X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094171811000

Well Details

Well ID: 0094171811000
Loading map...
Location: 00/11-18-009-17W4/0
Location Alias: 00/11-18-09-17 W4M
Location Alias 2: 00/11-18-009-17 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 17
Section: 18
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE 11B TABER 11-18-9-17
Operator Name: Husky Oil Operations Limited
License Number: 0189011
License Date: 1996-06-25
License Status: RecCertified
Spud Date: 1996-07-25
Final Drill Date: 1996-07-28
Well Total Depth: 1071.00 m
Surface Hole Latitude: 49.734504
Surface Hole Longitude: -112.300690

For data sources see[1][2]

Well History

Date Event
1996-06-25 Obtained License
1996-07-26 Direction Drilling Operation Performed - Deviate
1996-07-26 Surface Casing Operation Performed
1996-07-28 Finished Drilling
1996-07-28 Well Log Performed
1996-07-29 Production Casing Operation Performed
1996-07-29 Rig Released
1996-07-29 Well Mode changed to Drilled and Cased
1996-08-12 Well Log Performed
1996-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Plug Back Performed
1996-08-15 Perforation Treatment Performed - Jet Perforation
1996-09-04 Perforation Treatment Performed - Fractured
2001-04-02 Well Began Production
2001-04-02 Well Fluid changed to Gas
2001-04-02 Well Mode changed to Flowing
2004-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-10 Plug Back Performed
2004-12-10 Well Fluid changed to Gas
2004-12-10 Well Log Performed
2004-12-10 Well Mode changed to Abandoned Zone
2010-11-05 Well Abandoned
2010-11-05 Well Fluid changed to Gas
2010-11-05 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-26 265.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-14 Perforation 1042.00 1044.00 13
1996-08-14 Packing Device Capped w/Cement 1032.00 1040.00 0
1996-08-15 Perforation 1006.50 1008.50 13
1996-09-04 Fracture 1006.50 1008.50 0
2004-12-10 Packing Device Capped w/Cement 994.00 1002.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5713 0.0 0.0 0.0
2002 8613 0.0 0.0 0.0
2003 1329 0.0 0.0 0.0

For data sources see[6]

References