If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254292311002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.148794,"lon":-113.94961,"icon":""}]} |
Location: 00/11-23-025-29W4/2 | |
Location Alias: 00/11-23-25-29 W4M | |
Location Alias 2: 00/11-23-025-29 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 29 | |
Section: 23 | |
County/Municipality: Calgary | |
Well Name: WASCANA CPR CROSS 11-23-25-29 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0023180 | |
License Date: 1962-10-18 | |
License Status: Abandoned | |
Spud Date: 1962-10-28 | |
Final Drill Date: 1962-12-11 | |
Well Total Depth: 2694.40 m | |
Surface Hole Latitude: 51.148794 | |
Surface Hole Longitude: -113.949610 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-10-18 | Obtained License |
1962-11-24 | Drill Stem Test Performed |
1962-11-25 | Drill Stem Test Performed |
1962-12-11 | Finished Drilling |
1962-12-11 | Well Mode changed to Drilled and Cased |
1962-12-12 | Drill Stem Test Performed |
1962-12-15 | Perforation Treatment Performed - Permeator Perforation |
1962-12-16 | Production Casing Operation Performed |
1962-12-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-01-27 | Perforation Treatment Performed - Cement Squeeze |
1963-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-11-14 | Perforation Treatment Performed - Cement Plug |
1963-11-16 | Perforation Treatment Performed - Jet Perforation |
1963-12-09 | Well Began Production |
1963-12-09 | Well Fluid changed to Gas |
1963-12-09 | Well Mode changed to Flowing |
2010-10-07 | Well Fluid changed to Gas |
2010-10-07 | Well Mode changed to Suspended |
2012-11-04 | Perforation Treatment Performed - Cement Squeeze |
2012-11-04 | Plug Back Performed |
2012-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-11-05 | Plug Back Performed |
2012-11-05 | Well Fluid changed to Gas |
2012-11-05 | Well Log Performed |
2012-11-05 | Well Mode changed to Abandoned Zone |
2012-11-08 | Perforation Treatment Performed - Jet Perforation |
2012-11-09 | Well Log Performed |
2012-11-10 | Perforation Treatment Performed - Cement Plug |
2012-11-10 | Plug Back Performed |
2013-09-24 | Well Abandoned |
2013-09-24 | Well Fluid changed to Gas |
2013-09-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-12-15 | Permeator Perforation | 2649.90 | 2660.30 | 10 |
2012-11-05 | Packing Device Capped w/Cement | 2194.00 | 2210.00 | 0 |
2012-11-08 | Perforation | 472.00 | 476.00 | 17 |
2012-11-10 | Cement Plug | 426.60 | 496.20 | 0 |
1962-12-15 | Permeator Perforation | 2663.60 | 2672.80 | 10 |
1962-12-19 | Acid Treatment | 2649.90 | 2672.80 | 0 |
1963-01-20 | Acid Treatment | 2649.90 | 2672.80 | 0 |
1963-01-27 | Cement Squeeze | 2663.60 | 2672.80 | 0 |
1963-02-03 | Acid Treatment | 2649.90 | 2660.30 | 0 |
1963-11-14 | Cement Plug | 2633.50 | 2642.60 | 0 |
1963-11-16 | Perforation | 2231.10 | 2241.80 | 10 |
2012-11-04 | Cement Squeeze | 2231.10 | 2241.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1432 | 0.0 | 0.0 | 0.0 |
1969 | 5867 | 0.0 | 0.0 | 0.0 |
1970 | 7636 | 0.0 | 0.0 | 0.0 |
1971 | 8141 | 0.0 | 0.0 | 0.0 |
1972 | 7786 | 0.0 | 0.0 | 0.0 |
1973 | 8496 | 0.0 | 0.0 | 0.0 |
1974 | 7653 | 0.0 | 0.0 | 0.0 |
1975 | 8726 | 0.0 | 0.0 | 0.0 |
1976 | 8590 | 0.0 | 0.0 | 0.0 |
1977 | 8641 | 0.0 | 0.0 | 0.0 |
1978 | 8112 | 0.0 | 0.0 | 0.0 |
1979 | 8694 | 0.0 | 0.0 | 0.0 |
1980 | 8437 | 0.0 | 0.0 | 0.0 |
1981 | 7065 | 0.0 | 0.0 | 0.0 |
1982 | 6404 | 0.0 | 0.0 | 0.0 |
1983 | 5411 | 0.0 | 0.0 | 0.0 |
1984 | 8428 | 0.0 | 0.0 | 0.0 |
1985 | 8639 | 0.0 | 0.0 | 0.0 |
1986 | 8527 | 0.0 | 0.0 | 0.0 |
1987 | 8758 | 0.0 | 0.0 | 0.0 |
1988 | 8622 | 0.0 | 0.0 | 0.0 |
1989 | 8638 | 0.0 | 0.0 | 0.0 |
1990 | 8536 | 0.0 | 0.0 | 0.0 |
1991 | 7957 | 0.0 | 0.0 | 0.0 |
1992 | 8377 | 0.0 | 0.0 | 0.0 |
1993 | 8649 | 0.0 | 0.0 | 0.0 |
1994 | 8337 | 0.0 | 0.0 | 0.0 |
1995 | 8743 | 0.0 | 0.0 | 0.0 |
1996 | 8393 | 0.0 | 0.0 | 0.0 |
1997 | 8662 | 0.0 | 0.0 | 0.0 |
1998 | 8022 | 0.0 | 0.0 | 0.0 |
1999 | 8142 | 0.0 | 0.0 | 0.0 |
2000 | 8611 | 0.0 | 0.0 | 0.0 |
2001 | 8587 | 0.0 | 0.0 | 0.0 |
2002 | 7752 | 0.0 | 0.0 | 0.0 |
2003 | 8527 | 0.0 | 0.0 | 0.0 |
2004 | 8505 | 0.0 | 0.0 | 0.0 |
2005 | 8693 | 0.0 | 0.0 | 0.0 |
2006 | 8487 | 0.0 | 0.0 | 0.0 |
2007 | 7097 | 0.0 | 0.0 | 0.0 |
2008 | 8403 | 0.0 | 0.0 | 0.0 |
2009 | 8302 | 0.0 | 0.0 | 0.0 |
2010 | 3782 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]