X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284232012002

Well Details

Well ID: 0284232012002
Loading map...
Location: 00/12-20-028-23W4/2
Location Alias: 00/12-20-28-23 W4M
Location Alias 2: 00/12-20-028-23 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 23
Section: 20
County/Municipality: Kneehill County
Well Name: PEGASUS ENTICE 12-20-28-23
Operator Name: Harvest Operations Corp.
License Number: 0165316
License Date: 1994-02-22
License Status: Abandoned
Spud Date: 1994-03-10
Final Drill Date: 1994-03-22
Well Total Depth: 2090.00 m
Surface Hole Latitude: 51.411243
Surface Hole Longitude: -113.213668

For data sources see[1][2]

Well History

Date Event
1994-02-22 Obtained License
1994-03-11 Surface Casing Operation Performed
1994-03-22 Finished Drilling
1994-03-22 Well Log Performed
1994-03-22 Well Mode changed to Drilled and Cased
1994-03-23 Well Log Performed
1994-03-24 Well Log Performed
1994-03-25 Drill Stem Test Performed
1994-03-27 Production Casing Operation Performed
1994-03-27 Rig Released
1994-09-27 Well Log Performed
1994-09-28 Well Log Performed
1994-09-29 Perforation Treatment Performed - Jet Perforation
1994-09-29 Perforation Treatment Performed - Remedial Casing
1994-10-02 Well Log Performed
1994-10-03 Well Log Performed
1994-10-04 Perforation Treatment Performed - Jet Perforation
1994-10-05 Perforation Treatment Performed - Remedial Casing
1994-10-09 Well Log Performed
1994-10-10 Perforation Treatment Performed - Jet Perforation
1994-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-13 Well Log Performed
1994-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-14 Plug Back Performed
2005-02-12 Perforation Treatment Performed - Jet Perforation
2005-03-01 Perforation Treatment Performed - Jet Perforation
2005-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-04 Plug Back Performed
2005-03-04 Well Mode changed to Abandoned Zone
2005-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-19 Plug Back Performed
2005-05-03 Perforation Treatment Performed - Jet Perforation
2005-05-11 Perforation Treatment Performed - Fractured
2006-01-11 Well Log Performed
2009-03-17 Perforation Treatment Performed - Jet Perforation
2009-03-17 Well Log Performed
2012-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-10 Plug Back Performed
2012-09-10 Well Log Performed
2012-09-11 Well Log Performed
2012-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-12 Perforation Treatment Performed - Jet Perforation
2012-09-12 Plug Back Performed
2012-09-12 Well Log Performed
2012-09-13 Perforation Treatment Performed - Cement Plug
2012-09-13 Perforation Treatment Performed - Remedial Casing
2012-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-14 Plug Back Performed
2012-10-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-29 Perforation 642.00 643.00 13
2005-02-12 Perforation 576.00 579.00 13
2005-03-01 Perforation 567.00 569.00 20
2005-03-04 Packing Device Capped w/Cement 567.50 574.50 0
2005-03-19 Packing Device Capped w/Cement 551.50 559.50 0
2005-05-03 Perforation 450.20 450.70 13
2005-05-03 Perforation 444.90 445.40 13
2005-05-03 Perforation 435.90 436.40 13
2005-05-03 Perforation 403.40 403.90 13
2005-05-03 Perforation 398.80 399.30 13
2005-05-03 Perforation 395.00 395.50 13
1994-09-29 Remedial Casing Cementing 642.00 643.00 0
2005-05-03 Perforation 392.70 393.20 13
2005-05-03 Perforation 385.00 385.50 13
2005-05-03 Perforation 382.70 383.20 13
2005-05-03 Perforation 380.20 380.70 13
2005-05-03 Perforation 372.10 372.60 13
2005-05-03 Perforation 368.70 369.20 13
2005-05-03 Perforation 358.60 359.10 13
2005-05-03 Perforation 357.10 357.60 13
2005-05-03 Perforation 354.20 354.70 13
2005-05-03 Perforation 352.50 353.00 13
1994-10-04 Perforation 466.50 467.50 13
2005-05-03 Perforation 349.40 349.90 13
2005-05-03 Perforation 347.00 347.50 13
2005-05-11 Fracture 347.00 450.70 0
2009-03-17 Perforation 1603.00 1608.00 14
2009-03-17 Perforation 1611.00 1617.00 14
2012-09-10 Packing Device Capped w/Cement 1580.00 1588.00 0
2012-09-12 Perforation 499.00 500.00 17
2012-09-12 Packing Device Capped w/Cement 552.00 560.00 0
2012-09-13 Cement Plug 445.00 492.00 0
2012-09-13 Remedial Casing Cementing 499.00 500.00 0
1994-10-05 Remedial Casing Cementing 466.50 467.50 0
2012-09-13 Cement Plug 492.00 501.00 0
2012-09-14 Packing Device Capped w/Cement 329.00 337.00 0
1994-10-10 Perforation 1648.00 1650.50 13
1994-10-10 Perforation 1651.50 1653.50 13
1994-10-10 Perforation 1663.60 1666.50 13
1994-10-12 Acid Treatment 1648.00 1666.50 0
1994-10-14 Packing Device Capped w/Cement 1632.00 1640.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-03-17 No Incident Encountered 0.00 0.00
2012-09-14 No Incident Encountered 0.00 0.00
2012-09-14 No Incident Encountered 0.00 0.00
2012-09-14 No Incident Encountered 0.00 0.00

For data sources see[5]

References