X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0676090210000

Well Details

Well ID: 0676090210000
Loading map...
Location: 00/10-02-067-09W6/0
Location Alias: 00/10-02-67-09 W6M
Location Alias 2: 00/10-02-067-09 W6/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 6
Range: 09
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL WAPITI 10-2-67-9
Operator Name: Canadian Natural Resources Limited
License Number: 0090890
License Date: 1981-06-23
License Status: Issued
Spud Date: 1981-07-02
Final Drill Date: 1981-09-01
Well Total Depth: 2933.00 m
Surface Hole Latitude: 54.774201
Surface Hole Longitude: -119.25541

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-23 Obtained License
1981-07-24 Kick Occurred
1981-07-26 Drill Stem Test Performed
1981-08-19 Drill Stem Test Performed
1981-09-01 Finished Drilling
1981-09-05 Production Casing Operation Performed
1981-09-07 Well Mode changed to Drilled and Cased
1982-01-30 Perforation Treatment Performed - Jet Perforation
1982-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-04 Perforation Treatment Performed - Jet Perforation
1982-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-06 Perforation Treatment Performed - Fractured
1982-02-12 Perforation Treatment Performed - Fractured
1990-07-18 Well Began Production
1990-07-18 Well Fluid changed to Gas
1990-07-18 Well Mode changed to Flowing
1997-10-22 Perforation Treatment Performed - Jet Perforation
1997-10-22 Well Log Performed
1997-10-23 Perforation Treatment Performed - Fractured
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-30 Perforation 2711.00 2717.00 12
1982-01-31 Acid Treatment 2711.00 2717.00 0
1982-02-02 Packing Device Capped w/Cement 2700.00 2700.00 0
1982-02-04 Perforation 2285.50 2294.00 6
1982-02-04 Perforation 2309.00 2313.50 6
1982-02-05 Acid Treatment 2285.50 2313.50 0
1982-02-06 Fracture 2285.50 2313.50 0
1982-02-12 Fracture 2285.50 2313.50 0
1997-10-22 Perforation 2214.00 2223.00 13
1997-10-23 Fracture 2214.00 2223.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 108 0.0 0.0 0.0
1990 2411 0.0 0.0 0.0
1991 4802 0.0 0.0 0.0
1992 4056 0.0 0.0 0.0
1993 1416 0.0 0.0 0.0
1994 2660 0.0 0.0 0.0
1995 2804 0.0 0.0 0.0
1996 398 0.0 0.0 0.0
1997 3063 0.0 0.0 0.0
1998 822 0.0 0.0 0.0
1999 919 0.0 0.0 0.0
2000 1405 0.0 0.0 0.0
2001 468 0.0 0.0 0.0
2002 2966 0.0 0.0 0.0
2003 5299 0.0 0.0 0.0
2004 8567 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8615 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 7823 0.0 0.0 0.0
2009 7871 0.0 0.0 0.0
2010 8423 0.0 0.0 0.0
2011 6672 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8279 0.0 0.0 0.0
2014 7799 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7319 0.0 0.0 0.0
2017 7343 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-07-24 Kick 2290.00 2300.00

For data sources see[6]

References