X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194293511000

Well Details

Well ID: 0194293511000
Loading map...
Location: 00/11-35-019-29W4/0
Location Alias: 00/11-35-19-29 W4M
Location Alias 2: 00/11-35-019-29 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 29
Section: 35
County/Municipality: Foothills County
Well Name: JEFF LAKE ETAL S OKOTOKS 11-35-19-29
Operator Name: CNOOC Petroleum North America ULC
License Number: 0037122
License Date: 1969-10-29
License Status: RecCertified
Spud Date: 1969-11-08
Final Drill Date: 1969-12-17
Well Total Depth: 2907.20 m
Surface Hole Latitude: 50.654845
Surface Hole Longitude: -113.921442

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-10-29 Obtained License
1969-11-30 Drill Stem Test Performed
1969-12-15 Drill Stem Test Performed
1969-12-17 Finished Drilling
1969-12-17 Well Mode changed to Drilled and Cased
1969-12-20 Production Casing Operation Performed
1970-01-10 Perforation Treatment Performed - Jet Perforation
1970-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-21 Perforation Treatment Performed - Jet Perforation
1970-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-26 Perforation Treatment Performed - Jet Perforation
1970-01-31 Perforation Treatment Performed - Cement Squeeze
1970-02-02 Perforation Treatment Performed - Cement Squeeze
1970-02-05 Perforation Treatment Performed - Jet Perforation
1970-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-05-27 Perforation Treatment Performed - Cement Squeeze
1970-05-27 Perforation Treatment Performed - Jet Perforation
1970-05-28 Well Began Production
1970-05-28 Well Fluid changed to Crude Oil
1970-05-28 Well Mode changed to Flowing
1970-06-12 Well Fluid changed to Crude Oil
1970-06-12 Well Mode changed to Pumping
1970-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-20 Well Fluid changed to Crude Oil
1970-10-20 Well Mode changed to Suspended
1974-08-28 Perforation Treatment Performed - Cement Squeeze
1974-09-01 Well Abandoned
1974-09-01 Well Fluid changed to Crude Oil
1974-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-10 Perforation 2392.70 2394.50 10
1970-02-06 Acid Treatment 2374.70 2377.40 0
1970-02-06 Acid Treatment 2380.80 2382.00 0
1970-05-27 Perforation 2366.50 2370.70 7
1970-05-27 Cement Squeeze 2374.70 2377.40 0
1970-05-27 Cement Squeeze 2380.80 2382.00 0
1970-09-10 Acid Treatment 2366.50 2370.70 0
1974-08-28 Cement Squeeze 2366.50 2370.70 0
1970-01-14 Acid Treatment 2392.70 2394.50 0
1970-01-21 Perforation 2414.90 2418.30 7
1970-01-22 Acid Treatment 2414.90 2418.30 0
1970-01-26 Perforation 2374.70 2377.40 7
1970-01-31 Cement Squeeze 2414.90 2418.30 0
1970-02-02 Cement Squeeze 2414.90 2418.30 0
1970-02-05 Perforation 2374.70 2377.40 7
1970-02-05 Perforation 2380.80 2382.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1128 0.0 0.0 0.0

For data sources see[5]

References