X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224092404000

Well Details

Well ID: 0224092404000
Loading map...
Location: 00/04-24-022-09W4/0
Location Alias: 00/04-24-22-09 W4M
Location Alias 2: 00/04-24-022-09 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 09
Section: 24
County/Municipality: Special Areas No. 2
Well Name: RENAISSANCE 4D JENNER 4-24-22-9
Operator Name: Husky Oil Operations Limited
License Number: 0184193
License Date: 1996-01-05
License Status: RecCertified
Spud Date: 1996-01-07
Final Drill Date: 1996-01-11
Well Total Depth: 1144.00 m
Surface Hole Latitude: 50.879647
Surface Hole Longitude: -111.124426

For data sources see[1][2]

Well History

Date Event
1996-01-05 Obtained License
1996-01-07 Well Log Performed
1996-01-08 Surface Casing Operation Performed
1996-01-09 Direction Drilling Operation Performed - Deviate
1996-01-11 Finished Drilling
1996-01-11 Well Log Performed
1996-01-11 Well Mode changed to Drilled and Cased
1996-01-12 Production Casing Operation Performed
1996-01-12 Rig Released
1996-01-17 Well Log Performed
1996-01-22 Well Log Performed
1996-01-23 Well Log Performed
1996-01-24 Perforation Treatment Performed - Jet Perforation
1996-02-07 Well Began Production
1996-02-07 Well Fluid changed to Gas
1996-02-07 Well Mode changed to Flowing
1996-04-08 Perforation Treatment Performed - Cement Squeeze
1996-04-08 Plug Back Performed
1996-04-11 Perforation Treatment Performed - Jet Perforation
1996-04-11 Well Fluid changed to Gas
1996-04-11 Well Mode changed to Suspended
1996-04-13 Perforation Treatment Performed - Jet Perforation
1996-04-13 Well Log Performed
1996-04-15 Well Fluid changed to Gas
1996-04-15 Well Mode changed to Suspended
1997-10-28 Well Fluid changed to Gas
1997-10-28 Well Mode changed to Flowing
1999-08-11 Well Fluid changed to Gas
1999-08-11 Well Mode changed to Suspended
2011-09-28 Perforation Treatment Performed - Cement Squeeze
2011-09-28 Plug Back Performed
2011-09-29 Well Log Performed
2011-09-30 Perforation Treatment Performed - Jet Perforation
2011-09-30 Well Fluid changed to Gas
2011-09-30 Well Mode changed to Abandoned Zone
2011-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-03 Perforation Treatment Performed - Remedial Casing
2011-10-03 Plug Back Performed
2011-10-04 Perforation Treatment Performed - Jet Perforation
2011-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-07 Perforation Treatment Performed - Remedial Casing
2011-10-08 Perforation Treatment Performed - Jet Perforation
2011-10-09 Perforation Treatment Performed - Remedial Casing
2011-10-12 Perforation Treatment Performed - Jet Perforation
2011-10-12 Well Log Performed
2011-10-14 Perforation Treatment Performed - Remedial Casing
2011-10-20 Perforation Treatment Performed - Jet Perforation
2011-10-20 Well Log Performed
2011-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-21 Perforation Treatment Performed - Remedial Casing
2011-12-08 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-01-09 255.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-24 Perforation 1106.00 1106.50 14
2011-10-07 Remedial Casing Cementing 295.00 298.00 0
2011-10-07 Packing Device Capped w/Cement 270.00 290.00 0
2011-10-08 Perforation 200.00 203.00 99
2011-10-09 Remedial Casing Cementing 200.00 203.00 0
2011-10-12 Perforation 199.10 200.00 99
2011-10-14 Remedial Casing Cementing 199.10 200.00 0
2011-10-20 Perforation 185.00 186.10 99
2011-10-20 Perforation 185.00 187.00 20
2011-10-21 Remedial Casing Cementing 185.00 187.00 0
2011-10-21 Packing Device Capped w/Cement 174.00 182.00 0
1996-04-08 Cement Squeeze 1106.00 1106.50 0
1996-04-11 Perforation 1103.00 1104.00 14
1996-04-13 Perforation 1095.00 1096.00 14
2011-09-28 Cement Squeeze 1095.00 1096.00 0
2011-09-30 Perforation 357.00 360.00 20
2011-10-03 Remedial Casing Cementing 357.00 360.00 0
2011-10-03 Packing Device Capped w/Cement 330.00 350.00 0
2011-10-04 Perforation 295.00 298.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 342 0.0 0.0 0.0
1997 34 0.0 0.0 0.0

For data sources see[6]

References