X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294220906000

Well Details

Well ID: 0294220906000
Loading map...
Location: 00/06-09-029-22W4/0
Location Alias: 00/06-09-29-22 W4M
Location Alias 2: 00/06-09-029-22 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 22
Section: 09
County/Municipality: Kneehill County
Well Name: CWNG CARBON 6-9-29-22
Operator Name: ATCO Energy Solutions Ltd.
License Number: 0071155
License Date: 1978-08-04
License Status: Suspension
Spud Date: 1978-08-07
Final Drill Date: 1978-08-21
Well Total Depth: 1542.00 m
Surface Hole Latitude: 51.463452
Surface Hole Longitude: -113.046028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-04 Obtained License
1978-08-07 Lost Circulation Occurred
1978-08-13 Drill Stem Test Performed
1978-08-15 Drill Stem Test Performed
1978-08-21 Drill Stem Test Performed
1978-08-21 Finished Drilling
1978-08-21 Well Mode changed to Drilled and Cased
1978-08-22 Drill Stem Test Performed
1978-08-23 Drill Stem Test Performed
1978-08-24 Drill Stem Test Performed
1978-08-27 Production Casing Operation Performed
1978-09-05 Perforation Treatment Performed - Jet Perforation
1978-09-05 Well Log Performed
1978-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-19 Well Began Production
1978-09-19 Well Fluid changed to Crude Oil
1978-09-19 Well Mode changed to Pumping
1979-01-12 Well Fluid changed to Crude Oil
1979-01-12 Well Mode changed to Suspended
1979-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-11 Perforation Treatment Performed - Jet Perforation
1979-08-11 Well Fluid changed to Crude Oil
1979-08-11 Well Log Performed
1979-08-11 Well Mode changed to Abandoned Zone
1979-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-02 Perforation Treatment Performed - Fractured
1980-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-19 Perforation Treatment Performed - Jet Perforation
1980-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-05 Perforation 1527.00 1529.00 7
1980-03-19 Perforation 1253.50 1254.50 3
1980-03-19 Perforation 1261.80 1262.80 3
1980-03-19 Perforation 1272.00 1273.00 3
1980-03-19 Perforation 1270.00 1271.50 3
1980-03-20 Acid Treatment 1253.50 1271.50 0
1980-03-21 Fracture 1253.50 1271.50 0
1978-09-06 Acid Treatment 1527.00 1529.00 0
1979-08-10 Packing Device Capped w/Cement 1515.00 1515.00 0
1979-08-11 Perforation 1473.50 1474.00 8
1979-08-11 Perforation 1474.50 1475.00 8
1979-08-11 Perforation 1480.50 1482.60 6
1979-08-31 Acid Treatment 1473.50 1482.60 0
1979-09-02 Fracture 1473.50 1482.60 0
1980-03-14 Packing Device Capped w/Cement 1465.00 1465.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 580 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-08-07 Lost Circulation 117.00 117.00

For data sources see[6]

References