If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134102210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.101603,"lon":-111.285169,"icon":""}]} |
Location: 00/10-22-013-10W4/0 | |
Location Alias: 00/10-22-13-10 W4M | |
Location Alias 2: 00/10-22-013-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 10 | |
Section: 22 | |
County/Municipality: Cypress County | |
Well Name: ESSOVEN ET AL ALDER 10-22-13-10 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0053575 | |
License Date: 1975-05-15 | |
License Status: RecCertified | |
Spud Date: 1975-06-02 | |
Final Drill Date: 1975-06-04 | |
Well Total Depth: 629.40 m | |
Surface Hole Latitude: 50.101603 | |
Surface Hole Longitude: -111.285169 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-05-15 | Obtained License |
1975-06-02 | Lost Circulation Occurred |
1975-06-04 | Finished Drilling |
1975-06-04 | Production Casing Operation Performed |
1975-06-18 | Perforation Treatment Performed - Jet Perforation |
1975-06-28 | Perforation Treatment Performed - Fractured |
1975-06-30 | Perforation Treatment Performed - Jet Perforation |
1975-07-02 | Perforation Treatment Performed - Fractured |
1975-07-05 | Perforation Treatment Performed - Jet Perforation |
1975-07-09 | Perforation Treatment Performed - Fractured |
1976-04-01 | Well Mode changed to Drilled and Cased |
1976-07-30 | Well Began Production |
1976-07-30 | Well Fluid changed to Gas |
1976-07-30 | Well Mode changed to Flowing |
1989-10-31 | Well Fluid changed to Gas |
1989-10-31 | Well Mode changed to Suspended |
1991-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-05-31 | Perforation Treatment Performed - Jet Perforation |
1991-05-31 | Plug Back Performed |
1991-05-31 | Well Fluid changed to Gas |
1991-05-31 | Well Mode changed to Abandoned Zone |
1991-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-06-03 | Perforation Treatment Performed - Remedial Casing |
1991-06-03 | Plug Back Performed |
1991-09-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-06-18 | Perforation | 566.00 | 569.10 | 7 |
1975-07-02 | Fracture | 512.70 | 530.40 | 0 |
1975-07-05 | Perforation | 243.80 | 246.30 | 3 |
1975-07-05 | Perforation | 256.60 | 259.10 | 3 |
1975-07-05 | Perforation | 273.10 | 274.90 | 3 |
1975-07-05 | Perforation | 289.00 | 292.00 | 3 |
1975-07-05 | Perforation | 296.90 | 298.10 | 3 |
1975-07-05 | Perforation | 309.40 | 311.20 | 3 |
1975-07-05 | Perforation | 315.50 | 317.00 | 3 |
1975-07-05 | Perforation | 321.90 | 323.10 | 3 |
1975-07-05 | Perforation | 331.30 | 333.50 | 3 |
1975-06-18 | Perforation | 571.50 | 573.30 | 7 |
1975-07-05 | Perforation | 345.00 | 348.10 | 3 |
1975-07-05 | Perforation | 358.40 | 359.70 | 3 |
1975-07-05 | Perforation | 367.30 | 370.30 | 3 |
1975-07-05 | Perforation | 373.70 | 376.10 | 3 |
1975-07-05 | Perforation | 383.10 | 385.30 | 3 |
1975-07-05 | Perforation | 391.70 | 393.20 | 3 |
1975-07-05 | Perforation | 397.80 | 400.80 | 3 |
1975-07-05 | Perforation | 403.60 | 405.40 | 3 |
1975-07-05 | Perforation | 409.00 | 410.30 | 3 |
1975-07-05 | Perforation | 413.00 | 414.50 | 3 |
1975-06-18 | Perforation | 577.90 | 580.30 | 7 |
1975-07-09 | Fracture | 243.80 | 414.50 | 0 |
1991-05-31 | Packing Device Capped w/Cement | 549.70 | 557.70 | 0 |
1991-05-31 | Perforation | 232.40 | 233.00 | 13 |
1991-06-03 | Acid Treatment | 232.40 | 233.00 | 0 |
1991-06-03 | Remedial Casing Cementing | 232.40 | 233.00 | 0 |
1991-06-03 | Packing Device Capped w/Cement | 162.00 | 235.00 | 0 |
1975-06-18 | Perforation | 598.60 | 600.50 | 7 |
1975-06-28 | Fracture | 566.00 | 600.50 | 0 |
1975-06-30 | Perforation | 512.70 | 514.50 | 3 |
1975-06-30 | Perforation | 518.80 | 520.60 | 3 |
1975-06-30 | Perforation | 522.40 | 524.30 | 3 |
1975-06-30 | Perforation | 528.50 | 530.40 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 3226 | 0.0 | 0.0 | 0.0 |
1977 | 6583 | 0.0 | 0.0 | 0.0 |
1978 | 2318 | 0.0 | 0.0 | 0.0 |
1979 | 5121 | 0.0 | 0.0 | 0.0 |
1980 | 6645 | 0.0 | 0.0 | 0.0 |
1981 | 8133 | 0.0 | 0.0 | 0.0 |
1982 | 3362 | 0.0 | 0.0 | 0.0 |
1983 | 3500 | 0.0 | 0.0 | 0.0 |
1984 | 5110 | 0.0 | 0.0 | 0.0 |
1985 | 4924 | 0.0 | 0.0 | 0.0 |
1986 | 4161 | 0.0 | 0.0 | 0.0 |
1987 | 3397 | 0.0 | 0.0 | 0.0 |
1988 | 3091 | 0.0 | 0.0 | 0.0 |
1989 | 1949 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1975-06-02 | Lost Circulation | 9.10 | 9.10 |
For data sources see[6]