X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240508000

Well Details

Well ID: 0294240508000
Loading map...
Location: 00/08-05-029-24W4/0
Location Alias: 00/08-05-29-24 W4M
Location Alias 2: 00/08-05-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 8-5-29-24
Operator Name: Ember Resources Inc.
License Number: 0410952
License Date: 2009-06-15
License Status: Issued
Spud Date: 2009-07-24
Final Drill Date: 2009-07-25
Well Total Depth: 920.00 m
Surface Hole Latitude: 51.452030
Surface Hole Longitude: -113.335023

For data sources see[1][2]

Well History

Date Event
2009-06-15 Obtained License
2009-07-24 Surface Casing Operation Performed
2009-07-25 Finished Drilling
2009-07-25 Production Casing Operation Performed
2009-07-25 Well Mode changed to Drilled and Cased
2009-07-26 Rig Released
2009-09-01 Well Log Performed
2009-10-03 Perforation Treatment Performed - Jet Perforation
2009-10-14 Perforation Treatment Performed - Jet Perforation
2009-10-23 Perforation Treatment Performed - Fractured
2009-11-20 Well Began Production
2009-11-20 Well Fluid changed to Coalbed Methane-Coals and Other
2009-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-03 Perforation 644.60 646.10 13
2009-10-14 Perforation 453.30 454.80 13
2009-10-14 Perforation 468.80 469.30 13
2009-10-14 Perforation 471.90 472.40 13
2009-10-14 Perforation 476.00 477.00 13
2009-10-14 Perforation 520.30 520.80 13
2009-10-14 Perforation 529.00 530.00 13
2009-10-14 Perforation 536.00 536.50 13
2009-10-14 Perforation 543.00 543.50 13
2009-10-14 Perforation 544.00 544.50 13
2009-10-14 Perforation 550.30 550.80 13
2009-10-14 Perforation 226.90 227.40 13
2009-10-14 Perforation 571.60 572.10 13
2009-10-14 Perforation 575.90 576.90 13
2009-10-23 Fracture 575.90 576.90 0
2009-10-23 Fracture 571.60 572.10 0
2009-10-23 Fracture 550.30 550.80 0
2009-10-23 Fracture 543.00 544.50 0
2009-10-23 Fracture 536.00 536.50 0
2009-10-23 Fracture 529.00 530.00 0
2009-10-23 Fracture 520.30 520.80 0
2009-10-23 Fracture 476.00 477.00 0
2009-10-14 Perforation 285.80 286.30 13
2009-10-23 Fracture 468.80 472.40 0
2009-10-23 Fracture 451.20 454.80 0
2009-10-23 Fracture 440.20 440.70 0
2009-10-23 Fracture 430.40 430.90 0
2009-10-23 Fracture 410.90 411.40 0
2009-10-23 Fracture 350.00 350.50 0
2009-10-23 Fracture 285.80 289.10 0
2009-10-23 Fracture 226.90 227.40 0
2009-10-14 Perforation 288.10 289.10 13
2009-10-14 Perforation 350.00 350.50 13
2009-10-14 Perforation 410.90 411.40 13
2009-10-14 Perforation 430.40 430.90 13
2009-10-14 Perforation 440.20 440.70 13
2009-10-14 Perforation 451.20 451.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1008 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8379 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8676 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 7957 0.0 0.0 0.0
2018 5404 0.0 0.0 0.0
2019 6520 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

References