X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294232008000

Well Details

Well ID: 0294232008000
Loading map...
Location: 00/08-20-029-23W4/0
Location Alias: 00/08-20-29-23 W4M
Location Alias 2: 00/08-20-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 20
County/Municipality: Kneehill County
Well Name: ECA CARBON 8-20-29-23
Operator Name: Lynx Energy ULC
License Number: 0335299
License Date: 2005-07-26
License Status: Issued
Spud Date: 2005-08-05
Final Drill Date: 2005-08-05
Well Total Depth: 793.00 m
Surface Hole Latitude: 51.492536
Surface Hole Longitude: -113.197159

For data sources see[1][2]

Well History

Date Event
2005-07-26 Obtained License
2005-08-01 Surface Casing Operation Performed
2005-08-05 Finished Drilling
2005-08-05 Production Casing Operation Performed
2005-08-05 Rig Released
2005-08-05 Well Mode changed to Drilled and Cased
2005-08-12 Well Log Performed
2005-10-11 Perforation Treatment Performed - Jet Perforation
2005-10-19 Perforation Treatment Performed - Jet Perforation
2005-10-31 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-11 Perforation 485.00 489.00 14
2005-10-19 Perforation 292.30 293.30 14
2005-10-19 Perforation 302.50 304.00 21
2005-10-19 Perforation 307.90 308.40 7
2005-10-19 Perforation 312.50 314.00 21
2005-10-19 Perforation 315.50 317.50 28
2005-10-19 Perforation 332.50 334.00 21
2005-10-19 Perforation 338.10 339.60 21
2005-10-19 Perforation 345.30 347.80 35
2005-10-19 Perforation 351.00 353.00 28
2005-10-19 Perforation 377.00 377.50 7
2005-10-11 Perforation 491.20 493.20 14
2005-10-19 Perforation 385.80 386.30 7
2005-10-19 Perforation 392.10 393.10 14
2005-10-19 Perforation 399.70 400.70 14
2005-10-19 Perforation 407.50 408.00 14
2005-10-19 Perforation 413.00 414.00 14
2005-10-19 Perforation 445.00 445.50 7
2005-10-31 Fracture 445.00 445.50 0
2005-10-31 Fracture 413.00 414.00 0
2005-10-31 Fracture 407.50 408.00 0
2005-10-31 Fracture 399.70 400.70 0
2005-10-11 Perforation 507.00 509.00 14
2005-10-31 Fracture 392.10 393.10 0
2005-10-31 Fracture 385.80 386.30 0
2005-10-31 Fracture 377.00 377.50 0
2005-10-31 Fracture 351.00 353.00 0
2005-10-31 Fracture 345.30 347.80 0
2005-10-31 Fracture 338.10 339.60 0
2005-10-31 Fracture 332.50 334.00 0
2005-10-31 Fracture 312.50 317.50 0
2005-10-31 Fracture 302.50 308.40 0
2005-10-31 Fracture 289.00 293.30 0
2005-10-11 Perforation 509.70 512.20 14
2005-10-31 Fracture 243.70 244.20 0
2005-10-31 Fracture 236.50 237.00 0
2005-10-11 Perforation 513.00 515.50 14
2005-10-11 Perforation 742.50 743.50 14
2005-10-19 Perforation 236.50 237.00 7
2005-10-19 Perforation 243.70 244.20 7
2005-10-19 Perforation 289.00 290.00 14

For data sources see[4]



References