If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164293608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.388969,"lon":-113.855962,"icon":""}]} |
Location: 00/08-36-016-29W4/0 | |
Location Alias: 00/08-36-16-29 W4M | |
Location Alias 2: 00/08-36-016-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 29 | |
Section: 36 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: ESSO NANTON 8-36-16-29 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0084971 | |
License Date: 1980-08-15 | |
License Status: Re-Entered | |
Spud Date: 1980-09-09 | |
Final Drill Date: 1980-10-11 | |
Well Total Depth: 2665.00 m | |
Surface Hole Latitude: 50.388969 | |
Surface Hole Longitude: -113.855962 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-15 | Obtained License |
1980-10-07 | Well Log Performed |
1980-10-11 | Finished Drilling |
1980-10-12 | Well Log Performed |
1980-10-14 | Production Casing Operation Performed |
1980-11-30 | Perforation Treatment Performed - Jet Perforation |
1980-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-01 | Perforation Treatment Performed - Fractured |
1980-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-12-07 | Perforation Treatment Performed - Jet Perforation |
1980-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-12-10 | Perforation Treatment Performed - Jet Perforation |
1980-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-20 | Perforation Treatment Performed - Cement Squeeze |
1981-01-16 | Perforation Treatment Performed - Jet Perforation |
1981-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-23 | Perforation Treatment Performed - Cement Squeeze |
1981-02-19 | Perforation Treatment Performed - Jet Perforation |
1981-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-02-27 | Perforation Treatment Performed - Cement Squeeze |
1981-03-02 | Perforation Treatment Performed - Jet Perforation |
1981-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-10 | Perforation Treatment Performed - Fractured |
1981-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-07-26 | Perforation Treatment Performed - Jet Perforation |
1981-07-31 | Perforation Treatment Performed - Cement Squeeze |
1981-07-31 | Well Abandoned |
1981-07-31 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-30 | Perforation | 2590.00 | 2596.00 | 7 |
1980-12-15 | Acid Treatment | 2544.00 | 2549.00 | 0 |
1980-12-20 | Cement Squeeze | 2544.00 | 2549.00 | 0 |
1981-01-16 | Perforation | 2544.00 | 2549.00 | 7 |
1981-01-17 | Acid Treatment | 2544.00 | 2549.00 | 0 |
1981-01-23 | Cement Squeeze | 2544.00 | 2549.00 | 0 |
1981-02-19 | Perforation | 2544.00 | 2549.00 | 7 |
1981-02-21 | Acid Treatment | 2544.00 | 2546.00 | 0 |
1981-02-27 | Cement Squeeze | 2544.00 | 2549.00 | 0 |
1981-02-27 | Packing Device Capped w/Cement | 2505.00 | 2533.00 | 0 |
1981-03-02 | Perforation | 2200.00 | 2204.00 | 7 |
1980-12-01 | Acid Treatment | 2590.00 | 2596.00 | 0 |
1981-03-02 | Perforation | 2214.00 | 2217.00 | 7 |
1981-03-07 | Acid Treatment | 2200.00 | 2217.00 | 0 |
1981-03-10 | Fracture | 2200.00 | 2217.00 | 0 |
1981-07-24 | Packing Device Capped w/Cement | 2177.00 | 2185.00 | 0 |
1981-07-26 | Perforation | 2103.00 | 2109.00 | 7 |
1981-07-31 | Cement Squeeze | 2103.00 | 2109.00 | 0 |
1980-12-01 | Fracture | 2590.00 | 2596.00 | 0 |
1980-12-06 | Packing Device Capped w/Cement | 2572.00 | 2580.00 | 0 |
1980-12-07 | Perforation | 2558.00 | 2562.00 | 6 |
1980-12-09 | Packing Device Capped w/Cement | 2552.50 | 2556.50 | 0 |
1980-12-10 | Perforation | 2544.00 | 2549.00 | 6 |
1980-12-11 | Acid Treatment | 2544.00 | 2549.00 | 0 |
1980-12-12 | Acid Treatment | 2544.00 | 2549.00 | 0 |
For data sources see[4]