primary Facility 2011-11-14 Drilling/Alteration Violation(s) Noted Northeast Energy rig 10, Comp Man - James Letsinger
2021718 Primary Facility 2011-11-21 Drilling/Alteration No Violations Noted Need permit # on sign.
2027370 Primary Facility 2011-12-09 Drilling/Alteration No Violations Noted H&P Flex 320 Comp. Man - Tim Peay
2031998 Primary Facility 2011-12-20 Drilling/Alteration Pending H & :P Flex 320 Comp. Man - Tim Peay checked drillers log, at 4771'
2154550 Primary Facility 2013-04-04 Follow-up Inspection No Violations Noted
2155761 Primary Facility 2013-04-09 Follow-up Inspection No Violations Noted On site to gather information on new wellheads. Took photos of installed wellhead & got a diagram (schematic) of wellhead - GE Oil & Gas 9 5/8 x 5 1/2 W2BP CSGHD with MTH-2-EBS-F TBG HEAD
2155775 Primary Facility 2013-04-08 Follow-up Inspection No Violations Noted Rigged up wellhead on Sat in prep for fracing. Did first stage on Sat. Set solid plug Decided to change wellhead so set 2 more plugs, around 5000+ and 6000+ feet.
2155806 Primary Facility 2013-04-11 Follow-up Inspection No Violations Noted Colby Weinstock, Carrizo mRep on site.
2248502 Primary Facility 2013-05-10 Follow-up Inspection Violation(s) Noted
2382844 Primary Facility 2015-06-24 Routine/Partial Inspection No Violations Noted
2490762 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2019246 624726 11/14/2011 2011-11-14 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
2019246 624727 11/14/2011 2011-11-14 78.122 - Drillers Log not on site Administrative
2248502 689533 05/10/2013 2013-05-10 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

For data sources see[7]

References