If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284243401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.43424,"lon":-113.289181,"icon":""}]} |
Location: 00/01-34-028-24W4/0 | |
Location Alias: 00/01-34-28-24 W4M | |
Location Alias 2: 00/01-34-028-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 34 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 1-34-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0310663 | |
License Date: 2004-06-22 | |
License Status: Issued | |
Spud Date: 2004-07-02 | |
Final Drill Date: 2004-07-27 | |
Well Total Depth: 634.00 m | |
Surface Hole Latitude: 51.434240 | |
Surface Hole Longitude: -113.289181 |
Date | Event |
---|---|
2004-06-22 | Obtained License |
2004-07-02 | Surface Casing Operation Performed |
2004-07-27 | Finished Drilling |
2004-07-27 | Well Mode changed to Drilled and Cased |
2004-07-28 | Production Casing Operation Performed |
2004-07-28 | Rig Released |
2004-08-15 | Well Log Performed |
2004-09-25 | Perforation Treatment Performed - Jet Perforation |
2004-09-27 | Perforation Treatment Performed - Fractured |
2005-12-23 | Well Began Production |
2005-12-23 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-12-23 | Well Mode changed to Flowing |
2011-09-24 | Perforation Treatment Performed - Jet Perforation |
2011-10-03 | Perforation Treatment Performed - Fractured |
2011-10-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-09-25 | Perforation | 197.90 | 198.90 | 13 |
2004-09-25 | Perforation | 386.60 | 387.60 | 13 |
2004-09-25 | Perforation | 391.70 | 392.70 | 13 |
2004-09-25 | Perforation | 394.60 | 395.60 | 13 |
2004-09-25 | Perforation | 416.90 | 417.90 | 13 |
2004-09-25 | Perforation | 424.90 | 426.90 | 13 |
2004-09-25 | Perforation | 429.60 | 430.60 | 13 |
2004-09-25 | Perforation | 441.80 | 442.80 | 13 |
2004-09-25 | Perforation | 473.10 | 474.10 | 13 |
2004-09-25 | Perforation | 478.00 | 479.00 | 13 |
2004-09-25 | Perforation | 482.80 | 483.80 | 13 |
2004-09-25 | Perforation | 257.90 | 258.90 | 13 |
2004-09-25 | Perforation | 494.60 | 495.60 | 13 |
2004-09-25 | Perforation | 501.60 | 502.60 | 13 |
2004-09-25 | Perforation | 508.00 | 509.00 | 13 |
2004-09-25 | Perforation | 512.20 | 513.20 | 13 |
2004-09-25 | Perforation | 524.90 | 525.90 | 13 |
2004-09-25 | Perforation | 540.10 | 541.10 | 13 |
2004-09-25 | Perforation | 549.10 | 550.10 | 13 |
2004-09-25 | Perforation | 555.70 | 556.70 | 13 |
2004-09-27 | Fracture | 197.90 | 556.70 | 0 |
2011-09-24 | Perforation | 270.10 | 272.10 | 13 |
2004-09-25 | Perforation | 272.10 | 273.10 | 13 |
2011-09-24 | Perforation | 281.00 | 283.00 | 13 |
2011-09-24 | Perforation | 292.00 | 294.00 | 13 |
2011-09-24 | Perforation | 304.00 | 305.00 | 13 |
2011-09-24 | Perforation | 314.00 | 315.00 | 13 |
2011-09-24 | Perforation | 318.30 | 320.30 | 13 |
2011-09-24 | Perforation | 420.00 | 422.00 | 13 |
2011-09-24 | Perforation | 446.50 | 447.50 | 13 |
2011-10-03 | Fracture | 257.90 | 556.70 | 0 |
2004-09-25 | Perforation | 320.30 | 321.30 | 13 |
2004-09-25 | Perforation | 360.30 | 361.30 | 13 |
2004-09-25 | Perforation | 367.40 | 368.40 | 13 |
2004-09-25 | Perforation | 369.40 | 370.40 | 13 |
2004-09-25 | Perforation | 374.60 | 375.60 | 13 |
2004-09-25 | Perforation | 376.60 | 377.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 216 | 0.0 | 0.0 | 0.0 |
2006 | 8701 | 0.0 | 0.0 | 0.0 |
2007 | 8079 | 0.0 | 0.0 | 0.0 |
2008 | 8471 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8500 | 0.0 | 0.0 | 0.0 |
2011 | 8295 | 0.0 | 0.0 | 0.0 |
2012 | 8548 | 0.0 | 0.0 | 0.0 |
2013 | 8337 | 0.0 | 0.0 | 0.0 |
2014 | 8664 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8572 | 0.0 | 0.0 | 0.0 |
2018 | 8666 | 0.0 | 0.0 | 0.0 |
2019 | 8640 | 0.0 | 0.0 | 0.0 |
2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]