X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244282315000

Well Details

Well ID: 0244282315000
Loading map...
Location: 00/15-23-024-28W4/0
Location Alias: 00/15-23-24-28 W4M
Location Alias 2: 00/15-23-024-28 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 28
Section: 23
County/Municipality: Rocky View County
Well Name: PCP 15B CROSSFIELD 15-23-24-28
Operator Name: Ovintiv Canada ULC
License Number: 0188375
License Date: 1996-06-05
License Status: RecCertified
Spud Date: 1996-06-18
Final Drill Date: 1996-07-26
Well Total Depth: 2510.00 m
Surface Hole Latitude: 51.072033
Surface Hole Longitude: -113.794504

For data sources see[1][2]

Well History

Date Event
1996-06-05 Obtained License
1996-06-18 Direction Drilling Operation Performed - Deviate
1996-06-21 Surface Casing Operation Performed
1996-06-29 Plug Back Performed
1996-06-30 Direction Drilling Operation Performed - Deviate
1996-07-02 Well Log Performed
1996-07-16 Plug Back Performed
1996-07-18 Direction Drilling Operation Performed - Sidetrack Fish
1996-07-26 Finished Drilling
1996-07-26 Well Log Performed
1996-07-27 Well Log Performed
1996-07-29 Production Casing Operation Performed
1996-07-29 Rig Released
1996-11-26 Well Log Performed
1996-11-30 Well Log Performed
1996-12-01 Perforation Treatment Performed - Jet Perforation
1996-12-06 Perforation Treatment Performed - Fractured
1997-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-17 Plug Back Performed
1997-09-17 Well Log Performed
1997-09-24 Well Mode changed to Abandoned
2003-11-22 Well Log Performed
2003-11-25 Well Log Performed
2004-05-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-05-22 Well Log Performed
2004-05-23 Perforation Treatment Performed - Remedial Casing
2004-05-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-05-28 Perforation Treatment Performed - Remedial Casing
2004-05-28 Well Log Performed
2004-05-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-05-30 Perforation Treatment Performed - Remedial Casing
2004-05-30 Well Log Performed
2004-05-31 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-06-01 Perforation Treatment Performed - Remedial Casing
2004-06-01 Well Log Performed
2004-06-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-06-03 Perforation Treatment Performed - Remedial Casing
2004-06-03 Well Log Performed
2006-06-01 Perforation Treatment Performed - Jet Perforation
2006-06-01 Well Log Performed
2006-06-02 Well Log Performed
2006-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-03 Perforation Treatment Performed - Jet Perforation
2006-06-03 Well Log Performed
2006-06-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2006-06-06 Perforation Treatment Performed - Cement Squeeze
2006-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-01 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-18 0.00 Deviate (5 - 79 degrees)
1996-06-30 1453.00 Deviate (5 - 79 degrees)
1996-07-18 1995.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-01 Perforation 2469.00 2472.00 20
2004-05-31 Hydra Jet Perforation 930.00 934.00 1
2004-06-01 Remedial Casing Cementing 930.00 934.00 0
2004-06-02 Hydra Jet Perforation 911.00 915.00 1
2004-06-03 Remedial Casing Cementing 911.00 915.00 0
2006-06-01 Perforation 689.00 690.00 17
2006-06-01 Perforation 688.00 689.00 17
2006-06-01 Perforation 687.00 688.00 17
2006-06-03 Packing Device Capped w/Cement 667.80 679.80 0
2006-06-03 Perforation 500.00 501.00 17
2006-06-03 Perforation 499.00 500.00 17
1996-12-06 Fracture 2469.00 2472.00 0
2006-06-03 Perforation 498.00 499.00 17
2006-06-05 Hydra Jet Perforation 498.00 502.00 1
2006-06-06 Cement Squeeze 498.00 502.00 0
2006-06-19 Packing Device Capped w/Cement 431.50 504.80 0
1997-09-17 Packing Device Capped w/Cement 2438.00 2446.00 0
2004-05-21 Hydra Jet Perforation 1164.00 1168.00 1
2004-05-23 Remedial Casing Cementing 1164.00 1168.00 0
2004-05-24 Hydra Jet Perforation 1133.00 1137.00 1
2004-05-28 Remedial Casing Cementing 1133.00 1137.00 0
2004-05-29 Hydra Jet Perforation 1084.00 1088.00 1
2004-05-30 Remedial Casing Cementing 1084.00 1088.00 0

For data sources see[5]



References