X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264222906000

Well Details

Well ID: 0264222906000
Loading map...
Location: 00/06-29-026-22W4/0
Location Alias: 00/06-29-26-22 W4M
Location Alias 2: 00/06-29-026-22 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 22
Section: 29
County/Municipality: Wheatland County
Well Name: PCP STANDARD 6-29-26-22
Operator Name: Ovintiv Canada ULC
License Number: 0167350
License Date: 1994-05-24
License Status: RecCertified
Spud Date: 1995-01-04
Final Drill Date: 1995-01-08
Well Total Depth: 1318.00 m
Surface Hole Latitude: 51.246371
Surface Hole Longitude: -113.044431

For data sources see[1][2]

Well History

Date Event
1994-05-24 Obtained License
1995-01-05 Surface Casing Operation Performed
1995-01-08 Finished Drilling
1995-01-09 Well Log Performed
1995-01-10 Production Casing Operation Performed
1995-01-10 Rig Released
1995-01-10 Well Mode changed to Drilled and Cased
1995-02-04 Perforation Treatment Performed - Jet Perforation
1995-02-04 Well Log Performed
1995-02-07 Perforation Treatment Performed - Fractured
1995-02-15 Well Log Performed
1995-02-16 Perforation Treatment Performed - Jet Perforation
1995-02-17 Perforation Treatment Performed - Fractured
1995-02-20 Well Log Performed
1995-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-21 Plug Back Performed
1995-02-21 Well Log Performed
1995-02-22 Perforation Treatment Performed - Jet Perforation
1995-02-23 Perforation Treatment Performed - Fractured
1995-03-28 Well Log Performed
1995-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-29 Well Mode changed to Abandoned Zone
2013-11-01 Well Abandoned
2013-11-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-04 Perforation 1251.00 1253.00 13
1995-02-07 Fracture 1251.00 1253.00 0
1995-02-16 Perforation 1251.00 1253.00 13
1995-02-17 Fracture 1251.00 1253.00 0
1995-02-21 Packing Device Capped w/Cement 1232.00 1240.00 0
1995-02-22 Perforation 695.00 698.00 13
1995-02-22 Perforation 701.00 703.00 13
1995-02-23 Fracture 695.00 703.00 0
1995-04-29 Packing Device Capped w/Cement 677.00 685.00 0

For data sources see[4]



References