X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264252610003

Well Details

Well ID: 0264252610003
Loading map...
Location: 00/10-26-026-25W4/3
Location Alias: 00/10-26-26-25 W4M
Location Alias 2: 00/10-26-026-25 W4/03
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 26
County/Municipality: Rocky View County
Well Name: CPOG GAYFORD 10-26-26-25
Operator Name: Ovintiv Canada ULC
License Number: 0033014
License Date: 1967-11-06
License Status: RecCertified
Spud Date: 1967-11-09
Final Drill Date: 1967-11-26
Well Total Depth: 1786.10 m
Surface Hole Latitude: 51.250765
Surface Hole Longitude: -113.384885

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-06 Obtained License
1967-11-13 Drill Stem Test Performed
1967-11-16 Drill Stem Test Performed
1967-11-24 Drill Stem Test Performed
1967-11-25 Drill Stem Test Performed
1967-11-26 Finished Drilling
1967-11-26 Well Mode changed to Drilled and Cased
1967-11-27 Production Casing Operation Performed
1967-12-06 Perforation Treatment Performed - Bullet Perforation
1993-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-05 Plug Back Performed
1993-08-05 Well Log Performed
1993-08-09 Perforation Treatment Performed - Jet Perforation
1993-08-09 Well Log Performed
1993-08-10 Perforation Treatment Performed - Cement Squeeze
1993-08-11 Perforation Treatment Performed - Jet Perforation
1993-08-11 Well Log Performed
1993-09-03 Perforation Treatment Performed - Cement Squeeze
1993-09-10 Perforation Treatment Performed - Jet Perforation
1993-09-10 Well Log Performed
1993-09-13 Well Log Performed
1993-09-14 Perforation Treatment Performed - Cement Squeeze
1993-09-22 Perforation Treatment Performed - Jet Perforation
1993-09-22 Well Log Performed
1993-09-23 Perforation Treatment Performed - Fractured
1993-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-29 Perforation Treatment Performed - Jet Perforation
1993-09-29 Plug Back Performed
1993-09-29 Well Log Performed
1993-09-30 Perforation Treatment Performed - Jet Perforation
1993-10-04 Perforation Treatment Performed - Fractured
1993-10-06 Perforation Treatment Performed - Jet Perforation
1993-10-06 Well Log Performed
1993-10-12 Perforation Treatment Performed - Fractured
1993-10-19 Well Log Performed
1993-10-27 Perforation Treatment Performed - Jet Perforation
1993-10-27 Well Log Performed
1994-04-23 Well Began Production
1994-04-23 Well Fluid changed to Gas
1994-04-23 Well Mode changed to Flowing
1994-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-23 Plug Back Performed
1994-12-23 Well Fluid changed to Gas
1994-12-23 Well Mode changed to Abandoned
1995-09-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-12-06 Bullet Perforation 1759.30 1761.70 13
1993-09-10 Perforation 1478.90 1480.70 20
1993-09-14 Cement Squeeze 1463.00 1464.00 0
1993-09-22 Perforation 1474.00 1477.10 20
1993-09-22 Perforation 1478.90 1480.70 20
1993-09-23 Fracture 1474.00 1480.70 0
1993-09-29 Packing Device Capped w/Cement 1447.00 1453.00 0
1993-09-29 Perforation 889.40 891.20 20
1993-09-29 Perforation 894.90 896.70 20
1993-09-30 Perforation 883.90 886.10 20
1993-10-04 Fracture 883.90 896.70 0
1993-08-05 Packing Device Capped w/Cement 1575.00 1583.00 0
1993-10-06 Perforation 864.40 865.60 20
1993-10-06 Perforation 867.50 868.40 20
1993-10-06 Perforation 872.60 874.80 20
1993-10-12 Fracture 864.40 874.80 0
1993-10-27 Perforation 852.20 854.70 20
1993-10-27 Perforation 856.20 858.30 20
1994-12-23 Packing Device Capped w/Cement 833.80 841.80 0
1993-08-09 Perforation 1463.00 1464.00 14
1993-08-09 Perforation 1493.00 1494.00 14
1993-08-10 Cement Squeeze 1493.00 1494.00 0
1993-08-11 Perforation 824.00 825.00 14
1993-08-11 Perforation 930.00 931.00 14
1993-09-03 Cement Squeeze 824.00 931.00 0
1993-09-10 Perforation 1474.00 1477.10 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3860 0.0 0.0 0.0

For data sources see[5]

References