If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134172314003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.104306,"lon":-112.225351,"icon":""}]} |
Location: 00/14-23-013-17W4/3 | |
Location Alias: 00/14-23-13-17 W4M | |
Location Alias 2: 00/14-23-013-17 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 17 | |
Section: 23 | |
County/Municipality: Municipal District of Taber | |
Well Name: ESSO ENCHANT NO. A-1 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0005873 | |
License Date: 1952-12-24 | |
License Status: Abandoned | |
Spud Date: 1952-12-29 | |
Final Drill Date: 1953-01-29 | |
Well Total Depth: 1052.80 m | |
Surface Hole Latitude: 50.104306 | |
Surface Hole Longitude: -112.225351 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-12-24 | Obtained License |
1953-01-03 | Drill Stem Test Performed |
1953-01-06 | Drill Stem Test Performed |
1953-01-07 | Drill Stem Test Performed |
1953-01-08 | Drill Stem Test Performed |
1953-01-11 | Drill Stem Test Performed |
1953-01-13 | Drill Stem Test Performed |
1953-01-18 | Drill Stem Test Performed |
1953-01-19 | Drill Stem Test Performed |
1953-01-20 | Drill Stem Test Performed |
1953-01-21 | Drill Stem Test Performed |
1953-01-22 | Drill Stem Test Performed |
1953-01-24 | Drill Stem Test Performed |
1953-01-25 | Drill Stem Test Performed |
1953-01-27 | Drill Stem Test Performed |
1953-01-28 | Drill Stem Test Performed |
1953-01-29 | Finished Drilling |
1953-01-29 | Well Mode changed to Drilled and Cased |
1953-01-30 | Production Casing Operation Performed |
1953-02-01 | Perforation Treatment Performed - Cement Squeeze |
1953-02-01 | Perforation Treatment Performed - Jet Perforation |
1953-02-04 | Perforation Treatment Performed - Cement Squeeze |
1953-02-04 | Perforation Treatment Performed - Jet Perforation |
1953-02-08 | Perforation Treatment Performed - Jet Perforation |
1953-02-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1953-02-11 | Perforation Treatment Performed - Bullet Perforation |
1953-02-11 | Perforation Treatment Performed - Cement Squeeze |
1964-07-03 | Perforation Treatment Performed - Selective Jet Perforations |
1964-07-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-04-13 | Perforation Treatment Performed - Jet Perforation |
1980-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-06-19 | Perforation Treatment Performed - Jet Perforation |
1980-07-15 | Perforation Treatment Performed - Fractured |
1980-07-16 | Well Began Production |
1980-07-16 | Well Fluid changed to Gas |
1980-07-16 | Well Mode changed to Flowing |
1982-07-27 | Perforation Treatment Performed - Jet Perforation |
1983-06-09 | Well Fluid changed to Gas |
1983-06-09 | Well Mode changed to Abandoned Zone |
1983-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-06-10 | Perforation Treatment Performed - Cement Squeeze |
1983-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-06-21 | Perforation Treatment Performed - Jet Perforation |
1985-01-26 | Perforation Treatment Performed - Fractured |
1989-10-11 | Well Log Performed |
1989-10-12 | Perforation Treatment Performed - Cement Squeeze |
1989-10-12 | Plug Back Performed |
1989-10-13 | Perforation Treatment Performed - Cement Squeeze |
1989-10-14 | Perforation Treatment Performed - Jet Perforation |
1989-10-14 | Well Log Performed |
1989-10-15 | Perforation Treatment Performed - Remedial Casing |
1989-10-16 | Perforation Treatment Performed - Jet Perforation |
1989-10-16 | Perforation Treatment Performed - Remedial Casing |
1989-10-16 | Well Log Performed |
1989-10-19 | Perforation Treatment Performed - Jet Perforation |
1989-10-19 | Perforation Treatment Performed - Remedial Casing |
1989-10-19 | Well Log Performed |
1989-10-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-02-01 | Perforation | 1036.90 | 1037.80 | 13 |
1953-02-11 | Bullet Perforation | 1037.20 | 1038.10 | 10 |
1964-07-03 | Selective Jet Perforations | 1021.40 | 1021.70 | 0 |
1964-07-03 | Selective Jet Perforations | 1022.30 | 1023.80 | 0 |
1964-07-03 | Selective Jet Perforations | 1028.40 | 1030.20 | 0 |
1964-07-03 | Selective Jet Perforations | 1031.40 | 1033.30 | 0 |
1964-07-05 | Acid Treatment | 1021.40 | 1033.30 | 0 |
1969-09-19 | Packing Device Capped w/Cement | 1035.40 | 1035.40 | 0 |
1977-04-13 | Perforation | 810.80 | 812.00 | 7 |
1980-06-19 | Perforation | 755.30 | 756.30 | 9 |
1980-06-19 | Acid Treatment | 755.30 | 756.30 | 0 |
1953-02-01 | Perforation | 1035.10 | 1035.40 | 13 |
1980-07-15 | Fracture | 755.30 | 756.30 | 0 |
1982-07-27 | Perforation | 763.20 | 763.50 | 13 |
1983-06-10 | Acid Treatment | 763.20 | 763.50 | 0 |
1983-06-10 | Cement Squeeze | 755.30 | 812.00 | 0 |
1983-06-20 | Packing Device Capped w/Cement | 971.00 | 985.00 | 0 |
1983-06-21 | Perforation | 885.40 | 887.60 | 7 |
1983-06-21 | Perforation | 888.80 | 890.00 | 7 |
1985-01-26 | Fracture | 885.40 | 890.00 | 0 |
1989-10-12 | Cement Squeeze | 885.40 | 890.00 | 0 |
1989-10-13 | Cement Squeeze | 755.30 | 763.50 | 0 |
1953-02-01 | Cement Squeeze | 1035.10 | 1037.80 | 0 |
1989-10-14 | Perforation | 620.00 | 621.00 | 14 |
1989-10-15 | Remedial Casing Cementing | 620.00 | 621.00 | 0 |
1989-10-16 | Perforation | 279.00 | 280.00 | 14 |
1989-10-16 | Remedial Casing Cementing | 279.00 | 280.00 | 0 |
1989-10-19 | Perforation | 175.00 | 176.00 | 14 |
1989-10-19 | Perforation | 155.00 | 156.00 | 14 |
1989-10-19 | Remedial Casing Cementing | 155.00 | 176.00 | 0 |
1953-02-04 | Perforation | 1035.10 | 1035.40 | 13 |
1953-02-04 | Cement Squeeze | 1035.10 | 1035.40 | 0 |
1953-02-08 | Perforation | 1036.90 | 1037.80 | 13 |
1953-02-11 | Acid Wash | 1036.90 | 1037.80 | 0 |
1953-02-11 | Cement Squeeze | 1036.90 | 1037.80 | 0 |
1953-02-11 | Acid Wash | 1036.90 | 1037.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 2319 | 0.0 | 0.0 | 0.0 |
1981 | 5788 | 0.0 | 0.0 | 0.0 |
1982 | 2961 | 0.0 | 0.0 | 0.0 |
For data sources see[5]