X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294222606000

Well Details

Well ID: 0294222606000
Loading map...
Location: 00/06-26-029-22W4/0
Location Alias: 00/06-26-29-22 W4M
Location Alias 2: 00/06-26-029-22 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 22
Section: 26
County/Municipality: Kneehill County
Well Name: ERC GPINE 6-26-29-22
Operator Name: TAQA North Ltd.
License Number: 0066310
License Date: 1977-10-24
License Status: Issued
Spud Date: 1977-12-08
Final Drill Date: 1977-12-22
Well Total Depth: 1860.80 m
Surface Hole Latitude: 51.510134
Surface Hole Longitude: -112.994467

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-24 Obtained License
1977-12-08 Lost Circulation Occurred
1977-12-14 Drill Stem Test Performed
1977-12-22 Finished Drilling
1977-12-24 Production Casing Operation Performed
1978-01-11 Perforation Treatment Performed - Jet Perforation
1978-01-12 Perforation Treatment Performed - Cement Squeeze
1978-01-14 Perforation Treatment Performed - Jet Perforation
1978-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-19 Perforation Treatment Performed - Jet Perforation
1978-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-21 Perforation Treatment Performed - Jet Perforation
1978-01-29 Well Mode changed to Drilled and Cased
1985-11-08 Well Began Production
1985-11-08 Well Fluid changed to Gas
1985-11-08 Well Mode changed to Flowing
1992-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-18 Perforation Treatment Performed - Jet Perforation
1992-11-18 Plug Back Performed
1992-11-18 Well Fluid changed to Gas
1992-11-18 Well Mode changed to Abandoned Zone
1992-11-20 Perforation Treatment Performed - Fractured
1992-11-22 Perforation Treatment Performed - Jet Perforation
1992-11-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-11 Perforation 1300.60 1300.90 16
1978-01-21 Perforation 1258.50 1261.00 7
1992-11-18 Packing Device Capped w/Cement 1243.00 1251.00 0
1992-11-18 Perforation 674.80 678.20 13
1992-11-20 Fracture 674.80 678.20 0
1992-11-22 Perforation 460.20 464.00 13
1992-11-23 Fracture 460.20 464.00 0
1978-01-11 Perforation 1423.40 1423.70 16
1978-01-12 Cement Squeeze 1300.60 1423.70 0
1978-01-14 Perforation 1412.40 1414.30 13
1978-01-17 Acid Treatment 1412.40 1414.30 0
1978-01-18 Packing Device Capped w/Cement 1394.50 1402.10 0
1978-01-19 Perforation 1327.10 1329.50 7
1978-01-20 Acid Treatment 1327.10 1329.50 0
1978-01-21 Packing Device Capped w/Cement 1287.80 1295.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 432 0.0 0.0 0.0
1986 6141 0.0 0.0 0.0
1987 6970 0.0 0.0 0.0
1988 7561 0.0 0.0 0.0
1989 8182 0.0 0.0 0.0
1990 5757 0.0 0.0 0.0
1991 3519 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-08 Lost Circulation 18.30 71.60

For data sources see[6]

References