If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284243011002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.425854,"lon":-113.371662,"icon":""}]} |
Location: 00/11-30-028-24W4/2 | |
Location Alias: 00/11-30-28-24 W4M | |
Location Alias 2: 00/11-30-028-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 11-30-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0383160 | |
License Date: 2007-10-12 | |
License Status: Issued | |
Spud Date: 2007-11-11 | |
Final Drill Date: 2007-11-16 | |
Well Total Depth: 708.00 m | |
Surface Hole Latitude: 51.425854 | |
Surface Hole Longitude: -113.371662 |
Date | Event |
---|---|
2007-10-12 | Obtained License |
2007-11-11 | Surface Casing Operation Performed |
2007-11-16 | Finished Drilling |
2007-11-16 | Production Casing Operation Performed |
2007-11-16 | Rig Released |
2007-11-16 | Well Mode changed to Drilled and Cased |
2007-11-19 | Well Log Performed |
2007-12-04 | Perforation Treatment Performed - Jet Perforation |
2007-12-21 | Perforation Treatment Performed - Jet Perforation |
2008-01-20 | Perforation Treatment Performed - Fractured |
2008-02-10 | Perforation Treatment Performed - Jet Perforation |
2008-02-17 | Perforation Treatment Performed - Fractured |
2008-02-28 | Well Began Production |
2008-02-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-02-28 | Well Mode changed to Flowing |
2010-08-16 | Perforation Treatment Performed - Jet Perforation |
2010-10-14 | Perforation Treatment Performed - Fractured |
2010-10-30 | Perforation Treatment Performed - Fractured |
2010-11-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-13 | Well Mode changed to Flowing |
2017-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-12-04 | Perforation | 671.00 | 674.00 | 13 |
2008-02-10 | Perforation | 529.20 | 529.70 | 13 |
2008-02-10 | Perforation | 521.70 | 522.20 | 13 |
2008-02-10 | Perforation | 476.50 | 477.00 | 13 |
2008-02-10 | Perforation | 467.40 | 469.40 | 13 |
2008-02-10 | Perforation | 465.70 | 466.20 | 13 |
2008-02-10 | Perforation | 441.20 | 441.70 | 13 |
2008-02-10 | Perforation | 432.40 | 432.90 | 13 |
2008-02-10 | Perforation | 415.60 | 417.60 | 13 |
2008-02-10 | Perforation | 411.40 | 411.90 | 13 |
2008-02-10 | Perforation | 320.50 | 321.00 | 13 |
2007-12-21 | Perforation | 661.00 | 663.00 | 13 |
2008-02-10 | Perforation | 314.40 | 315.40 | 13 |
2008-02-10 | Perforation | 240.60 | 241.10 | 13 |
2008-02-17 | Fracture | 240.60 | 588.20 | 0 |
2010-08-16 | Perforation | 495.00 | 497.00 | 13 |
2010-08-16 | Perforation | 458.00 | 461.00 | 13 |
2010-08-16 | Perforation | 393.00 | 395.00 | 13 |
2010-08-16 | Perforation | 356.00 | 357.00 | 13 |
2010-08-16 | Perforation | 340.00 | 341.00 | 13 |
2010-08-16 | Perforation | 334.00 | 336.00 | 13 |
2010-08-16 | Perforation | 307.00 | 308.00 | 13 |
2008-01-20 | Fracture | 661.00 | 663.00 | 0 |
2010-08-16 | Perforation | 263.00 | 265.00 | 13 |
2010-08-16 | Perforation | 209.00 | 211.00 | 13 |
2010-10-14 | Fracture | 458.00 | 461.00 | 0 |
2010-10-30 | Fracture | 209.00 | 497.00 | 0 |
2008-02-10 | Perforation | 587.70 | 588.20 | 13 |
2008-02-10 | Perforation | 570.60 | 571.10 | 13 |
2008-02-10 | Perforation | 553.60 | 554.10 | 13 |
2008-02-10 | Perforation | 547.80 | 548.30 | 13 |
2008-02-10 | Perforation | 540.80 | 541.80 | 13 |
2008-02-10 | Perforation | 533.90 | 534.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7391 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7007 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8570 | 0.0 | 0.0 | 0.0 |
2013 | 8618 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8684 | 0.0 | 0.0 | 0.0 |
2017 | 8649 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8673 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]