X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194141210000

Well Details

Well ID: 0194141210000
Loading map...
Location: 00/10-12-019-14W4/0
Location Alias: 00/10-12-19-14 W4M
Location Alias 2: 00/10-12-019-14 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 14
Section: 12
County/Municipality: County of Newell
Well Name: RENAISSANCE BANTRY 10-12-19-14
Operator Name: Husky Oil Operations Limited
License Number: 0028075
License Date: 1965-04-01
License Status: RecCertified
Spud Date: 1965-05-12
Final Drill Date: 1965-05-22
Well Total Depth: 1036.30 m
Surface Hole Latitude: 50.595633
Surface Hole Longitude: -111.814075

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-04-01 Obtained License
1965-05-19 Drill Stem Test Performed
1965-05-20 Drill Stem Test Performed
1965-05-21 Drill Stem Test Performed
1965-05-22 Finished Drilling
1965-05-22 Production Casing Operation Performed
1965-05-22 Well Mode changed to Drilled and Cased
1965-05-27 Perforation Treatment Performed - Jet Perforation
1965-05-28 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-12 Perforation Treatment Performed - Cement Squeeze
1965-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-13 Perforation Treatment Performed - Jet Perforation
1965-09-13 Well Fluid changed to Crude Oil
1965-09-13 Well Mode changed to Potential
1965-09-14 Perforation Treatment Performed - Cement Plug
1965-09-14 Well Abandoned
1965-09-14 Well Fluid changed to Crude Oil
1965-09-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-05-27 Perforation 1016.20 1018.90 7
1965-05-28 Acid Wash 1016.20 1018.90 0
1965-09-12 Cement Squeeze 1016.20 1018.90 0
1965-09-13 Perforation 1005.80 1006.40 16
1965-09-13 Acid Wash 1005.80 1006.40 0
1965-09-13 Acid Treatment 1005.80 1006.40 0
1965-09-14 Cement Plug 967.70 1013.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0

For data sources see[5]

References