X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294232816000

Well Details

Well ID: 0294232816000
Loading map...
Location: 00/16-28-029-23W4/0
Location Alias: 00/16-28-29-23 W4M
Location Alias 2: 00/16-28-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 28
County/Municipality: Kneehill County
Well Name: ECA CARBON 16-28-29-23
Operator Name: Lynx Energy ULC
License Number: 0335224
License Date: 2005-07-25
License Status: Amended
Spud Date: 2005-07-30
Final Drill Date: 2005-08-05
Well Total Depth: 819.00 m
Surface Hole Latitude: 51.514857
Surface Hole Longitude: -113.170528

For data sources see[1][2]

Well History

Date Event
2005-07-25 Obtained License
2005-07-31 Surface Casing Operation Performed
2005-08-05 Finished Drilling
2005-08-05 Production Casing Operation Performed
2005-08-05 Rig Released
2005-08-05 Well Mode changed to Drilled and Cased
2005-08-11 Well Log Performed
2005-09-02 Perforation Treatment Performed - Jet Perforation
2005-09-06 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-09-06 Perforation Treatment Performed - Jet Perforation
2005-09-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-02 Perforation 572.00 574.00 13
2005-09-06 Perforation 410.50 411.00 13
2005-09-06 Perforation 413.50 416.50 13
2005-09-06 Perforation 446.00 446.50 13
2005-09-06 Perforation 461.50 462.50 13
2005-09-06 Perforation 469.50 470.50 13
2005-09-06 Perforation 477.00 477.50 13
2005-09-06 Perforation 484.20 485.20 13
2005-09-06 Perforation 514.60 515.10 13
2005-09-20 Fracture 514.60 515.10 0
2005-09-20 Fracture 484.20 485.20 0
2005-09-06 Bridge Plug, No Cement 566.80 567.20 0
2005-09-20 Fracture 477.00 477.50 0
2005-09-20 Fracture 469.50 470.50 0
2005-09-20 Fracture 461.50 462.50 0
2005-09-20 Fracture 446.00 446.50 0
2005-09-20 Fracture 413.50 416.50 0
2005-09-20 Fracture 410.50 411.00 0
2005-09-20 Fracture 410.50 411.00 0
2005-09-20 Fracture 373.20 377.70 0
2005-09-20 Fracture 360.00 360.50 0
2005-09-20 Fracture 357.50 360.50 0
2005-09-06 Perforation 315.70 316.70 13
2005-09-20 Fracture 315.70 316.70 0
2005-09-06 Perforation 357.50 359.50 13
2005-09-06 Perforation 360.00 360.50 13
2005-09-06 Perforation 363.50 364.00 13
2005-09-06 Perforation 373.20 375.20 13
2005-09-06 Perforation 377.20 377.70 13
2005-09-06 Perforation 404.20 405.20 13

For data sources see[4]



References