X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114181413000

Well Details

Well ID: 0114181413000
Loading map...
Location: 00/13-14-011-18W4/0
Location Alias: 00/13-14-11-18 W4M
Location Alias 2: 00/13-14-011-18 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 18
Section: 14
County/Municipality: Municipal District of Taber
Well Name: ACANTHUS TURIN 13-14-11-18
Operator Name: Baytex Energy Ltd.
License Number: 0145659
License Date: 1990-10-03
License Status: Issued
Spud Date: 1990-10-29
Final Drill Date: 1990-11-01
Well Total Depth: 1140.00 m
Surface Hole Latitude: 49.915373
Surface Hole Longitude: -112.368458

For data sources see[1][2]

Well History

Date Event
1990-10-03 Obtained License
1990-10-29 Surface Casing Operation Performed
1990-11-01 Finished Drilling
1990-11-01 Well Mode changed to Drilled and Cased
1990-11-02 Drill Stem Test Performed
1990-11-02 Well Log Performed
1990-11-03 Drill Stem Test Performed
1990-11-04 Production Casing Operation Performed
1990-11-04 Rig Released
1990-11-12 Well Log Performed
1990-11-14 Well Log Performed
1990-11-15 Perforation Treatment Performed - Jet Perforation
1990-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-25 Perforation Treatment Performed - Fractured
1990-12-01 Well Began Production
1990-12-01 Well Fluid changed to Crude Oil
1990-12-01 Well Mode changed to Flowing
1993-11-15 Well Fluid changed to Crude Oil
1993-11-15 Well Mode changed to Pumping
1996-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-11-15 Perforation 1093.50 1094.00 13
1990-11-15 Perforation 1095.50 1097.00 13
1990-11-15 Perforation 1098.00 1100.00 13
1990-11-17 Acid Treatment 1093.50 1100.00 0
1990-11-25 Fracture 1093.50 1100.00 0
1996-04-27 Acid Treatment 1093.50 1100.00 0
2003-08-10 Acid Treatment 1093.50 1100.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 744 0.0 0.0 0.0
1991 5543 0.0 0.0 0.0
1992 5791 0.0 0.0 0.0
1993 6415 0.0 0.0 0.0
1994 8339 0.0 0.0 0.0
1995 8247 0.0 0.0 0.0
1996 8405 0.0 0.0 0.0
1997 8542 0.0 0.0 0.0
1998 8610 0.0 0.0 0.0
1999 8560 0.0 0.0 0.0
2000 8383 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8734 0.0 0.0 0.0
2003 8622 0.0 0.0 0.0
2004 7951 0.0 0.0 0.0
2005 8681 0.0 0.0 0.0
2006 8729 0.0 0.0 0.0
2007 8754 0.0 0.0 0.0
2008 8560 0.0 0.0 0.0
2009 8757 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8579 0.0 0.0 0.0
2012 8757 0.0 0.0 0.0
2013 8489 0.0 0.0 0.0
2014 8738 0.0 0.0 0.0
2015 8625 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8502 0.0 0.0 0.0
2018 8746 0.0 0.0 0.0
2019 8525 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References