X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104180215000

Well Details

Well ID: 0104180215000
Loading map...
Location: 00/15-02-010-18W4/0
Location Alias: 00/15-02-10-18 W4M
Location Alias 2: 00/15-02-010-18 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 18
Section: 02
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE 15B TURIN 15-2-10-18
Operator Name: Husky Oil Operations Limited
License Number: 0171179
License Date: 1994-10-05
License Status: RecCertified
Spud Date: 1995-08-30
Final Drill Date: 1995-09-02
Well Total Depth: 1039.00 m
Surface Hole Latitude: 49.797331
Surface Hole Longitude: -112.340438

For data sources see[1][2]

Well History

Date Event
1994-10-05 Obtained License
1995-08-30 Surface Casing Operation Performed
1995-09-02 Finished Drilling
1995-09-02 Well Log Performed
1995-09-02 Well Mode changed to Drilled and Cased
1995-09-03 Production Casing Operation Performed
1995-09-03 Rig Released
1995-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-11 Perforation Treatment Performed - Jet Perforation
1995-09-11 Plug Back Performed
1995-09-12 Perforation Treatment Performed - Jet Perforation
1996-02-07 Well Began Production
1996-02-07 Well Fluid changed to Gas
1996-02-07 Well Mode changed to Flowing
1996-05-16 Well Fluid changed to Gas
1996-05-16 Well Mode changed to Suspended
1996-05-31 Well Fluid changed to Gas
1996-05-31 Well Mode changed to Flowing
1998-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-24 Perforation Treatment Performed - Jet Perforation
1998-11-24 Plug Back Performed
1998-11-24 Well Fluid changed to Gas
1998-11-24 Well Mode changed to Abandoned Zone
1999-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-13 Plug Back Performed
1999-10-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-11 Perforation 1023.00 1025.00 13
1995-09-11 Packing Device Capped w/Cement 1017.00 1020.00 0
1995-09-12 Perforation 987.00 989.00 13
1998-11-24 Packing Device Capped w/Cement 970.00 978.00 0
1998-11-24 Perforation 672.50 674.00 13
1999-10-13 Packing Device Capped w/Cement 658.00 666.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5913 0.0 0.0 0.0
1997 7019 0.0 0.0 0.0
1998 6622 0.0 0.0 0.0

For data sources see[5]

References