X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234080706000

Well Details

Well ID: 0234080706000
Loading map...
Location: 00/06-07-023-08W4/0
Location Alias: 00/06-07-23-08 W4M
Location Alias 2: 00/06-07-023-08 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 08
Section: 07
County/Municipality: Special Areas No. 3
Well Name: RENAISSANCE ATLEE-BUFFALO 6-7-23-8
Operator Name: Husky Oil Operations Limited
License Number: 0142882
License Date: 1990-01-22
License Status: RecCertified
Spud Date: 1990-02-14
Final Drill Date: 1990-02-17
Well Total Depth: 978.00 m
Surface Hole Latitude: 50.941113
Surface Hole Longitude: -111.115291

For data sources see[1][2]

Well History

Date Event
1990-01-22 Obtained License
1990-02-15 Surface Casing Operation Performed
1990-02-17 Finished Drilling
1990-02-17 Kick Occurred
1990-02-18 Well Log Performed
1990-02-19 Production Casing Operation Performed
1990-02-19 Rig Released
1990-03-13 Perforation Treatment Performed - Jet Perforation
1990-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-15 Plug Back Performed
1990-06-04 Perforation Treatment Performed - Jet Perforation
1990-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-05 Plug Back Performed
1990-06-06 Perforation Treatment Performed - Jet Perforation
1996-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-03 Plug Back Performed
1996-01-03 Well Abandoned
1996-01-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-13 Perforation 936.00 938.00 13
1990-03-13 Perforation 940.00 943.00 13
1990-03-14 Acid Treatment 936.00 943.00 0
1990-03-15 Packing Device Capped w/Cement 927.00 935.00 0
1990-06-04 Perforation 919.50 923.00 13
1990-06-05 Packing Device Capped w/Cement 913.50 918.50 0
1990-06-06 Perforation 910.00 911.50 13
1996-01-03 Packing Device Capped w/Cement 897.00 905.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-02-17 Kick 978.00 978.00

For data sources see[5]

References