X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254280301002

Well Details

Well ID: 0254280301002
Loading map...
Location: 00/01-03-025-28W4/2
Location Alias: 00/01-03-25-28 W4M
Location Alias 2: 00/01-03-025-28 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 28
Section: 03
County/Municipality: Rocky View County
Well Name: WASCANA ET AL CROSSFIELD 1-3-25-28
Operator Name: CNOOC Petroleum North America ULC
License Number: 0146680
License Date: 1990-12-04
License Status: Abandoned
Spud Date: 1990-12-15
Final Drill Date: 1997-09-07
Well Total Depth: 3362.30 m
Surface Hole Latitude: 51.107570
Surface Hole Longitude: -113.823930

For data sources see[1][2]

Well History

Date Event
1990-12-04 Obtained License
1990-12-20 Surface Casing Operation Performed
1991-01-07 Direction Drilling Operation Performed - Horizontal
1991-02-11 Intermediate Casing Operation Performed
1997-08-11 Direction Drilling Operation Performed - Horizontal
1997-09-07 Finished Drilling
1997-09-07 Well Log Performed
1997-09-07 Well Mode changed to Drilled and Cased
1997-09-11 Liner Casing Operation Performed
1997-09-12 Rig Released
1997-09-17 Well Log Performed
1997-09-25 Perforation Treatment Performed - Chemical Squeeze
1997-09-25 Perforation Treatment Performed - Open-Hole Completion
1997-12-19 Well Began Production
1997-12-19 Well Fluid changed to Gas
1997-12-19 Well Mode changed to Flowing
2011-08-01 Well Fluid changed to Gas
2011-08-01 Well Mode changed to Suspended
2014-10-19 Well Log Performed
2014-10-20 Well Log Performed
2014-10-21 Well Log Performed
2014-10-22 Well Log Performed
2014-10-23 Perforation Treatment Performed - Cement Plug
2014-10-23 Plug Back Performed
2014-10-23 Well Fluid changed to Gas
2014-10-23 Well Mode changed to Abandoned Zone
2014-10-25 Perforation Treatment Performed - Cement Plug
2014-10-25 Plug Back Performed
2014-10-25 Well Log Performed
2014-10-26 Perforation Treatment Performed - Jet Perforation
2014-10-26 Well Log Performed
2014-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-10-27 Well Log Performed
2014-10-28 Perforation Treatment Performed - Cement Plug
2014-10-28 Perforation Treatment Performed - Cement Squeeze
2014-10-28 Plug Back Performed
2014-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-10-29 Perforation Treatment Performed - Jet Perforation
2014-10-29 Well Log Performed
2014-10-30 Well Log Performed
2014-10-31 Perforation Treatment Performed - Cement Plug
2014-10-31 Plug Back Performed
2014-10-31 Well Log Performed
2014-11-01 Perforation Treatment Performed - Cement Plug
2014-11-01 Perforation Treatment Performed - Cement Squeeze
2014-11-01 Perforation Treatment Performed - Jet Perforation
2014-11-01 Plug Back Performed
2014-11-01 Well Log Performed
2014-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-02 Well Log Performed
2014-11-03 Perforation Treatment Performed - Cement Plug
2014-11-03 Perforation Treatment Performed - Cement Squeeze
2014-11-03 Plug Back Performed
2014-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-04 Perforation Treatment Performed - Jet Perforation
2014-11-04 Well Log Performed
2014-11-05 Perforation Treatment Performed - Cement Plug
2014-11-05 Perforation Treatment Performed - Cement Squeeze
2014-11-05 Plug Back Performed
2014-11-05 Well Log Performed
2015-07-03 Well Abandoned
2015-07-03 Well Fluid changed to Gas
2015-07-03 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-01-07 1973.00 Horizontal
1997-08-11 1985.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-25 Open Hole/Barefoot Completion 2502.00 3362.30 0
2014-10-29 Perforation 910.00 914.00 17
2014-10-29 Acid Treatment 910.00 914.00 0
2014-10-31 Cement Plug 918.00 926.00 0
2014-11-01 Cement Squeeze 910.00 914.00 0
2014-11-01 Cement Plug 905.00 914.00 0
2014-11-01 Cement Plug 875.00 904.00 0
2014-11-01 Perforation 809.00 813.00 17
2014-11-02 Acid Treatment 809.00 813.00 0
2014-11-03 Cement Squeeze 809.00 813.00 0
2014-11-03 Cement Plug 803.00 813.00 0
1997-09-25 Chemical Squeeze 2502.00 3362.00 0
2014-11-03 Cement Plug 788.00 802.00 0
2014-11-04 Perforation 390.00 394.00 17
2014-11-04 Acid Treatment 390.00 394.00 0
2014-11-05 Cement Squeeze 390.00 394.00 0
2014-11-05 Cement Plug 385.00 394.00 0
2014-11-05 Cement Plug 373.00 384.00 0
2014-10-23 Cement Plug 2244.00 2380.00 0
2014-10-23 Cement Plug 1308.00 1886.00 0
2014-10-25 Cement Plug 984.00 1055.00 0
2014-10-26 Perforation 929.00 933.00 17
2014-10-27 Acid Treatment 929.00 933.00 0
2014-10-28 Cement Squeeze 929.00 933.00 0
2014-10-28 Cement Plug 927.00 933.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 543 0.0 0.0 0.0
1998 7954 0.0 0.0 0.0
1999 8522 0.0 0.0 0.0
2000 8777 0.0 0.0 0.0
2001 5988 0.0 0.0 0.0
2002 7998 0.0 0.0 0.0
2003 8494 0.0 0.0 0.0
2004 7864 0.0 0.0 0.0
2005 8619 0.0 0.0 0.0
2006 8702 0.0 0.0 0.0
2007 6506 0.0 0.0 0.0
2008 8432 0.0 0.0 0.0
2009 8389 0.0 0.0 0.0
2010 8437 0.0 0.0 0.0
2011 2769 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References