X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244292711000

Well Details

Well ID: 0244292711000
Loading map...
Location: 00/11-27-024-29W4/0
Location Alias: 00/11-27-24-29 W4M
Location Alias 2: 00/11-27-024-29 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 29
Section: 27
County/Municipality: Calgary
Well Name: JEFFERSON LAKE CPR CALGARY 27-11
Operator Name: CNOOC Petroleum North America ULC
License Number: 0013235
License Date: 1957-03-22
License Status: RecCertified
Spud Date: 1957-03-28
Final Drill Date: 1957-05-29
Well Total Depth: 2696.90 m
Surface Hole Latitude: 51.076078
Surface Hole Longitude: -113.972225

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-22 Obtained License
1957-04-12 Drill Stem Test Performed
1957-05-05 Drill Stem Test Performed
1957-05-29 Finished Drilling
1957-05-29 Well Mode changed to Drilled and Cased
1957-05-31 Drill Stem Test Performed
1957-06-03 Production Casing Operation Performed
1957-06-05 Perforation Treatment Performed - Bullet Perforation
1957-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-06-27 Perforation Treatment Performed - Cement Plug
1957-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-05 Drill Stem Test Performed
1957-07-05 Perforation Treatment Performed - Selective Bullet Perforations
1957-07-07 Perforation Treatment Performed - Cement Plug
1957-07-09 Drill Stem Test Performed
1957-07-09 Perforation Treatment Performed - Selective Bullet Perforations
1957-07-10 Drill Stem Test Performed
1957-07-10 Perforation Treatment Performed - Bullet Perforation
1957-07-11 Perforation Treatment Performed - Cement Squeeze
1957-07-12 Perforation Treatment Performed - Bullet Perforation
1957-07-13 Drill Stem Test Performed
1957-07-14 Drill Stem Test Performed
1957-07-14 Perforation Treatment Performed - Bullet Perforation
1957-07-15 Perforation Treatment Performed - Bullet Perforation
1957-07-15 Perforation Treatment Performed - Cement Squeeze
1957-07-15 Perforation Treatment Performed - Selective Bullet Perforations
1957-07-20 Perforation Treatment Performed - Bullet Perforation
1957-07-22 Drill Stem Test Performed
1957-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-08-27 Perforation Treatment Performed - Cement Plug
1969-08-28 Well Fluid changed to Gas
1969-08-28 Well Mode changed to Testing
1969-08-29 Well Fluid changed to Gas
1969-08-29 Well Mode changed to Abandoned Zone
1970-04-06 Perforation Treatment Performed - Jet Perforation
1970-04-11 Perforation Treatment Performed - Acid Wash - No Pressure
1970-04-11 Perforation Treatment Performed - Fractured
1980-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-06-05 Bullet Perforation 2656.00 2693.20 13
1957-07-11 Cement Squeeze 2227.80 2250.30 0
1957-07-12 Bullet Perforation 2247.00 2250.00 13
1957-07-14 Bullet Perforation 2267.70 2270.80 13
1957-07-15 Bullet Perforation 2267.70 2270.80 13
1957-07-15 Selective Bullet Perforations 2271.40 2271.40 0
1957-07-15 Bullet Perforation 2247.00 2250.00 13
1957-07-15 Cement Squeeze 2232.10 2270.80 0
1957-07-20 Bullet Perforation 2654.50 2667.90 13
1957-07-24 Acid Treatment 2653.30 2667.90 0
1969-08-27 Cement Plug 2546.60 2616.70 0
1957-06-13 Acid Treatment 2656.00 2693.20 0
1970-04-06 Perforation 2267.70 2273.80 7
1970-04-11 Acid Wash 2267.70 2273.80 0
1970-04-11 Fracture 2267.70 2273.80 0
1980-08-08 Packing Device Capped w/Cement 2232.00 2240.00 0
1957-06-27 Cement Plug 2681.00 2687.40 0
1957-06-29 Acid Treatment 2656.00 2681.00 0
1957-07-02 Acid Treatment 2656.00 2681.00 0
1957-07-05 Selective Bullet Perforations 2619.80 2619.80 0
1957-07-07 Cement Plug 2667.00 2681.30 0
1957-07-09 Selective Bullet Perforations 2240.90 2240.90 0
1957-07-10 Bullet Perforation 2235.40 2239.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References