X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134172314004

Well Details

Well ID: 0134172314004
Loading map...
Location: 00/14-23-013-17W4/4
Location Alias: 00/14-23-13-17 W4M
Location Alias 2: 00/14-23-013-17 W4/04
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 23
County/Municipality: Municipal District of Taber
Well Name: ESSO ENCHANT NO. A-1
Operator Name: Imperial Oil Resources Limited
License Number: 0005873
License Date: 1952-12-24
License Status: Abandoned
Spud Date: 1952-12-29
Final Drill Date: 1953-01-29
Well Total Depth: 1052.80 m
Surface Hole Latitude: 50.104306
Surface Hole Longitude: -112.225351

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-24 Obtained License
1953-01-03 Drill Stem Test Performed
1953-01-06 Drill Stem Test Performed
1953-01-07 Drill Stem Test Performed
1953-01-08 Drill Stem Test Performed
1953-01-11 Drill Stem Test Performed
1953-01-13 Drill Stem Test Performed
1953-01-18 Drill Stem Test Performed
1953-01-19 Drill Stem Test Performed
1953-01-20 Drill Stem Test Performed
1953-01-21 Drill Stem Test Performed
1953-01-22 Drill Stem Test Performed
1953-01-24 Drill Stem Test Performed
1953-01-25 Drill Stem Test Performed
1953-01-27 Drill Stem Test Performed
1953-01-28 Drill Stem Test Performed
1953-01-29 Finished Drilling
1953-01-30 Production Casing Operation Performed
1953-02-01 Perforation Treatment Performed - Cement Squeeze
1953-02-01 Perforation Treatment Performed - Jet Perforation
1953-02-04 Perforation Treatment Performed - Cement Squeeze
1953-02-04 Perforation Treatment Performed - Jet Perforation
1953-02-08 Perforation Treatment Performed - Jet Perforation
1953-02-11 Perforation Treatment Performed - Acid Wash - No Pressure
1953-02-11 Perforation Treatment Performed - Bullet Perforation
1953-02-11 Perforation Treatment Performed - Cement Squeeze
1964-07-03 Perforation Treatment Performed - Selective Jet Perforations
1964-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-04-13 Perforation Treatment Performed - Jet Perforation
1980-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-19 Perforation Treatment Performed - Jet Perforation
1980-07-15 Perforation Treatment Performed - Fractured
1982-07-27 Perforation Treatment Performed - Jet Perforation
1983-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-10 Perforation Treatment Performed - Cement Squeeze
1983-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-06-21 Perforation Treatment Performed - Jet Perforation
1983-07-22 Well Mode changed to Drilled and Cased
1985-01-26 Perforation Treatment Performed - Fractured
1989-10-11 Well Log Performed
1989-10-12 Perforation Treatment Performed - Cement Squeeze
1989-10-12 Plug Back Performed
1989-10-12 Well Mode changed to Abandoned
1989-10-13 Perforation Treatment Performed - Cement Squeeze
1989-10-14 Perforation Treatment Performed - Jet Perforation
1989-10-14 Well Log Performed
1989-10-15 Perforation Treatment Performed - Remedial Casing
1989-10-16 Perforation Treatment Performed - Jet Perforation
1989-10-16 Perforation Treatment Performed - Remedial Casing
1989-10-16 Well Log Performed
1989-10-19 Perforation Treatment Performed - Jet Perforation
1989-10-19 Perforation Treatment Performed - Remedial Casing
1989-10-19 Well Log Performed
1989-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-01 Perforation 1036.90 1037.80 13
1953-02-11 Bullet Perforation 1037.20 1038.10 10
1964-07-03 Selective Jet Perforations 1021.40 1021.70 0
1964-07-03 Selective Jet Perforations 1022.30 1023.80 0
1964-07-03 Selective Jet Perforations 1028.40 1030.20 0
1964-07-03 Selective Jet Perforations 1031.40 1033.30 0
1964-07-05 Acid Treatment 1021.40 1033.30 0
1969-09-19 Packing Device Capped w/Cement 1035.40 1035.40 0
1977-04-13 Perforation 810.80 812.00 7
1980-06-19 Perforation 755.30 756.30 9
1980-06-19 Acid Treatment 755.30 756.30 0
1953-02-01 Perforation 1035.10 1035.40 13
1980-07-15 Fracture 755.30 756.30 0
1982-07-27 Perforation 763.20 763.50 13
1983-06-10 Acid Treatment 763.20 763.50 0
1983-06-10 Cement Squeeze 755.30 812.00 0
1983-06-20 Packing Device Capped w/Cement 971.00 985.00 0
1983-06-21 Perforation 885.40 887.60 7
1983-06-21 Perforation 888.80 890.00 7
1985-01-26 Fracture 885.40 890.00 0
1989-10-12 Cement Squeeze 885.40 890.00 0
1989-10-13 Cement Squeeze 755.30 763.50 0
1953-02-01 Cement Squeeze 1035.10 1037.80 0
1989-10-14 Perforation 620.00 621.00 14
1989-10-15 Remedial Casing Cementing 620.00 621.00 0
1989-10-16 Perforation 279.00 280.00 14
1989-10-16 Remedial Casing Cementing 279.00 280.00 0
1989-10-19 Perforation 175.00 176.00 14
1989-10-19 Perforation 155.00 156.00 14
1989-10-19 Remedial Casing Cementing 155.00 176.00 0
1953-02-04 Perforation 1035.10 1035.40 13
1953-02-04 Cement Squeeze 1035.10 1035.40 0
1953-02-08 Perforation 1036.90 1037.80 13
1953-02-11 Acid Wash 1036.90 1037.80 0
1953-02-11 Cement Squeeze 1036.90 1037.80 0
1953-02-11 Acid Wash 1036.90 1037.80 0

For data sources see[4]



References