X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0044080607000

Well Details

Well ID: 0044080607000
Loading map...
Location: 00/07-06-004-08W4/0
Location Alias: 00/07-06-04-08 W4M
Location Alias 2: 00/07-06-004-08 W4/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 4
Range: 08
Section: 06
County/Municipality: County of Forty Mile No. 8
Well Name: MCCOLL-FRONTENAC-UNION 7C-6-4-8
Operator Name: Imperial Oil Resources Limited
License Number: B0001473
License Date: 1946-09-09
License Status: RecExempt
Spud Date: 1946-09-12
Final Drill Date: 1946-09-22
Well Total Depth: 674.00 m
Surface Hole Latitude: 49.267449
Surface Hole Longitude: -111.069534

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1946-09-09 Obtained License
1946-09-18 Drill Stem Test Performed
1946-09-19 Drill Stem Test Performed
1946-09-20 Drill Stem Test Performed
1946-09-21 Drill Stem Test Performed
1946-09-22 Drill Stem Test Performed
1946-09-22 Finished Drilling
1946-09-23 Production Casing Operation Performed
1946-10-05 Perforation Treatment Performed - Bullet Perforation
1946-10-10 Perforation Treatment Performed - Bullet Perforation
1946-10-13 Perforation Treatment Performed - Bullet Perforation
1947-10-20 Well Mode changed to Drilled and Cased
1952-02-08 Well Began Production
1952-02-08 Well Fluid changed to Gas
1952-02-08 Well Mode changed to Flowing
1959-10-09 Perforation Treatment Performed - Bullet Perforation
1960-06-07 Perforation Treatment Performed - Cement Plug
1960-06-07 Well Fluid changed to Gas
1960-06-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1946-10-05 Bullet Perforation 616.60 616.90 7
1946-10-10 Bullet Perforation 617.20 617.50 7
1946-10-10 Bullet Perforation 616.60 616.90 10
1946-10-13 Bullet Perforation 617.50 618.10 13
1946-10-13 Bullet Perforation 618.10 618.40 13
1959-10-09 Bullet Perforation 617.80 618.70 13
1960-06-07 Cement Plug 588.90 618.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References