If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164132906022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.375045,"lon":-111.758782,"icon":""}]} |
Location: 02/06-29-016-13W4/2 | |
Location Alias: 02/06-29-16-13 W4M | |
Location Alias 2: 02/06-29-016-13 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 13 | |
Section: 29 | |
County/Municipality: County of Newell | |
Well Name: ESSOVEN BANTRY 6-29-16-13 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0061135 | |
License Date: 1976-11-15 | |
License Status: RecCertified | |
Spud Date: 1976-11-16 | |
Final Drill Date: 1976-11-17 | |
Well Total Depth: 464.80 m | |
Surface Hole Latitude: 50.375045 | |
Surface Hole Longitude: -111.758782 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-11-15 | Obtained License |
1976-11-17 | Finished Drilling |
1976-11-18 | Production Casing Operation Performed |
1976-11-22 | Perforation Treatment Performed - Jet Perforation |
1976-11-23 | Perforation Treatment Performed - Fractured |
1976-11-24 | Perforation Treatment Performed - Jet Perforation |
1976-11-24 | Perforation Treatment Performed - Selective Jet Perforations |
1976-11-25 | Perforation Treatment Performed - Fractured |
1977-04-01 | Well Mode changed to Drilled and Cased |
1977-12-21 | Well Began Production |
1977-12-21 | Well Fluid changed to Gas |
1977-12-21 | Well Mode changed to Flowing |
1991-04-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-04-18 | Plug Back Performed |
1991-04-18 | Well Abandoned |
1991-04-18 | Well Fluid changed to Gas |
1991-04-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-11-22 | Perforation | 422.50 | 425.50 | 3 |
1976-11-24 | Perforation | 367.60 | 368.80 | 3 |
1976-11-25 | Fracture | 295.00 | 368.80 | 0 |
1991-04-18 | Packing Device Capped w/Cement | 277.00 | 285.00 | 0 |
1976-11-22 | Perforation | 430.40 | 432.80 | 7 |
1976-11-22 | Perforation | 435.90 | 438.30 | 7 |
1976-11-23 | Fracture | 422.50 | 438.30 | 0 |
1976-11-24 | Selective Jet Perforations | 295.00 | 327.40 | 0 |
1976-11-24 | Perforation | 313.90 | 316.40 | 3 |
1976-11-24 | Perforation | 320.00 | 320.60 | 3 |
1976-11-24 | Perforation | 326.10 | 326.70 | 3 |
1976-11-24 | Perforation | 359.70 | 360.90 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 250 | 0.0 | 0.0 | 0.0 |
1978 | 6478 | 0.0 | 0.0 | 0.0 |
1979 | 6333 | 0.0 | 0.0 | 0.0 |
1980 | 6041 | 0.0 | 0.0 | 0.0 |
1981 | 7393 | 0.0 | 0.0 | 0.0 |
1982 | 4229 | 0.0 | 0.0 | 0.0 |
1983 | 8476 | 0.0 | 0.0 | 0.0 |
1984 | 8698 | 0.0 | 0.0 | 0.0 |
1985 | 7352 | 0.0 | 0.0 | 0.0 |
1986 | 7379 | 0.0 | 0.0 | 0.0 |
1987 | 6434 | 0.0 | 0.0 | 0.0 |
1988 | 8614 | 0.0 | 0.0 | 0.0 |
1989 | 8495 | 0.0 | 0.0 | 0.0 |
1990 | 8663 | 0.0 | 0.0 | 0.0 |
1991 | 2448 | 0.0 | 0.0 | 0.0 |
For data sources see[5]