X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254291111000

Well Details

Well ID: 0254291111000
Loading map...
Location: 00/11-11-025-29W4/0
Location Alias: 00/11-11-25-29 W4M
Location Alias 2: 00/11-11-025-29 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 29
Section: 11
County/Municipality: Calgary
Well Name: WASCANA CPR N CALG 11-11-25-29
Operator Name: CNOOC Petroleum North America ULC
License Number: 0014465
License Date: 1957-12-18
License Status: Abandoned
Spud Date: 1957-12-22
Final Drill Date: 1958-02-28
Well Total Depth: 2690.80 m
Surface Hole Latitude: 51.120060
Surface Hole Longitude: -113.950238

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-12-18 Obtained License
1958-01-13 Drill Stem Test Performed
1958-01-15 Drill Stem Test Performed
1958-01-16 Drill Stem Test Performed
1958-01-18 Drill Stem Test Performed
1958-02-03 Drill Stem Test Performed
1958-02-07 Drill Stem Test Performed
1958-02-10 Production Casing Operation Performed
1958-02-12 Perforation Treatment Performed - Bullet Perforation
1958-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-27 Drill Stem Test Performed
1958-02-28 Finished Drilling
1958-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-03-02 Drill Stem Test Performed
1958-03-02 Perforation Treatment Performed - Bullet Perforation
1958-03-03 Perforation Treatment Performed - Bullet Perforation
1958-03-03 Perforation Treatment Performed - Cement Squeeze
1958-03-04 Perforation Treatment Performed - Cement Plug
1958-03-08 Perforation Treatment Performed - Jet Perforation
1958-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-03-14 Well Mode changed to Drilled and Cased
1961-11-26 Well Began Production
1961-11-26 Well Fluid changed to Gas
1961-11-26 Well Mode changed to Flowing
2006-05-31 Well Fluid changed to Gas
2006-05-31 Well Mode changed to Suspended
2006-06-05 Perforation Treatment Performed - Cement Plug
2006-06-05 Plug Back Performed
2006-06-05 Well Fluid changed to Gas
2006-06-05 Well Mode changed to Abandoned Zone
2006-06-22 Well Log Performed
2006-06-24 Perforation Treatment Performed - Jet Perforation
2006-06-25 Perforation Treatment Performed - Cement Plug
2006-06-28 Perforation Treatment Performed - Jet Perforation
2006-06-30 Perforation Treatment Performed - Remedial Casing
2006-07-01 Perforation Treatment Performed - Cement Plug
2006-07-03 Perforation Treatment Performed - Jet Perforation
2006-07-03 Well Log Performed
2006-07-05 Perforation Treatment Performed - Jet Perforation
2006-07-05 Well Log Performed
2006-07-06 Perforation Treatment Performed - Cement Plug
2006-07-06 Perforation Treatment Performed - Remedial Casing
2006-07-07 Perforation Treatment Performed - Jet Perforation
2006-07-07 Well Log Performed
2006-07-08 Well Log Performed
2006-07-10 Perforation Treatment Performed - Cement Plug
2006-07-10 Perforation Treatment Performed - Remedial Casing
2006-12-11 Well Abandoned
2006-12-11 Well Fluid changed to Gas
2006-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-02-12 Bullet Perforation 2647.50 2653.60 20
1958-03-08 Perforation 2267.40 2279.60 13
1958-03-09 Acid Treatment 2267.40 2279.60 0
2006-06-05 Cement Plug 2252.70 2278.90 0
2006-06-24 Perforation 2107.00 2109.00 13
2006-06-25 Cement Plug 2074.60 2250.00 0
2006-06-28 Perforation 1148.00 1150.00 13
2006-06-28 Perforation 848.00 850.00 13
2006-06-30 Remedial Casing Cementing 1148.00 1150.00 0
2006-07-01 Cement Plug 810.50 1143.00 0
2006-07-03 Perforation 492.00 494.00 13
1958-02-16 Acid Treatment 2647.50 2653.60 0
2006-07-05 Perforation 433.00 435.00 13
2006-07-06 Remedial Casing Cementing 492.00 494.00 0
2006-07-06 Remedial Casing Cementing 433.00 435.00 0
2006-07-06 Cement Plug 425.90 482.00 0
2006-07-07 Perforation 387.00 389.00 13
2006-07-07 Perforation 284.00 286.00 13
2006-07-10 Remedial Casing Cementing 387.00 389.00 0
2006-07-10 Remedial Casing Cementing 284.00 286.00 0
2006-07-10 Cement Plug 55.50 384.00 0
1958-02-17 Acid Treatment 2647.50 2653.60 0
1958-03-01 Packing Device Capped w/Cement 2672.50 2673.10 0
1958-03-02 Bullet Perforation 2667.60 2671.30 20
1958-03-03 Cement Squeeze 2647.50 2653.60 0
1958-03-03 Cement Squeeze 2672.50 2673.10 0
1958-03-03 Bullet Perforation 2290.30 2290.60 16
1958-03-04 Cement Plug 2280.50 2284.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1419 0.0 0.0 0.0
1969 7669 0.0 0.0 0.0
1970 8338 0.0 0.0 0.0
1971 7799 0.0 0.0 0.0
1972 8560 0.0 0.0 0.0
1973 8488 0.0 0.0 0.0
1974 7844 0.0 0.0 0.0
1975 7995 0.0 0.0 0.0
1976 7584 0.0 0.0 0.0
1977 7830 0.0 0.0 0.0
1978 7507 0.0 0.0 0.0
1979 8491 0.0 0.0 0.0
1980 7309 0.0 0.0 0.0
1981 6139 0.0 0.0 0.0
1982 4603 0.0 0.0 0.0
1983 5999 0.0 0.0 0.0
1984 7356 0.0 0.0 0.0
1985 8577 0.0 0.0 0.0
1986 5991 0.0 0.0 0.0
1987 8717 0.0 0.0 0.0
1988 8570 0.0 0.0 0.0
1989 8623 0.0 0.0 0.0
1990 8502 0.0 0.0 0.0
1991 8029 0.0 0.0 0.0
1992 8163 0.0 0.0 0.0
1993 8514 0.0 0.0 0.0
1994 8321 0.0 0.0 0.0
1995 8664 0.0 0.0 0.0
1996 7855 0.0 0.0 0.0
1997 8159 0.0 0.0 0.0
1998 6542 0.0 0.0 0.0
1999 6287 0.0 0.0 0.0
2000 8402 0.0 0.0 0.0
2001 8508 0.0 0.0 0.0
2002 5520 0.0 0.0 0.0
2003 6298 0.0 0.0 0.0
2004 8572 0.0 0.0 0.0
2005 8614 0.0 0.0 0.0
2006 3180 0.0 0.0 0.0

For data sources see[5]

References