X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0225060911000

Well Details

Well ID: 0225060911000
Loading map...
Location: 00/11-09-022-06W5/0
Location Alias: 00/11-09-22-06 W5M
Location Alias 2: 00/11-09-022-06 W5/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 5
Range: 06
Section: 09
County/Municipality: Kananaskis Improvement District
Well Name: HUSKY MOOSE 11-9-22-6
Operator Name: Husky Oil Operations Limited
License Number: 0276104
License Date: 2002-11-18
License Status: Suspension
Spud Date: 2002-12-08
Final Drill Date: 2010-03-06
Well Total Depth: 2355.40 m
Surface Hole Latitude: 50.861700
Surface Hole Longitude: -114.766934

For data sources see[1][2]

Well History

Date Event
2002-11-18 Obtained License
2002-12-17 Surface Casing Operation Performed
2002-12-21 Direction Drilling Operation Performed - Deviate
2003-01-18 Well Log Performed
2003-01-18 Well Mode changed to Drilled and Cased
2003-01-19 Well Log Performed
2003-01-22 Production Casing Operation Performed
2003-01-25 Rig Released
2003-02-25 Well Log Performed
2003-02-27 Perforation Treatment Performed - Jet Perforation
2003-02-27 Well Log Performed
2003-02-28 Perforation Treatment Performed - Jet Perforation
2003-03-01 Perforation Treatment Performed - Jet Perforation
2003-03-02 Well Log Performed
2003-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-14 Well Log Performed
2003-03-17 Well Fluid changed to Gas
2003-03-17 Well Mode changed to Testing
2003-04-03 Well Log Performed
2003-06-25 Well Began Production
2003-06-25 Well Fluid changed to Gas
2003-06-25 Well Mode changed to Flowing
2006-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-01 Well Fluid changed to Gas
2007-02-01 Well Mode changed to Suspended
2010-03-01 Perforation Treatment Performed - Jet Perforation
2010-03-06 Finished Drilling
2010-03-07 Well Log Performed
2010-03-08 Liner Casing Operation Performed
2010-03-09 Perforation Treatment Performed - Cement Squeeze
2010-03-13 Well Log Performed
2010-03-14 Perforation Treatment Performed - Jet Perforation
2010-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-26 Perforation Treatment Performed - Jet Perforation
2010-03-27 Perforation Treatment Performed - Jet Perforation
2010-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-09 Well Log Performed
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Flowing
2015-10-02 Well Fluid changed to Gas
2015-10-02 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-12-21 493.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-27 Perforation 2209.00 2215.00 13
2003-03-01 Perforation 2123.00 2126.00 14
2003-03-01 Perforation 2117.00 2119.00 14
2003-03-01 Perforation 2110.00 2116.00 14
2003-03-01 Perforation 2102.00 2109.00 14
2003-03-01 Perforation 2095.00 2101.00 14
2003-03-03 Acid Treatment 2209.00 2215.00 0
2003-03-03 Acid Treatment 2166.00 2215.00 0
2003-03-10 Acid Treatment 2133.00 2146.00 0
2006-09-23 Packing Device Capped w/Cement 2060.20 2074.80 0
2010-03-01 Perforation 2095.00 2101.00 14
2003-02-28 Perforation 2202.00 2208.00 14
2010-03-01 Perforation 2102.00 2109.00 14
2010-03-01 Perforation 2110.00 2116.00 14
2010-03-01 Perforation 2117.00 2119.00 14
2010-03-01 Perforation 2123.00 2126.00 14
2010-03-01 Perforation 2133.00 2139.00 14
2010-03-01 Perforation 2140.00 2146.00 14
2010-03-01 Perforation 2147.00 2152.00 14
2010-03-01 Perforation 2153.00 2158.00 14
2010-03-01 Perforation 2159.00 2165.00 14
2010-03-01 Perforation 2166.00 2172.00 14
2003-02-28 Perforation 2195.00 2201.00 14
2010-03-01 Perforation 2195.00 2201.00 14
2010-03-01 Perforation 2202.00 2208.00 14
2010-03-01 Perforation 2209.00 2215.00 13
2010-03-09 Cement Squeeze 2095.00 2215.00 0
2010-03-14 Perforation 2302.00 2307.00 13
2010-03-14 Perforation 2307.00 2313.00 13
2010-03-14 Perforation 2297.00 2302.00 13
2010-03-16 Acid Treatment 2297.00 2313.00 0
2010-03-26 Perforation 2210.00 2215.00 13
2010-03-26 Perforation 2205.00 2210.00 13
2003-02-28 Perforation 2166.00 2172.00 14
2010-03-26 Perforation 2200.00 2205.00 13
2010-03-26 Perforation 2195.00 2200.00 13
2010-03-26 Perforation 2190.00 2195.00 13
2010-03-26 Perforation 2166.00 2172.00 13
2010-03-26 Perforation 2159.00 2165.00 13
2010-03-26 Perforation 2152.50 2158.00 13
2010-03-26 Perforation 2147.00 2152.50 13
2010-03-26 Perforation 2110.00 2116.00 13
2010-03-26 Perforation 2104.00 2109.00 13
2010-03-27 Perforation 2099.00 2103.00 13
2003-02-28 Perforation 2159.00 2165.00 14
2010-03-27 Perforation 2095.00 2099.00 13
2010-03-29 Acid Treatment 2095.00 2215.00 0
2003-02-28 Perforation 2153.00 2158.00 14
2003-02-28 Perforation 2147.00 2152.00 14
2003-02-28 Perforation 2140.00 2146.00 14
2003-03-01 Perforation 2133.00 2139.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 123 0.0 0.0 0.0
2005 1312 0.0 0.0 0.0
2006 728 0.0 0.0 0.0
2007 1 0.0 0.0 0.0
2010 1374 0.0 0.0 0.0
2011 6182 0.0 0.0 0.0
2012 4183 0.0 0.0 0.0
2014 802 0.0 0.0 0.0

For data sources see[6]

References