X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234101011000

Well Details

Well ID: 0234101011000
Loading map...
Location: 00/11-10-023-10W4/0
Location Alias: 00/11-10-23-10 W4M
Location Alias 2: 00/11-10-023-10 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 10
Section: 10
County/Municipality: Special Areas No. 2
Well Name: TIDAL CAN CHIEF CESSFORD 11-10-23-10
Operator Name: Husky Oil Operations Limited
License Number: 0017988
License Date: 1959-10-19
License Status: RecCertified
Spud Date: 1959-10-22
Final Drill Date: 1959-11-27
Well Total Depth: 944.90 m
Surface Hole Latitude: 50.944815
Surface Hole Longitude: -111.321926

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-10-19 Obtained License
1959-10-29 Drill Stem Test Performed
1959-10-31 Blowout Occurred
1959-11-22 Production Casing Operation Performed
1959-11-27 Finished Drilling
1959-11-27 Lost Circulation Occurred
1959-11-29 Drill Stem Test Performed
1959-12-02 Perforation Treatment Performed - Open-Hole Completion
1959-12-14 Well Mode changed to Drilled and Cased
1970-10-23 Perforation Treatment Performed - Acid Wash - No Pressure
1970-10-23 Perforation Treatment Performed - Jet Perforation
1970-11-05 Perforation Treatment Performed - Cement Squeeze
1970-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-06 Perforation Treatment Performed - Jet Perforation
1970-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-07 Perforation Treatment Performed - Jet Perforation
1971-10-20 Drill Stem Test Performed
1971-10-21 Drill Stem Test Performed
1972-09-09 Well Fluid changed to Gas
1972-09-09 Well Mode changed to Testing
1972-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-09-10 Perforation Treatment Performed - Cement Squeeze
1972-09-10 Perforation Treatment Performed - Selective Jet Perforations
1972-09-10 Well Abandoned
1972-09-10 Well Fluid changed to Gas
1972-09-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-02 Open Hole/Barefoot Completion 927.80 935.70 0
1972-09-10 Selective Jet Perforations 289.60 289.60 0
1972-09-10 Cement Squeeze 289.60 289.60 0
1970-10-23 Perforation 919.90 920.80 10
1970-10-23 Acid Wash 919.90 920.80 0
1970-11-05 Cement Squeeze 919.90 920.80 0
1970-11-06 Perforation 833.90 837.00 13
1970-11-06 Acid Treatment 833.90 837.00 0
1970-11-07 Perforation 843.10 846.10 13
1970-11-07 Acid Treatment 843.10 846.10 0
1972-09-10 Packing Device Capped w/Cement 741.30 741.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 290 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1959-10-31 Blowout 922.60 922.60
1959-11-27 Lost Circulation 79.20 79.20

For data sources see[6]

References