X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284201801002

Well Details

Well ID: 0284201801002
Loading map...
Location: 00/01-18-028-20W4/2
Location Alias: 00/01-18-28-20 W4M
Location Alias 2: 00/01-18-028-20 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 20
Section: 18
County/Municipality: Kneehill County
Well Name: PCP PCR WAYNE-ROSEDALE 1-18-28-20
Operator Name: Lynx Energy ULC
License Number: 0251206
License Date: 2001-02-14
License Status: Suspension
Spud Date: 2001-03-16
Final Drill Date: 2001-03-20
Well Total Depth: 1541.00 m
Surface Hole Latitude: 51.386234
Surface Hole Longitude: -112.800430

For data sources see[1][2]

Well History

Date Event
2001-02-14 Obtained License
2001-03-17 Direction Drilling Operation Performed - Deviate
2001-03-17 Surface Casing Operation Performed
2001-03-20 Finished Drilling
2001-03-20 Well Log Performed
2001-03-20 Well Mode changed to Drilled and Cased
2001-03-21 Production Casing Operation Performed
2001-03-21 Rig Released
2001-03-21 Well Log Performed
2001-03-29 Well Log Performed
2001-03-30 Perforation Treatment Performed - Jet Perforation
2001-04-12 Perforation Treatment Performed - Jet Perforation
2001-04-12 Well Log Performed
2007-09-27 Perforation Treatment Performed - Jet Perforation
2007-09-27 Well Log Performed
2007-09-29 Perforation Treatment Performed - Fractured
2007-10-29 Well Began Production
2007-10-29 Well Fluid changed to Gas
2007-10-29 Well Mode changed to Flowing
2012-04-12 Well Fluid changed to Gas
2012-04-12 Well Mode changed to Suspended
2012-05-28 Perforation Treatment Performed - Jet Perforation
2012-05-28 Well Log Performed
2012-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-29 Plug Back Performed
2012-07-29 Well Log Performed
2012-08-14 Well Fluid changed to Gas
2012-08-14 Well Mode changed to Flowing
2013-07-22 Perforation Treatment Performed - Jet Perforation
2013-07-22 Well Log Performed
2013-08-02 Perforation Treatment Performed - Fractured
2013-08-14 Well Fluid changed to Gas
2013-08-14 Well Mode changed to Suspended
2013-08-15 Well Fluid changed to Gas
2013-08-15 Well Mode changed to Flowing
2017-07-18 Well Fluid changed to Gas
2017-07-18 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-03-17 330.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-30 Perforation 1501.00 1504.00 17
2013-08-02 Fracture 658.50 662.50 0
2013-08-02 Fracture 565.00 568.00 0
2001-04-12 Perforation 1486.00 1488.00 17
2007-09-27 Perforation 1296.00 1298.00 26
2007-09-27 Perforation 1284.00 1286.00 26
2007-09-29 Fracture 1284.00 1286.00 0
2012-05-28 Perforation 1261.00 1263.00 17
2012-07-29 Packing Device Capped w/Cement 1388.00 1396.00 0
2013-07-22 Perforation 658.50 662.50 13
2013-07-22 Perforation 565.00 568.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1491 0.0 0.0 0.0
2008 8039 0.0 0.0 0.0
2009 6001 0.0 0.0 0.0
2010 1320 0.0 0.0 0.0
2012 511 0.0 0.0 0.0
2013 2641 0.0 0.0 0.0
2014 116 0.0 0.0 0.0
2015 3 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-04-12 No Incident Encountered 0.00 0.00
2012-07-29 No Incident Encountered 0.00 0.00
2012-07-29 No Incident Encountered 0.00 0.00
2013-08-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References