X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284223116005

Well Details

Well ID: 0284223116005
Loading map...
Location: 00/16-31-028-22W4/5
Location Alias: 00/16-31-28-22 W4M
Location Alias 2: 00/16-31-028-22 W4/05
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 22
Section: 31
County/Municipality: Kneehill County
Well Name: PCP CARBON 16-31-28-22
Operator Name: Lynx Energy ULC
License Number: 0195035
License Date: 1996-12-12
License Status: Issued
Spud Date: 1997-02-16
Final Drill Date: 1997-02-22
Well Total Depth: 1545.00 m
Surface Hole Latitude: 51.441620
Surface Hole Longitude: -113.076459

For data sources see[1][2]

Well History

Date Event
1996-12-12 Obtained License
1997-02-17 Surface Casing Operation Performed
1997-02-22 Finished Drilling
1997-02-22 Well Log Performed
1997-02-22 Well Mode changed to Drilled and Cased
1997-02-23 Well Log Performed
1997-02-24 Production Casing Operation Performed
1997-02-24 Rig Released
1997-02-28 Well Log Performed
1997-03-01 Perforation Treatment Performed - Jet Perforation
1997-12-17 Well Log Performed
1997-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-18 Plug Back Performed
1997-12-18 Well Log Performed
1997-12-19 Perforation Treatment Performed - Jet Perforation
2001-05-21 Perforation Treatment Performed - Jet Perforation
2001-05-21 Well Log Performed
2001-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-22 Plug Back Performed
2011-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-28 Perforation Treatment Performed - Jet Perforation
2011-06-28 Plug Back Performed
2011-06-28 Well Log Performed
2011-08-09 Perforation Treatment Performed - Fractured
2011-08-16 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-01 Perforation 1471.00 1474.00 20
2011-06-28 Perforation 214.60 215.10 13
2011-06-28 Perforation 217.00 217.50 13
2011-06-28 Perforation 221.00 221.50 13
2011-06-28 Perforation 275.40 277.40 13
2011-06-28 Perforation 281.00 281.50 13
2011-06-28 Perforation 283.10 285.10 13
2011-06-28 Perforation 294.00 294.50 13
2011-06-28 Perforation 304.00 304.50 13
2011-06-28 Perforation 305.00 305.50 13
2011-06-28 Perforation 313.70 314.70 13
1997-03-01 Perforation 1474.00 1478.00 20
2011-06-28 Perforation 315.80 316.30 13
2011-06-28 Perforation 356.50 357.00 13
2011-06-28 Perforation 365.50 366.00 13
2011-06-28 Perforation 375.90 376.40 13
2011-06-28 Perforation 399.40 399.90 13
2011-06-28 Perforation 432.90 433.40 13
2011-06-28 Perforation 435.80 436.30 13
2011-06-28 Perforation 436.80 437.30 13
2011-06-28 Perforation 440.30 440.80 13
2011-06-28 Perforation 261.00 265.00 13
1997-12-18 Packing Device Capped w/Cement 1450.00 1458.00 0
2011-06-28 Perforation 317.00 319.00 13
2011-06-28 Perforation 332.00 334.00 13
2011-08-09 Fracture 214.60 440.80 0
1997-12-19 Perforation 1279.00 1282.00 17
2001-05-21 Perforation 522.50 525.00 20
2001-05-21 Perforation 512.50 516.00 20
2001-05-21 Perforation 508.00 510.00 20
2001-05-22 Packing Device Capped w/Cement 1265.00 1275.00 0
2011-06-28 Packing Device Capped w/Cement 495.00 503.00 0

For data sources see[4]



References