X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294231014002

Well Details

Well ID: 0294231014002
Loading map...
Location: 00/14-10-029-23W4/2
Location Alias: 00/14-10-29-23 W4M
Location Alias 2: 00/14-10-029-23 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 10
County/Municipality: Kneehill County
Well Name: ECA ECOG CARBON 14-10-29-23
Operator Name: Lynx Energy ULC
License Number: 0408738
License Date: 2009-01-28
License Status: Issued
Spud Date: 2009-02-05
Final Drill Date: 2009-02-08
Well Total Depth: 1591.00 m
Surface Hole Latitude: 51.470692
Surface Hole Longitude: -113.161642

For data sources see[1][2]

Well History

Date Event
2009-01-28 Obtained License
2009-02-05 Surface Casing Operation Performed
2009-02-08 Finished Drilling
2009-02-08 Production Casing Operation Performed
2009-02-08 Well Log Performed
2009-02-08 Well Mode changed to Drilled and Cased
2009-02-09 Rig Released
2009-02-14 Perforation Treatment Performed - Jet Perforation
2009-02-14 Well Log Performed
2009-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-02 Perforation Treatment Performed - Jet Perforation
2009-06-02 Plug Back Performed
2009-06-02 Well Log Performed
2009-06-11 Perforation Treatment Performed - Fractured
2009-06-12 Well Fluid changed to Gas
2009-06-12 Well Mode changed to Testing
2009-06-26 Well Began Production
2009-06-26 Well Fluid changed to Gas
2009-06-26 Well Mode changed to Flowing
2010-11-12 Perforation Treatment Performed - Jet Perforation
2010-11-12 Well Log Performed
2010-11-15 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-14 Perforation 1555.50 1558.00 17
2009-02-18 Acid Treatment 1555.50 1558.00 0
2009-06-02 Packing Device Capped w/Cement 1545.00 1553.00 0
2009-06-02 Perforation 1299.50 1300.50 17
2009-06-11 Fracture 1299.50 1300.50 0
2010-11-12 Perforation 1304.00 1305.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 4561 0.0 0.0 0.0
2010 6112 0.0 0.0 0.0

For data sources see[5]

References