X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084220311000

Well Details

Well ID: 0084220311000
Loading map...
Location: 00/11-03-008-22W4/0
Location Alias: 00/11-03-08-22 W4M
Location Alias 2: 00/11-03-008-22 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 22
Section: 03
County/Municipality: Lethbridge County
Well Name: TAC 2-2 HZ PENNY 11-3-8-22
Operator Name: Tamarack Acquisition Corp.
License Number: 0489202
License Date: 2018-05-17
License Status: Issued
Spud Date: 2018-05-24
Final Drill Date: 2018-06-05
Well Total Depth: 3190.00 m
Surface Hole Latitude: 49.611329
Surface Hole Longitude: -112.880832

For data sources see[1][2]

Well History

Date Event
2018-05-17 Obtained License
2018-05-25 Surface Casing Operation Performed
2018-05-26 Direction Drilling Operation Performed - Deviate
2018-05-28 Direction Drilling Operation Performed - Horizontal
2018-05-29 Intermediate Casing Operation Performed
2018-05-29 Well Log Performed
2018-06-05 Finished Drilling
2018-06-05 Well Log Performed
2018-06-05 Well Mode changed to Drilled and Cased
2018-06-06 Liner Casing Operation Performed
2018-06-07 Rig Released
2018-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-23 Well Began Production
2018-06-23 Well Fluid changed to Crude Oil
2018-06-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-05-25 Excalibur Drilling Ltd. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-05-26 714.80 Deviate (5 - 79 degrees)
2018-05-28 1190.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-14 Multi-Stage Fracture 3149.60 3149.70 0
2018-06-14 Multi-Stage Fracture 2639.70 2639.80 0
2018-06-14 Multi-Stage Fracture 2589.40 2589.50 0
2018-06-14 Multi-Stage Fracture 2539.20 2539.30 0
2018-06-14 Multi-Stage Fracture 2489.00 2489.10 0
2018-06-14 Multi-Stage Fracture 2440.10 2440.20 0
2018-06-14 Multi-Stage Fracture 2390.60 2390.70 0
2018-06-14 Multi-Stage Fracture 2341.80 2341.90 0
2018-06-14 Multi-Stage Fracture 2292.40 2292.50 0
2018-06-14 Multi-Stage Fracture 2242.90 2243.00 0
2018-06-14 Multi-Stage Fracture 2193.70 2193.80 0
2018-06-14 Multi-Stage Fracture 3098.40 3098.50 0
2018-06-14 Multi-Stage Fracture 2144.00 2144.10 0
2018-06-14 Multi-Stage Fracture 2094.00 2094.10 0
2018-06-14 Multi-Stage Fracture 2043.80 2043.90 0
2018-06-14 Multi-Stage Fracture 1992.60 1992.70 0
2018-06-14 Multi-Stage Fracture 1941.30 1941.40 0
2018-06-14 Multi-Stage Fracture 1890.10 1890.20 0
2018-06-14 Multi-Stage Fracture 1838.90 1839.00 0
2018-06-14 Multi-Stage Fracture 1787.70 1787.80 0
2018-06-14 Multi-Stage Fracture 1736.50 1736.60 0
2018-06-14 Multi-Stage Fracture 1685.30 1685.40 0
2018-06-14 Multi-Stage Fracture 3047.40 3047.50 0
2018-06-14 Multi-Stage Fracture 1634.10 1634.20 0
2018-06-14 Multi-Stage Fracture 1582.80 1582.90 0
2018-06-14 Multi-Stage Fracture 1531.60 1531.70 0
2018-06-14 Multi-Stage Fracture 1480.40 1480.50 0
2018-06-14 Multi-Stage Fracture 1429.20 1429.30 0
2018-06-14 Multi-Stage Fracture 1377.90 1378.00 0
2018-06-14 Multi-Stage Fracture 1326.70 1326.80 0
2018-06-14 Multi-Stage Fracture 1275.40 1275.50 0
2018-06-14 Multi-Stage Fracture 2996.20 2996.30 0
2018-06-14 Multi-Stage Fracture 2944.90 2945.00 0
2018-06-14 Multi-Stage Fracture 2842.50 2842.60 0
2018-06-14 Multi-Stage Fracture 2791.20 2791.30 0
2018-06-14 Multi-Stage Fracture 2740.00 2740.10 0
2018-06-14 Multi-Stage Fracture 2688.80 2688.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-14 2018-06-14 1,059 2,895 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 88.1757 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 11.39 N/A
Iron Horse Spearhead Acid Package Fusion Technologies Inc. Acid Hydrogen Chloride 7647-01-0 100 0.4099 N/A
water Not Available 100 0.4099 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0516 N/A
water 7732-18-5 100 0.0516 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0573 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.0808 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1412 N/A
Ethylene glycol 107-21-1 100 0.1412 N/A
Potassium Carbonate 584-08-7 100 0.1412 N/A
Potassium Hydroxide 1310-58-3 100 0.1412 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0061 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3288 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0649 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0649 N/A
water 7732-18-5 100 0.0649 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-05 2018-06-10 Surface Water - River 3226
2018-06-02 2018-06-14 Municipal Water 466

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4529 0.0 0.0 0.0
2019 8529 0.0 0.0 0.0
2020 2121 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-06 No Incident Encountered 0.00 0.00
2018-06-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References