X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264120605000

Well Details

Well ID: 0264120605000
Loading map...
Location: 00/05-06-026-12W4/0
Location Alias: 00/05-06-26-12 W4M
Location Alias 2: 00/05-06-026-12 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 12
Section: 06
County/Municipality: Special Areas No. 2
Well Name: HUSKY CESS 5-6-26-12
Operator Name: Husky Oil Operations Limited
License Number: 0086505
License Date: 1980-10-22
License Status: RecCertified
Spud Date: 1980-10-23
Final Drill Date: 1980-11-03
Well Total Depth: 1036.60 m
Surface Hole Latitude: 51.189795
Surface Hole Longitude: -111.677834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-22 Obtained License
1980-11-03 Finished Drilling
1980-11-03 Well Log Performed
1980-11-03 Well Mode changed to Drilled and Cased
1980-11-04 Production Casing Operation Performed
1980-11-04 Well Began Production
1980-11-04 Well Fluid changed to Crude Oil
1980-11-04 Well Mode changed to Pumping
1980-11-10 Perforation Treatment Performed - Open-Hole Completion
1980-11-13 Perforation Treatment Performed - Cement Plug
1980-11-14 Perforation Treatment Performed - Jet Perforation
1982-11-25 Well Fluid changed to Crude Oil
1982-11-25 Well Mode changed to Suspended
1986-08-01 Well Fluid changed to Crude Oil
1986-08-01 Well Mode changed to Pumping
1991-08-26 Well Fluid changed to Crude Oil
1991-08-26 Well Mode changed to Suspended
2002-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-05 Plug Back Performed
2002-07-05 Well Fluid changed to Crude Oil
2002-07-05 Well Mode changed to Abandoned Zone
2002-07-06 Well Abandoned
2002-07-06 Well Fluid changed to Crude Oil
2002-07-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-10 Open Hole/Barefoot Completion 1034.00 1036.60 0
1980-11-13 Cement Plug 1034.00 1036.60 0
1980-11-14 Perforation 1030.00 1032.00 7
2002-07-05 Packing Device Capped w/Cement 1007.00 1015.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 24 0.0 0.0 0.0
1981 2496 0.0 0.0 0.0
1986 1760 0.0 0.0 0.0
1987 4928 0.0 0.0 0.0
1988 4542 0.0 0.0 0.0
1989 3945 0.0 0.0 0.0
1990 3183 0.0 0.0 0.0
1991 3451 0.0 0.0 0.0

For data sources see[5]

References