X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084162908000

Well Details

Well ID: 0084162908000
Loading map...
Location: 00/08-29-008-16W4/0
Location Alias: 00/08-29-08-16 W4M
Location Alias 2: 00/08-29-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 29
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE HORSEFLY 8-29-8-16
Operator Name: Husky Oil Operations Limited
License Number: 0045113
License Date: 1973-02-14
License Status: RecCertified
Spud Date: 1973-02-21
Final Drill Date: 1973-02-27
Well Total Depth: 1001.00 m
Surface Hole Latitude: 49.675525
Surface Hole Longitude: -112.130805

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-14 Obtained License
1973-02-27 Finished Drilling
1973-02-27 Production Casing Operation Performed
1973-02-27 Well Mode changed to Drilled and Cased
1973-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-07 Perforation Treatment Performed - Jet Perforation
1973-03-09 Perforation Treatment Performed - Cement Squeeze
1973-03-10 Perforation Treatment Performed - Jet Perforation
1973-03-17 Well Began Production
1973-03-17 Well Fluid changed to Crude Oil
1973-03-17 Well Mode changed to Pumping
1983-01-25 Perforation Treatment Performed - Jet Perforation
1983-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-16 Well Fluid changed to Crude Oil
1999-02-16 Well Mode changed to Suspended
2003-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-16 Plug Back Performed
2003-11-16 Well Fluid changed to Crude Oil
2003-11-16 Well Mode changed to Abandoned Zone
2004-09-22 Well Abandoned
2004-09-22 Well Fluid changed to Crude Oil
2004-09-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-03-07 Perforation 965.00 966.50 13
1983-01-25 Perforation 966.80 968.30 12
1983-01-27 Acid Treatment 965.00 968.30 0
2003-11-16 Packing Device Capped w/Cement 951.00 959.00 0
1973-03-07 Perforation 966.80 968.30 13
1973-03-07 Perforation 969.90 972.00 13
1973-03-07 Acid Treatment 965.00 972.00 0
1973-03-09 Cement Squeeze 965.00 972.00 0
1973-03-10 Perforation 965.00 966.50 13
1973-03-10 Perforation 966.80 968.30 13
1973-03-10 Perforation 969.90 972.00 13
1983-01-25 Perforation 965.00 966.50 12

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 6284 0.0 0.0 0.0
1974 6377 0.0 0.0 0.0
1975 2533 0.0 0.0 0.0
1976 2484 0.0 0.0 0.0
1977 6330 0.0 0.0 0.0
1978 7929 0.0 0.0 0.0
1979 8052 0.0 0.0 0.0
1980 7293 0.0 0.0 0.0
1981 7744 0.0 0.0 0.0
1982 6558 0.0 0.0 0.0
1983 8103 0.0 0.0 0.0
1984 8691 0.0 0.0 0.0
1985 7502 0.0 0.0 0.0
1986 8430 0.0 0.0 0.0
1987 8381 0.0 0.0 0.0
1988 8299 0.0 0.0 0.0
1989 8588 0.0 0.0 0.0
1990 8361 0.0 0.0 0.0
1991 8296 0.0 0.0 0.0
1992 8400 0.0 0.0 0.0
1993 8545 0.0 0.0 0.0
1994 8688 0.0 0.0 0.0
1995 8757 0.0 0.0 0.0
1996 8767 0.0 0.0 0.0
1997 8739 0.0 0.0 0.0
1998 8738 0.0 0.0 0.0

For data sources see[5]

References