X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214241309022

Well Details

Well ID: 0214241309022
Loading map...
Location: 02/09-13-021-24W4/2
Location Alias: 02/09-13-21-24 W4M
Location Alias 2: 02/09-13-021-24 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 24
Section: 13
County/Municipality: Siksika 146
Well Name: ECA HERRON 16-13-21-24
Operator Name: Ovintiv Canada ULC
License Number: 0188710
License Date: 1996-06-14
License Status: Amended
Spud Date: 1996-06-30
Final Drill Date: 1996-07-15
Well Total Depth: 1630.00 m
Surface Hole Latitude: 50.788510
Surface Hole Longitude: -113.192390

For data sources see[1][2]

Well History

Date Event
1996-06-14 Obtained License
1996-07-01 Surface Casing Operation Performed
1996-07-10 Direction Drilling Operation Performed - Deviate
1996-07-15 Finished Drilling
1996-07-15 Well Log Performed
1996-07-15 Well Mode changed to Drilled and Cased
1996-07-16 Well Log Performed
1996-07-17 Production Casing Operation Performed
1996-07-17 Rig Released
1996-07-26 Well Log Performed
1996-07-27 Perforation Treatment Performed - Jet Perforation
1996-07-27 Well Log Performed
1996-07-28 Perforation Treatment Performed - Jet Perforation
1996-07-28 Well Log Performed
1996-08-07 Perforation Treatment Performed - Remedial Casing
1996-08-11 Perforation Treatment Performed - Jet Perforation
1996-08-11 Well Log Performed
1996-08-12 Perforation Treatment Performed - Jet Perforation
1996-08-12 Well Log Performed
1996-09-01 Well Began Production
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Flowing
1997-11-28 Well Fluid changed to Crude Oil
1997-11-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-10 816.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-27 Perforation 508.00 509.00 14
1996-07-28 Perforation 265.50 266.50 14
1996-07-28 Perforation 278.00 279.00 14
1996-08-07 Remedial Casing Cementing 508.00 509.00 0
1996-08-07 Remedial Casing Cementing 265.50 279.00 0
1996-08-11 Perforation 1579.00 1580.00 14
1996-08-12 Perforation 1575.00 1577.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2816 0.0 0.0 0.0
1997 6165 0.0 0.0 0.0
1998 5936 0.0 0.0 0.0
1999 2824 0.0 0.0 0.0
2000 2245 0.0 0.0 0.0
2001 4475 0.0 0.0 0.0
2002 2180 0.0 0.0 0.0
2003 2439 0.0 0.0 0.0
2004 2508 0.0 0.0 0.0
2005 8542 0.0 0.0 0.0
2006 8335 0.0 0.0 0.0
2007 8702 0.0 0.0 0.0
2008 8301 0.0 0.0 0.0
2009 8114 0.0 0.0 0.0
2010 7687 0.0 0.0 0.0
2011 8709 0.0 0.0 0.0
2012 8459 0.0 0.0 0.0
2013 8248 0.0 0.0 0.0
2014 8153 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8472 0.0 0.0 0.0
2019 8544 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References