X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264122411000

Well Details

Well ID: 0264122411000
Loading map...
Location: 00/11-24-026-12W4/0
Location Alias: 00/11-24-26-12 W4M
Location Alias 2: 00/11-24-026-12 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 12
Section: 24
County/Municipality: Special Areas No. 2
Well Name: RENAISSANCE SUNNYNOOK 11-24-26-12
Operator Name: Husky Oil Operations Limited
License Number: 0017070
License Date: 1959-05-15
License Status: Re-Entered
Spud Date: 1959-05-29
Final Drill Date: 1959-06-28
Well Total Depth: 1770.90 m
Surface Hole Latitude: 51.236071
Surface Hole Longitude: -111.554400

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-05-15 Obtained License
1959-06-05 Drill Stem Test Performed
1959-06-07 Drill Stem Test Performed
1959-06-28 Finished Drilling
1959-06-29 Drill Stem Test Performed
1959-07-01 Production Casing Operation Performed
1959-07-03 Well Mode changed to Drilled and Cased
1959-10-06 Perforation Treatment Performed - Jet Perforation
1961-01-04 Well Began Production
1961-01-04 Well Fluid changed to Gas
1961-01-04 Well Mode changed to Flowing
1970-03-31 Perforation Treatment Performed - Cement Squeeze
1970-04-02 Perforation Treatment Performed - Jet Perforation
1970-04-07 Perforation Treatment Performed - Acid Wash - No Pressure
1970-04-09 Well Fluid changed to Gas
1970-04-09 Well Mode changed to Flowing
1970-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1973-05-14 Perforation Treatment Performed - Cement Squeeze
1973-05-14 Well Fluid changed to Gas
1973-05-14 Well Mode changed to Abandoned Zone
1974-05-28 Perforation Treatment Performed - Jet Perforation
1994-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-21 Plug Back Performed
1994-07-22 Perforation Treatment Performed - Jet Perforation
1994-07-22 Perforation Treatment Performed - Remedial Casing
1994-07-22 Well Abandoned
1994-11-08 Perforation Treatment Performed - Jet Perforation
1994-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-11 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-10-06 Perforation 1029.90 1034.50 7
1970-10-13 Acid Wash 1028.40 1031.40 0
1973-05-14 Cement Squeeze 1029.90 1031.40 0
1973-05-14 Cement Squeeze 844.90 868.10 0
1974-05-28 Perforation 941.20 944.30 13
1994-07-21 Packing Device Capped w/Cement 832.00 840.00 0
1994-07-22 Perforation 499.00 500.00 13
1994-07-22 Remedial Casing Cementing 499.00 500.00 0
1994-11-08 Perforation 941.20 944.20 13
1994-11-11 Packing Device Capped w/Cement 832.00 840.00 0
1994-11-11 Packing Device Capped w/Cement 932.00 940.00 0
1970-03-31 Cement Squeeze 1029.90 1034.50 0
1970-04-02 Perforation 1029.90 1031.40 13
1970-04-02 Perforation 844.90 846.10 13
1970-04-02 Perforation 863.20 868.10 13
1970-04-07 Acid Wash 1029.90 1031.40 0
1970-04-07 Acid Wash 844.90 846.10 0
1970-04-07 Acid Wash 863.20 868.10 0
1970-10-13 Acid Wash 863.20 868.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1200 0.0 0.0 0.0
1969 8368 0.0 0.0 0.0
1970 3460 0.0 0.0 0.0

For data sources see[5]

References